|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
61,790.000
|
$8.000
|
$5.250
|
$14.000
|
$6.000
|
|
|
BACKFILL (TY B)
|
STA
|
680.000
|
$325.000
|
$150.000
|
$298.000
|
$135.000
|
|
|
BLADING
|
HR
|
70.000
|
$175.000
|
$275.810
|
$250.000
|
$150.000
|
|
|
PROOF ROLLING
|
HR
|
70.000
|
$150.000
|
$206.560
|
$150.000
|
$72.000
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
61,790.000
|
$1.500
|
$1.480
|
$2.500
|
$1.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
12,359.000
|
$4.950
|
$5.640
|
$8.000
|
$6.500
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
147,513.000
|
$4.900
|
$4.400
|
$4.600
|
$5.050
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
3,360.000
|
$199.000
|
$142.000
|
$140.000
|
$150.000
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
368,770.000
|
$5.700
|
$2.120
|
$5.500
|
$1.500
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
48,262.000
|
$5.700
|
$1.890
|
$5.250
|
$1.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
146.000
|
$735.000
|
$780.910
|
$880.000
|
$650.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,169,367.520
|
$1,961,152.310
|
$2,620,000.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$12,000.000
|
$25,000.000
|
$100,000.000
|
$25,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
2,480.000
|
$10.000
|
$10.720
|
$12.000
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,480.000
|
$1.150
|
$3.410
|
$2.300
|
$3.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
152,376.000
|
$0.200
|
$0.220
|
$0.250
|
$0.160
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
3,300.000
|
$40.000
|
$36.260
|
$39.000
|
$36.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$3,135.000
|
$3,067.860
|
$3,285.000
|
$3,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
7.000
|
$2,250.000
|
$1,896.490
|
$2,030.000
|
$1,500.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$3,200.000
|
$1,338.700
|
$1,435.000
|
$1,450.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,300.000
|
$3.900
|
$3.350
|
$4.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$315.000
|
$334.680
|
$415.000
|
$400.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$3,780.000
|
$3,653.540
|
$3,910.000
|
$3,200.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
7.000
|
$450.000
|
$334.680
|
$415.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
58.000
|
$900.000
|
$1,098.850
|
$1,000.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$1,115.580
|
$1,020.000
|
$855.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,300.000
|
$1,729.160
|
$1,745.000
|
$1,455.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
63.000
|
$175.000
|
$111.560
|
$205.000
|
$155.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(T)
|
EA
|
3.000
|
$1,350.000
|
$2,342.730
|
$1,720.000
|
$1,450.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
10,245.000
|
$10.000
|
$8.920
|
$9.400
|
$7.850
|
|
|
REMOVE LRSA
|
EA
|
19.000
|
$1,500.000
|
$1,394.480
|
$1,000.000
|
$750.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
32.000
|
$85.000
|
$20.640
|
$22.000
|
$45.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
18.000
|
$45.000
|
$20.640
|
$22.000
|
$45.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
150.000
|
$35.000
|
$11.160
|
$34.000
|
$55.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
80.000
|
$100.000
|
$167.340
|
$90.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
85.000
|
$147.000
|
$167.340
|
$91.000
|
$76.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
40.000
|
$83.000
|
$167.340
|
$92.000
|
$77.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
19,060.000
|
$1.000
|
$0.550
|
$0.800
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
76,188.000
|
$0.750
|
$0.500
|
$0.750
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
76,188.000
|
$0.800
|
$0.500
|
$0.750
|
$0.700
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
11,432.000
|
$1.750
|
$2.230
|
$2.000
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,500.000
|
$1.150
|
$1.280
|
$1.200
|
$0.950
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
19,060.000
|
$0.800
|
$0.950
|
$0.900
|
$0.800
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
91,899.000
|
$0.800
|
$0.840
|
$0.750
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
91,899.000
|
$0.750
|
$0.840
|
$0.750
|
$0.800
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,039.000
|
$5.000
|
$5.580
|
$5.000
|
$4.250
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
33,827.000
|
$125.000
|
$95.000
|
$150.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
14,108.000
|
$4.500
|
$3.890
|
$5.550
|
$7.000
|
|
|
STONE-MTRX-ASPH SMA-D PG76-22
|
TON
|
60,855.000
|
$185.000
|
$148.910
|
$155.000
|
$215.000
|
|
|
BONDING COURSE
|
GAL
|
15,722.000
|
$5.500
|
$4.100
|
$14.000
|
$7.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$19,250.000
|
$24,061.620
|
$20,000.000
|
$15,000.000
|
|
|
AUTO PORT SMRT TRF MONITOR SYS (PLAN 1)
|
DAY
|
283.000
|
$770.000
|
$500.000
|
$100.000
|
$350.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$10,450.000
|
$8,701.560
|
$30,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
283.000
|
$200.000
|
$500.000
|
$158.000
|
$315.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
283.000
|
$500.000
|
$850.000
|
$465.000
|
$520.000
|
|
Totals: |
$24,055,038.720
|
$18,857,193.760
|
$25,040,546.200
|
$25,684,842.310
|