|
|
REMOVING CONC (PAV)
|
SY
|
88.000
|
$20.000
|
$32.000
|
$40.000
|
$40.000
|
$20.100
|
$87.000
|
$30.000
|
$41.900
|
$50.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
SY
|
1.000
|
$450.000
|
$800.000
|
$1,075.000
|
$320.000
|
$729.250
|
$4,000.000
|
$250.000
|
$482.250
|
$1,600.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
33,751.000
|
$11.000
|
$15.000
|
$11.300
|
$10.000
|
$4.930
|
$7.000
|
$10.000
|
$14.100
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
44,429.000
|
$17.000
|
$14.000
|
$14.850
|
$10.000
|
$12.370
|
$12.000
|
$8.500
|
$11.400
|
$15.000
|
|
|
BLADING
|
HR
|
20.000
|
$385.000
|
$105.000
|
$425.000
|
$240.000
|
$203.910
|
$250.000
|
$200.000
|
$404.900
|
$110.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$385.000
|
$74.000
|
$140.000
|
$110.000
|
$111.890
|
$250.000
|
$80.000
|
$75.650
|
$200.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 4)(9")
|
SY
|
112,356.000
|
$12.000
|
$16.150
|
$11.720
|
$15.000
|
$13.960
|
$21.000
|
$14.000
|
$12.900
|
$20.000
|
|
|
FL BS (RDWY DEL)(TY A GR 4)(FNL POS)
|
CY
|
1,285.000
|
$60.000
|
$40.000
|
$38.500
|
$50.000
|
$46.790
|
$75.000
|
$75.000
|
$46.450
|
$50.000
|
|
|
REWORK BS MATL (TY C)(9")(ORD COMP)
|
SY
|
280,168.000
|
$2.100
|
$3.250
|
$2.200
|
$3.000
|
$2.360
|
$2.000
|
$2.500
|
$1.650
|
$4.500
|
|
|
EMULS ASPH (PRIME)(AE-P)
|
GAL
|
67,281.000
|
$8.000
|
$4.000
|
$3.070
|
$2.800
|
$2.990
|
$3.000
|
$3.000
|
$3.300
|
$4.000
|
|
|
ASPH (RC-250)
|
GAL
|
18,920.000
|
$6.000
|
$4.500
|
$3.790
|
$2.650
|
$3.720
|
$4.000
|
$3.750
|
$4.050
|
$4.000
|
|
|
AGGR(TY-B GR-5 SAC-A)
|
CY
|
701.000
|
$115.000
|
$90.000
|
$75.500
|
$135.000
|
$101.600
|
$110.000
|
$125.000
|
$118.550
|
$70.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
83,046.000
|
$90.000
|
$58.000
|
$71.710
|
$84.000
|
$90.170
|
$87.000
|
$100.000
|
$111.150
|
$105.000
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
1,326.000
|
$650.000
|
$518.000
|
$542.000
|
$500.000
|
$638.050
|
$650.000
|
$550.000
|
$595.000
|
$110.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
16,680.000
|
$90.000
|
$50.000
|
$49.000
|
$60.000
|
$70.750
|
$60.000
|
$77.000
|
$65.100
|
$110.000
|
|
|
CEM STABIL BKFL
|
CY
|
57.000
|
$250.000
|
$185.000
|
$497.700
|
$220.000
|
$228.550
|
$350.000
|
$330.000
|
$231.000
|
$500.000
|
|
|
CONC STR REPAIR (EPOXY MORTAR)
|
SF
|
15.000
|
$100.000
|
$198.000
|
$338.100
|
$300.000
|
$217.660
|
$450.000
|
$308.000
|
$354.200
|
$325.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
40.000
|
$280.000
|
$204.000
|
$347.550
|
$210.000
|
$272.080
|
$250.000
|
$215.000
|
$364.100
|
$340.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
130.000
|
$250.000
|
$170.000
|
$150.150
|
$190.000
|
$272.080
|
$260.000
|
$193.000
|
$147.290
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
52.000
|
$500.000
|
$466.000
|
$521.850
|
$700.000
|
$544.160
|
$750.000
|
$715.000
|
$669.500
|
$500.000
|
|
|
RIPRAP (STONE TY F)(DRY)(18")
|
CY
|
98.000
|
$100.000
|
$250.000
|
$95.290
|
$125.000
|
$203.290
|
$165.000
|
$320.000
|
$342.150
|
$60.000
|
|
|
GABIONS (PVC)( 3FT X 3 FT)
|
CY
|
128.000
|
$550.000
|
$400.000
|
$415.540
|
$125.000
|
$265.850
|
$500.000
|
$300.000
|
$253.750
|
$500.000
|
|
|
GABIONS (3FT X 1.5FT)(PVC)
|
CY
|
11.000
|
$450.000
|
$838.000
|
$415.540
|
$250.000
|
$888.400
|
$400.000
|
$300.000
|
$989.600
|
$500.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
78.000
|
$525.000
|
$900.000
|
$960.750
|
$750.000
|
$446.210
|
$1,000.000
|
$590.000
|
$451.000
|
$920.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
46.000
|
$568.000
|
$800.000
|
$903.000
|
$900.000
|
