SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,060.000
|
$1.500
|
$4.000
|
$1.750
|
$3.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
1,859.000
|
$5.000
|
$29.000
|
$14.570
|
$12.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
42.000
|
$115.000
|
$975.000
|
$606.240
|
$300.000
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
100.000
|
$20.000
|
$142.000
|
$71.340
|
$50.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1/2" MICRO)
|
SY
|
1,859.000
|
$7.000
|
$25.000
|
$11.920
|
$50.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
2,128.000
|
$14.000
|
$15.600
|
$12.720
|
$32.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
199.000
|
$200.000
|
$201.000
|
$121.800
|
$140.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
28.400
|
$500.000
|
$1,063.000
|
$623.700
|
$600.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
1,008.000
|
$40.000
|
$25.000
|
$28.050
|
$32.000
|
|
|
RETROFIT RAIL (TY T552)
|
LF
|
517.000
|
$160.000
|
$207.000
|
$284.610
|
$175.000
|
|
|
GABION MATTRESSES (GALV)(6 IN)
|
SY
|
8.000
|
$100.000
|
$940.000
|
$138.390
|
$120.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$81,000.000
|
$92,000.000
|
$123,000.000
|
$120,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$9,000.000
|
$5,500.000
|
$5,996.250
|
$15,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
850.000
|
$4.000
|
$8.000
|
$2.460
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
850.000
|
$1.500
|
$2.250
|
$0.130
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
600.000
|
$5.000
|
$10.000
|
$4.920
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
600.000
|
$1.500
|
$2.250
|
$0.130
|
$1.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,580.000
|
$30.000
|
$8.000
|
$41.710
|
$20.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,580.000
|
$7.000
|
$15.000
|
$8.730
|
$10.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
2,580.000
|
$13.000
|
$8.000
|
$9.550
|
$2.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
325.000
|
$27.000
|
$33.350
|
$43.050
|
$35.220
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,000.000
|
$2,720.000
|
$2,706.000
|
$2,636.890
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,400.000
|
$1,491.000
|
$1,968.000
|
$1,575.050
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
2.000
|
$1,000.000
|
$1,000.000
|
$1,230.000
|
$1,055.940
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$3.000
|
$2.000
|
$3.690
|
$2.060
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$250.000
|
$230.000
|
$184.500
|
$241.860
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,000.000
|
$3,602.000
|
$3,321.000
|
$3,804.900
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$350.000
|
$225.000
|
$307.500
|
$235.970
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$2,000.000
|
$300.000
|
$1,230.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$1,000.000
|
$300.000
|
$738.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$8,000.000
|
$7,500.000
|
$7,995.000
|
$5,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
86.000
|
$20.000
|
$35.000
|
$49.200
|
$12.800
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
8.000
|
$25.000
|
$45.000
|
$36.900
|
$32.500
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
86.000
|
$20.000
|
$35.000
|
$36.900
|
$12.800
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
8.000
|
$25.000
|
$45.000
|
$30.750
|
$32.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,560.000
|
$0.600
|
$2.500
|
$1.870
|
$1.770
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,280.000
|
$0.600
|
$2.500
|
$2.340
|
$1.770
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
396.000
|
$1.000
|
$3.350
|
$9.330
|
$1.110
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,320.000
|
$0.500
|
$2.250
|
$3.740
|
$2.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,280.000
|
$0.500
|
$2.250
|
$2.580
|
$2.300
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,280.000
|
$0.500
|
$2.250
|
$2.580
|
$2.300
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
67.000
|
$3.000
|
$11.200
|
$1.230
|
$17.720
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,680.000
|
$0.600
|
$1.700
|
$1.620
|
$1.120
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
27.000
|
$170.000
|
$120.000
|
$182.230
|
$100.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
322.000
|
$50.000
|
$22.000
|
$41.600
|
$50.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
979.000
|
$60.000
|
$37.000
|
$47.940
|
$70.000
|
|
|
CONCRETE BEAM REPAIR
|
EA
|
58.000
|
$1,500.000
|
$930.000
|
$2,805.710
|
$2,000.000
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
28.000
|
$250.000
|
$600.000
|
$333.860
|
$150.000
|
|
|
TACK COAT
|
GAL
|
15.000
|
$10.000
|
$30.000
|
$229.610
|
$21.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
6.000
|
$8,000.000
|
$5,250.000
|
$3,378.410
|
$15,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$8,000.000
|
$4,360.000
|
$9,840.000
|
$100.000
|
|
|
TMA (STATIONARY)
|
DAY
|
107.000
|
$180.000
|
$250.000
|
$123.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$175.000
|
$450.000
|
$307.500
|
$900.000
|
|
Totals: |
$889,939.000
|
$983,847.250
|
$1,134,549.300
|
$1,169,531.520
|