Show Job Controls
Bid Cobra

RED RIVER FM 44 (0427-01-042)

Items: 70

County: RED RIVER
Length: 0.3250 MILES
Highway: FM 44
District: PARIS
Control Number: 0427-01-042
DBE Goal: 0.0%
Project: BR 2B26(126)
Guaranty: $35,000.00
Time: 64 WORKING DAYS
Engineer's Estimate: $1,783,455.25
Date: 09/02/2026 1:00 PM CDT (17 days ago)
Contract Number: 9263015
Type: BRIDGE REPLACEMENT
Project ID: A00195348
Contract Type: FEDERAL
Project Description: BRIDGE REPLACEMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (7)
E
Engineer's Estimate
$1,783,455.25
Over/Under Est: 0.53% $9,452.95
Over/Under Est: 1.4% $25,018.31
Amt Left: 0.87% $15,565.36
$1,831,144.68
Over/Under Est: 2.67% $47,689.43
Amt Left: 2.13% $38,236.48
Delta: -1.25% -$22,671.12
Over/Under Est: 4.23% $75,378.40
Amt Left: 3.68% $65,925.45
Delta: -1.51% -$27,688.97
$1,864,148.67
Over/Under Est: 4.52% $80,693.42
Amt Left: 3.97% $71,240.47
Delta: -0.29% -$5,315.02
$1,913,034.03
Over/Under Est: 7.27% $129,578.78
Amt Left: 6.7% $120,125.83
Delta: -2.62% -$48,885.36
Over/Under Est: 20.34% $362,841.55
Amt Left: 19.71% $353,388.60
Delta: -12.19% -$233,262.77