$516.950
|
$800.000
|
$720.000
|
$522.500
|
$900.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
24.000
|
$900.000
|
$1,200.000
|
$1,454.250
|
$1,060.000
|
$652.990
|
$1,200.000
|
$836.000
|
$660.000
|
$1,400.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
63.000
|
$1,250.000
|
$1,000.000
|
$1,472.100
|
$1,010.000
|
$652.990
|
$1,300.000
|
$770.000
|
$660.000
|
$1,450.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
31.000
|
$1,275.000
|
$600.000
|
$2,341.500
|
$1,060.000
|
$718.290
|
$1,500.000
|
$940.000
|
$726.000
|
$2,250.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
228.000
|
$2,520.000
|
$700.000
|
$1,338.750
|
$760.000
|
$935.950
|
$1,000.000
|
$649.000
|
$946.000
|
$1,350.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
78.000
|
$3,520.000
|
$1,200.000
|
$2,243.850
|
$1,080.000
|
$1,088.320
|
$2,000.000
|
$870.000
|
$1,100.000
|
$2,200.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$18,000.000
|
$35,000.000
|
$26,596.500
|
$32,650.000
|
$32,649.520
|
$35,000.000
|
$29,260.000
|
$33,000.000
|
$26,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$34,000.000
|
$50,000.000
|
$40,719.000
|
$60,700.000
|
$54,415.860
|
$50,000.000
|
$55,900.000
|
$55,000.000
|
$40,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C)
|
EA
|
18.000
|
$6,350.000
|
$5,500.000
|
$5,197.500
|
$4,370.000
|
$3,841.760
|
$3,500.000
|
$3,725.000
|
$3,883.000
|
$5,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
2.000
|
$7,000.000
|
$6,000.000
|
$5,691.000
|
$10,360.000
|
$4,162.820
|
$4,500.000
|
$11,590.000
|
$4,207.500
|
$5,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C)
|
EA
|
2.000
|
$8,300.000
|
$4,500.000
|
$8,410.500
|
$12,550.000
|
$6,045.600
|
$5,500.000
|
$13,650.000
|
$6,110.500
|
$8,100.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
6.000
|
$8,700.000
|
$7,000.000
|
$11,676.000
|
$7,360.000
|
$7,400.560
|
$6,000.000
|
$6,800.000
|
$7,480.000
|
$11,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(6:1) (C)
|
EA
|
24.000
|
$23,826.000
|
$7,200.000
|
$7,518.000
|
$4,830.000
|
$7,460.420
|
$6,500.000
|
$3,650.000
|
$7,540.500
|
$7,200.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$6,500.000
|
$7,150.500
|
$14,300.000
|
$5,408.940
|
$5,000.000
|
$15,300.000
|
$5,467.000
|
$7,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
10.000
|
$9,500.000
|
$9,000.000
|
$10,552.500
|
$7,140.000
|
$7,705.290
|
$5,500.000
|
$6,350.000
|
$7,788.000
|
$11,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
8.000
|
$15,770.000
|
$7,300.000
|
$8,662.500
|
$8,770.000
|
$7,773.310
|
$6,000.000
|
$7,700.000
|
$7,856.750
|
$9,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(6:1) (C)
|
EA
|
8.000
|
$15,770.000
|
$14,000.000
|
$12,579.000
|
$10,250.000
|
$11,405.570
|
$8,500.000
|
$9,000.000
|
$11,528.000
|
$12,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
4.000
|
$12,000.000
|
$8,000.000
|
$10,321.500
|
$10,880.000
|
$7,748.820
|
$7,500.000
|
$10,600.000
|
$7,832.000
|
$10,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
3.000
|
$18,000.000
|
$15,000.000
|
$14,857.500
|
$11,780.000
|
$11,421.890
|
$10,000.000
|
$11,225.000
|
$11,544.500
|
$14,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(4:1) (C)
|
EA
|
12.000
|
$15,000.000
|
$12,000.000
|
$41,622.000
|
$9,450.000
|
$10,502.260
|
$10,500.000
|
$7,500.000
|
$10,615.000
|
$40,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 9 FT)(4:1) (C)
|
EA
|
9.000
|
$20,000.000
|
$18,000.000
|
$20,349.000
|
$14,400.000
|
$11,626.850
|
$14,000.000
|
$11,425.000
|
$11,751.300
|
$20,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
26.000
|
$4,554.000
|
