|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
72,476.000
|
$5.000
|
$2.550
|
$1.650
|
$2.250
|
$4.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
167.640
|
$2,000.000
|
$1,485.000
|
$4,250.000
|
$1,450.000
|
$1,720.000
|
$450.000
|
|
|
BACKFILL (TY B)
|
STA
|
167.640
|
$455.000
|
$383.000
|
$175.000
|
$200.000
|
$520.000
|
$450.000
|
|
|
BLADING
|
HR
|
40.000
|
$300.000
|
$450.000
|
$700.000
|
$145.000
|
$300.000
|
$150.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
$137.000
|
$175.000
|
$300.000
|
$70.000
|
$225.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(10")
|
SY
|
36,862.000
|
$22.000
|
$30.000
|
$17.500
|
$32.000
|
$30.000
|
$36.000
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
72,476.000
|
$3.000
|
$3.000
|
$1.000
|
$0.900
|
$1.500
|
$6.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
21,124.000
|
$7.000
|
$5.200
|
$4.750
|
$6.500
|
$5.500
|
$6.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
80,274.000
|
$6.100
|
$4.690
|
$5.250
|
$5.250
|
$5.300
|
$6.000
|
|
|
AGGR(TY-PB GR-3 SAC-A)
|
CY
|
880.000
|
$350.000
|
$158.000
|
$130.000
|
$205.000
|
$170.000
|
$350.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
1,176.000
|
$250.000
|
$137.000
|
$140.000
|
$191.000
|
$150.000
|
$350.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
12.000
|
$775.000
|
$1,552.500
|
$4,000.000
|
$1,500.000
|
$1,700.000
|
$2,000.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
13.000
|
$850.000
|
$1,725.000
|
$4,500.000
|
$1,500.000
|
$1,800.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
90.000
|
$80.000
|
$132.250
|
$200.000
|
$140.000
|
$150.000
|
$100.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
50.000
|
$115.000
|
$189.750
|
$235.000
|
$160.000
|
$210.000
|
$150.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
134.000
|
$100.000
|
$138.000
|
$225.000
|
$150.000
|
$150.000
|
$120.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
1.000
|
$9,500.000
|
$10,350.000
|
$20,000.000
|
$12,500.000
|
$11,000.000
|
$12,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
1.000
|
$10,500.000
|
$16,100.000
|
$30,000.000
|
$14,000.000
|
$17,000.000
|
$14,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1) (C)
|
EA
|
2.000
|
$12,500.000
|
$12,075.000
|
$25,000.000
|
$14,000.000
|
$13,000.000
|
$20,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,500.000
|
$2,300.000
|
$4,000.000
|
$1,800.000
|
$2,500.000
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,000.000
|
$2,875.000
|
$4,000.000
|
$2,200.000
|
$3,000.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$1,000.000
|
$862.500
|
$955.000
|
$1,050.000
|
$900.000
|
$500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
250.000
|
$60.000
|
$23.000
|
$50.000
|
$38.000
|
$25.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$702,888.440
|
$700,000.000
|
$850,500.000
|
$755,000.000
|
$660,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$25,000.000
|
$40,000.000
|
$75,000.000
|
$20,000.000
|
$25,000.000
|
$8,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
400.000
|
$11.000
|
$25.000
|
$25.000
|
$13.000
|
$13.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
400.000
|
$2.000
|
$10.000
|
$5.000
|
$3.250
|
$5.000
|
$9.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,543.000
|
$100.000
|
$117.000
|
$250.000
|
$115.000
|
$160.000
|
$65.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,603.000
|
$100.000
|
$115.000
|
$175.000
|
$110.000
|
$130.000
|
$50.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
319.000
|
$220.000
|
$161.000
|
$330.000
|
$130.000
|
$200.000
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,100.000
|
$100.000
|
$115.000
|
$165.000
|
$155.000
|
$135.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
41.000
|
$1,025.000
|
$914.250
|
$950.000
|
$800.000
|
$1,100.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$1,200.000
|
$1,066.050
|
$1,100.000
|
$930.000
|
$1,255.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,700.000
|
$1,764.100
|
$1,800.000
|
$1,550.000
|
$2,135.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,500.000
|
$1,358.150
|
$1,400.000
|
$1,200.000
|
$1,515.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$2,280.000
|
$2,653.050
|
$2,700.000
|
$2,400.000
|
$2,980.000
|
$1,150.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
35.000
|
$150.000
|
$125.000
|
$150.000
|
$170.000
|
$125.000
|
$50.000
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$5,000.000
|
$4,756.400
|
$10,000.000
|
$4,500.000
|
$6,900.000
|
$5,000.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
4.000
|
$130.000
|
$97.750
|
$100.000
|
$85.000
|
$175.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
36,644.000
|
$0.500
|
$0.400
|
$0.750
|
$0.350
|
$0.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,140.000
|
$2.100
|
$3.000
|
$1.500
|
$2.450
|
$1.250
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,785.000
|
$1.000
|
$1.730
|
$1.550
|
$1.000
|
$1.870
|
$6.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
531.000
|
$5.250
|
$4.600
|
$4.050
|
$9.000
|
$4.980
|
$6.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
500.000
|
$1.000
|
$1.730
|
$1.550
|
$1.000
|
$1.870
|
$6.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,451.000
|
$1.000
|
$0.770
|
$0.700
|
$0.850
|
$0.830
|
$6.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
31,876.000
|
$1.000
|
$0.770
|
$0.700
|
$0.800
|
$0.830
|
$2.000
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
34,335.000
|
$1.000
|
$1.210
|
$1.100
|
$1.100
|
$1.310
|
$2.000
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
180.000
|
$18.000
|
$18.400
|
$17.000
|
$18.000
|
$20.000
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
42.000
|
$250.000
|
$287.500
|
$275.000
|
$300.000
|
$311.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$325.000
|
$431.250
|
$400.000
|
$400.000
|
$467.000
|
$250.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
90.000
|
$5.000
|
$6.330
|
$5.600
|
$10.000
|
$6.850
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
954.000
|
$5.000
|
$4.310
|
$3.800
|
$5.000
|
$4.650
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,055.000
|
$1.000
|
$1.730
|
$2.250
|
$1.200
|
$1.900
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
3,116.000
|
$1.000
|
$1.730
|
$2.250
|
$1.300
|
$1.900
|
$2.000
|
|
|
STONE-MTRX-ASPH SMAR-F SAC-A
|
TON
|
11,622.000
|
$225.000
|
$178.000
|
$160.000
|
$255.000
|
$246.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$21,000.000
|
$24,000.000
|
$35,000.000
|
$15,000.000
|
$15,000.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$240.000
|
$150.000
|
$750.000
|
$185.000
|
$250.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$100.000
|
$102.000
|
$350.000
|
$80.000
|
$75.000
|
$55.000
|
|
Totals: |
$7,731,772.790
|
$6,972,496.490
|
$7,856,142.550
|
$7,859,576.750
|
$7,931,658.890
|
$9,748,155.000
|