Bid Items & Bid Tabulations

70 Total 0 of 70
RED RIVER  |  FM 44  |  PARIS  |  0427-01-042  |  09/02/2026 1:00 PM CDT  |  $1,783,455.25  |  BR 2B26(126)  |  BRIDGE REPL  |  64 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
EAST TEXAS BRIDGE, INC.
RB CONTRACTING, LLC
LONGVIEW BRIDGE AND ROAD, LTD.
L & N BRIDGE, LLC
THK CONSTRUCTION LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREPARING ROW
STA 17.150 $1,400.000 $2,150.000 $2,500.000 $2,300.000 $1,750.000 $1,500.000 $2,000.000 $2,500.000
REMOV CONC (DRIVEWAYS)
SY 55.000 $20.000 $25.000 $15.000 $30.000 $16.000 $12.000 $30.000 $30.000
EXCAV (ROADWAY)
CY 837.000 $25.000 $10.000 $16.000 $15.000 $20.000 $8.000 $20.000 $10.000
EXCAV (CHANNEL)
CY 379.000 $20.000 $10.000 $20.000 $15.000 $20.000 $8.000 $20.000 $8.000
EMBANK (FNL)(DC)(TY C)
CY 2,042.000 $35.000 $22.000 $22.000 $50.000 $70.000 $40.000 $15.000 $60.000
EMBANK (VEH)(OC)(TY B)
CY 2,878.000 $20.000 $20.000 $18.000 $17.000 $20.000 $20.000 $15.000 $60.000
BROADCAST SEED (TEMP_WARM)
SY 7,594.000 $0.250 $1.000 $0.320 $0.320 $0.200 $0.300 $0.080 $0.350
BROADCAST SEED (TEMP_COOL)
SY 7,594.000 $0.250 $1.000 $0.320 $0.320 $0.300 $0.340 $0.100 $0.350
STRAW/HAY MLCH SEED(PERM_RURAL_CLAY)
SY 15,188.000 $0.550 $1.000 $0.550 $0.540 $0.500 $0.380 $0.380 $0.400
VEGETATIVE WATERING
TGL 91.300 $40.000 $10.000 $40.000 $10.000 $34.000 $50.000 $1.000 $1.000
REWORK BS MTL (TY C)(6")(ORD COMP)
SY 4,293.000 $4.000 $2.600 $6.000 $7.000 $5.000 $4.000 $20.000 $4.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 1,152.000 $165.000 $150.000 $157.000 $170.000 $150.000 $151.600 $170.180 $170.000
D-GR HMA TY-C SAC-A PG64-22(EXEMPT)
TON 828.000 $175.000 $158.000 $160.000 $170.000 $153.000 $155.600 $177.310 $160.000
TACK COAT
GAL 329.000 $6.000 $10.000 $6.000 $12.000 $4.000 $9.800 $10.540 $15.000
CEM STABIL BKFL
CY 157.000 $230.000 $250.000 $200.000 $250.000 $382.000 $200.000 $300.000 $290.000
TEMPORARY SPL SHORING
SF 480.000 $30.000 $55.000 $55.000 $20.000 $54.000 $75.000 $30.000 $5.000
DRILL SHAFT (18 IN)
LF 232.000 $150.000 $88.000 $70.000 $120.000 $120.000 $70.000 $76.920 $100.000
DRILL SHAFT (36 IN)
LF 464.000 $225.000 $135.000 $240.000 $230.000 $230.000 $225.000 $220.560 $210.000
CL C CONC (ABUT)
CY 57.200 $850.000 $1,327.000 $1,200.000 $975.000 $1,000.000 $1,300.000 $1,050.000 $1,100.000
REINF CONC SLAB
SF 3,780.000 $27.000 $30.000 $30.000 $27.000 $30.000 $23.000 $30.000 $32.000
APPROACH SLAB
CY 56.000 $800.000 $700.000 $800.000 $790.000 $1,100.000 $700.000 $800.000 $850.000
PRESTR CONC GIRDER (TX46)
LF 522.500 $270.000 $389.000 $300.000 $400.000 $290.000 $375.000 $342.120 $315.000
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $660.000 $550.000 $650.000 $600.000 $750.000 $750.000 $800.000 $750.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 1,500.000 $150.000 $150.000 $170.000 $150.000 $156.000 $189.000 $140.000 $185.000
RAIL (TY T223)
LF 274.000 $140.000 $180.000 $125.000 $120.000 $155.000 $150.000 $180.000 $175.000
ARMOR JOINT (SEALED)
LF 64.000 $100.000 $210.000 $150.000 $180.000 $120.000 $175.000 $200.000 $150.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 10.500 $1,100.000 $600.000 $2,000.000 $700.000 $2,230.000 $1,300.000 $1,000.000 $2,200.000
RC PIPE (CL III)(18 IN)
LF 54.000 $60.000 $50.000 $65.000 $110.000 $60.000 $60.000 $75.000 $100.000
RC PIPE (CL III)(30 IN)
LF 28.000 $115.000 $93.000 $125.000 $160.000 $126.000 $130.000 $120.000 $140.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000 $20,000.000 $18,000.000 $10,000.000 $10,500.000 $13,300.000 $10,500.000 $40,000.000 $35,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $1,000.000 $800.000 $1,000.000 $1,750.000 $1,190.000 $750.000 $1,000.000 $2,000.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $2,000.000 $2,500.000 $2,400.000 $3,000.000 $2,530.000 $4,000.000 $2,500.000 $5,000.000
REMOV STR (SET)
EA 4.000 $500.000 $500.000 $250.000 $100.000 $430.000 $500.000 $250.000 $50.000
REMOV STR (PIPE)
LF 60.000 $10.000 $50.000 $20.000 $20.000 $29.000 $10.000 $10.000 $10.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $30,000.000 $28,000.000 $10,000.000 $15,000.000 $30,000.000 $25,000.000 $50,000.000
MOBILIZATION