$2,400.000
|
$525.000
|
$2,250.000
|
$2,720.790
|
$4,000.000
|
$1,500.000
|
$1,098.000
|
$500.000
|
|
|
REMOV STR (SET)
|
EA
|
42.000
|
$2,000.000
|
$2,000.000
|
$934.500
|
$1,100.000
|
$544.160
|
$600.000
|
$1,125.000
|
$550.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
11.000
|
$2,000.000
|
$9,000.000
|
$1,260.000
|
$2,040.000
|
$544.160
|
$1,300.000
|
$2,080.000
|
$550.000
|
$1,200.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
111.000
|
$300.000
|
$90.000
|
$336.000
|
$320.000
|
$70.740
|
$75.000
|
$315.000
|
$71.500
|
$320.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,161,225.810
|
$1,448,178.380
|
$770,000.000
|
$1,400,500.000
|
$1,151,894.330
|
$1,747,110.000
|
$1,700,000.000
|
$1,528,327.910
|
$2,100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$10,000.000
|
$13,478.580
|
$35,000.000
|
$25,000.000
|
$12,310.000
|
$25,000.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$160.000
|
$56.000
|
$150.000
|
$110.000
|
$173.520
|
$155.420
|
$100.000
|
$89.750
|
$100.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
8,930.000
|
$10.000
|
$4.000
|
$10.000
|
$7.200
|
$2.640
|
$8.390
|
$10.000
|
$4.500
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
8,930.000
|
$2.000
|
$0.600
|
$3.000
|
$3.200
|
$2.880
|
$2.000
|
$2.000
|
$0.450
|
$1.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
1,302.000
|
$68.000
|
$50.000
|
$68.250
|
$100.000
|
$70.740
|
$87.740
|
$71.500
|
$20.500
|
$65.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
4,200.000
|
$29.000
|
$5.000
|
$21.000
|
$10.000
|
$21.770
|
$18.210
|
$22.000
|
$16.230
|
$20.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
1,302.000
|
$29.000
|
$6.000
|
$21.000
|
$10.000
|
$21.770
|
$29.800
|
$22.000
|
$20.800
|
$20.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
106,128.000
|
$0.150
|
$0.130
|
$0.130
|
$0.100
|
$0.130
|
$0.110
|
$0.070
|
$0.200
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
53,064.000
|
$0.180
|
$0.250
|
$0.180
|
$0.100
|
$0.200
|
$0.210
|
$0.070
|
$0.210
|
$0.300
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,450.000
|
$28.000
|
$26.000
|
$26.250
|
$21.000
|
$27.210
|
$28.620
|
$27.500
|
$25.750
|
$25.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,250.000
|
$1,600.000
|
$1,575.000
|
$900.000
|
$1,632.480
|
$1,717.200
|
$1,650.000
|
$1,545.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,810.000
|
$4.000
|
$4.250
|
$4.200
|
$1.000
|
$4.350
|
$4.580
|
$4.500
|
$4.120
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,700.000
|
$2,800.000
|
$2,887.500
|
$2,000.000
|
$2,992.870
|
$3,148.200
|
$3,025.000
|
$2,832.500
|
$2,750.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
6.000
|
$22.000
|
$18,000.000
|
$16,800.000
|
$17,500.000
|
$17,413.080
|
$14,849.260
|
$17,600.000
|
$14,980.000
|
$16,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
20.000
|
$3,200.000
|
$2,400.000
|
$3,150.000
|
$1,500.000
|
$3,264.950
|
$1,577.630
|
$3,300.000
|
$2,752.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$16,000.000
|
$2,600.000
|
$1,050.000
|
$1,000.000
|
$1,088.320
|
$1,165.430
|
$1,100.000
|
$785.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
42.000
|
$700.000
|
$700.000
|
$855.750
|
$400.000
|
$886.980
|
$933.010
|
$896.500
|
$654.050
|
$350.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$850.000
|
$900.000
|
$1,092.000
|
$600.000
|
$1,131.850
|
$1,190.590
|
$1,144.000
|
$896.100
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,164.000
|
$900.000
|
$1,076.250
|
$700.000
|
$1,115.530
|
$1,173.420
|
$1,127.500
|
$885.800
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,270.000
|
$1,000.000
|
$1,134.000
|
$1,000.000
|
$1,175.390
|
$1,236.380
|
$1,188.000
|
$937.300
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
23.000
|
$160.000
|
$90.000
|
$125.000
|
$50.000
|
$143.110
|
$150.540
|
$144.650
|
$71.150
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
46.000
|
$95.000
|
$93.000
|
$21.000
|
$50.000
|
$21.770
|
$22.900
|
$22.000
|
$20.600
|
$65.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
63.000
|
$30.000
|
$28.000
|
$142.800
|
$190.000
|
$148.010
|
$155.690
|
$149.600
|
$140.080
|
$15.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
58.000
|
$125.000
|
$93.000
|
$42.000
|
$52.000
|
$43.530
|
$45.790
|
$44.000
|
$41.200
|
$65.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
58.000
|
$20.000
|
$22.000
|
$25.000
|
$8.000
|
$16.320
|
$17.170
|
$16.500
|
$15.450
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
23.000
|
$30.000
|
$34.000
|
$42.000
|
$19.000
|
$43.530
|
$45.790
|
$44.000
|
$41.200
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
219,394.000
|
$1.000
|
$0.160
|
$0.140
|
$0.150
|
$0.140
|
$0.150
|
$0.330
|
$0.090
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
215,794.000
|
$1.000
|
$0.160
|
$0.140
|
$0.150
|
$0.140
|
$0.150
|
$0.330
|
$0.090
|
$0.130
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
10,970.000
|
$3.500
|
$2.300
|
$1.500
|
$1.050
|
$1.930
|
$2.290
|
$3.000
|
$1.550
|
$1.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
6,212.000
|
$1.000
|
$2.300
|
$1.500
|
$1.550
|
$1.980
|
$2.290
|
$3.000
|
$1.650
|
$1.250
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
276.000
|
$2.800
|
$2.600
|
$2.630
|
$9.200
|
$2.720
|
$2.860
|
$1.100
|
$1.030
|
$8.500
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,363.000
|
$0.450
|
$0.400
|
$0.370
|
$0.350
|
$0.380
|
$0.400
|
$0.390
|
$0.360
|
$0.310
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
127,252.000
|
$0.420
|
$0.300
|
$0.280
|
$0.350
|
$0.300
|
$0.320
|
$0.390
|
$0.360
|
$0.310
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
8,039.000
|
$0.370
|
$0.310
|
$0.320
|
$0.350
|
$0.330
|
$0.340
|
$0.390
|
$0.360
|
$0.310
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
57,645.000
|
$0.440
|
$0.300
|
$0.290
|
$0.350
|
$0.300
|
$0.320
|
$0.390
|
$0.360
|
$0.310
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
48.000
|
$19.000
|
$0.130
|
$0.130
|
$25.000
|
$0.130
|
$0.140
|
$12.370
|
$11.590
|
$23.500
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
6.000
|
$33.000
|
$31.000
|
$31.500
|
$40.000
|
$32.650
|
$34.340
|
$30.300
|
$28.380
|
$38.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
238.000
|
$3.400
|
$4.000
|
$3.410
|
$3.250
|
$3.540
|
$3.720
|
$2.900
|
$2.730
|
$3.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,316.000
|
$3.400
|
$3.000
|
$2.780
|
$3.250
|
$2.880
|
$3.030
|
$2.900
|
$2.730
|
$3.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
72.000
|
$3.250
|
$7.500
|
$7.350
|
$3.250
|
$7.620
|
$8.010
|
$2.900
|
$2.730
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
60,249.000
|
$2.000
|
$0.600
|
$0.580
|
$0.500
|
$0.600
|
$0.630
|
$0.350
|
$0.330
|
$0.710
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$15,000.000
|
$25,000.000
|
$5,250.000
|
$20,000.000
|
$18,520.560
|
$20,447.560
|
$18,000.000
|
$13,060.000
|
$12,500.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$12,000.000
|
$8,000.000
|
$5,250.000
|
$10,000.000
|
$15,047.960
|
$17,845.140
|
$8,500.000
|
$9,050.000
|
$12,000.000
|
|
Totals: |
$20,630,254.150
|
$15,005,109.230
|
$15,229,979.260
|
$16,450,414.150
|
$16,784,780.090
|
$18,409,127.770
|
$18,471,648.050
|
$18,508,038.480
|
$21,728,406.220
|