LS 1.000 $162,132.300 $170,000.000 $125,000.000 $110,000.000 $130,000.000 $180,000.000 $150,000.000 $185,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,500.000 $2,500.000 $3,500.000 $2,000.000 $3,125.000 $1,057.600 $2,658.450 $3,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $10,000.000 $5,000.000 $10,000.000 $10,000.000 $1,300.000 $6,500.000 $10,000.000 $9,000.000
TMA (STATIONARY)
DAY 8.000 $250.000 $1,000.000 $300.000 $350.000 $250.000 $530.000 $300.000 $300.000
TMA (MOBILE OPERATION)
HR 40.000 $100.000 $100.000 $100.000 $100.000 $100.000 $70.000 $300.000 $40.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $50.000 $45.000 $90.000 $50.000 $66.000 $80.000 $30.000 $1.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $15.000 $10.000 $20.000 $10.000 $20.000 $14.000 $1.000 $1.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $30.000 $1.000 $50.000 $45.000 $70.000 $50.000 $1.000 $1.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $10.000 $1.000 $12.000 $12.000 $20.000 $10.000 $1.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,846.000 $3.500 $4.000 $5.500 $5.000 $4.200 $3.000 $3.500 $1.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,846.000 $1.500 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.000
DRIVEWAYS (CONC)
SY 55.000 $100.000 $110.000 $135.000 $140.000 $185.000 $120.000 $100.000 $100.000
DRIVEWAYS (BASE)
SY 129.000 $35.000 $35.000 $35.000 $52.000 $23.500 $25.000 $40.000 $60.000
TURNOUTS (ACP)
SY 20.000 $100.000 $85.000 $100.000 $290.000 $31.000 $124.400 $133.730 $270.000
MTL W-BEAM GD FEN (STEEL POST)
LF 350.000 $28.000 $31.000 $31.000 $31.000 $36.000 $28.250 $30.370 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $2,550.000 $2,500.000 $2,200.000 $2,500.000 $2,125.000 $2,284.380 $2,200.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.000 $3.000 $2.500 $3.250 $2.200 $2.000 $2.150 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,200.000 $3,500.000 $3,500.000 $3,500.000 $3,520.000 $3,200.000 $3,440.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $250.000 $300.000 $220.000 $325.000 $220.000 $200.000 $215.000 $500.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $350.000 $400.000 $1,035.000 $300.000 $1,050.000 $1,000.000 $1,009.430 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $720.000 $700.000 $1,700.000 $700.000 $1,700.000 $1,200.000 $1,660.880 $1,200.000
REMOVE SM RD SN SUP&AM
EA 7.000 $100.000 $100.000 $125.000 $250.000 $150.000 $100.000 $145.130 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 2.000 $25.000 $25.000 $20.000 $27.000 $16.500 $15.000 $16.130 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $30.000 $25.000 $25.000 $35.000 $22.000 $20.000 $21.500 $20.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $45.000 $65.000 $125.000 $45.000 $120.000 $325.490 $48.380 $200.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 215.000 $0.500 $10.000 $11.000 $12.000 $11.000 $10.000 $20.030 $8.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 252.000 $0.500 $10.000 $11.000 $12.000 $1.100 $10.000 $7.530 $8.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 177.000 $1.000 $2.000 $3.000 $4.000 $2.650 $1.630 $7.530 $5.000
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
LF 3,430.000 $0.600 $2.500 $2.750 $3.000 $2.750 $2.500 $3.230 $3.000
TY I HIGH PERF PM (Y)6"(BRK)(090MIL)
LF 430.000 $0.500 $2.500 $2.750 $3.000 $2.750 $2.500 $3.230 $3.000
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
LF 1,008.000 $0.600 $2.500 $2.750 $3.000 $2.750 $2.500 $3.230 $3.000
PAVEMENT SLER 6"
LF 325.000 $0.500 $2.000 $2.200 $3.000 $2.200 $2.000 $2.150 $2.000
REFL PAV MRKR TY II-A-A
EA 35.000 $6.500 $7.000 $7.700 $8.000 $7.700 $7.000 $7.530 $10.000
PAV SURF PREP FOR MRK (6")
LF 325.000 $0.250 $5.000 $5.500 $6.000 $5.500 $5.000 $2.150 $2.000
REMOVE LEAD-CONTAINING COATING (OTHER)
LS 1.000 $20,000.000 $7,000.000 $10,000.000 $6,000.000 $7,360.000 $2,000.000 $7,000.000 $500.000
Totals: $1,783,455.250 $1,792,908.200 $1,808,473.560 $1,831,144.680 $1,858,833.650 $1,864,148.670 $1,913,034.030 $2,146,296.800
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $16,213.23
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $32,426.46
Total: $48,639.69