|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
4,224.000
|
$5.750
|
$4.900
|
$7.000
|
$6.250
|
$5.810
|
$6.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
39,956.000
|
$7.000
|
$11.600
|
$8.000
|
$9.840
|
$6.910
|
$9.500
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY D)
|
CY
|
23,494.000
|
$16.000
|
$9.200
|
$8.000
|
$1.750
|
$5.660
|
$12.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(10")
|
SY
|
73,565.000
|
$9.500
|
$12.000
|
$13.000
|
$15.000
|
$17.040
|
$15.000
|
|
|
FL BS (RDWY DEL)(TY A GR 4)(FNL POS)
|
CY
|
21,310.000
|
$40.000
|
$28.000
|
$43.000
|
$52.000
|
$58.390
|
$55.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
2,631.000
|
$2.200
|
$3.700
|
$2.800
|
$3.000
|
$3.200
|
$7.500
|
|
|
ASPH (AC-20XP)
|
GAL
|
180.000
|
$4.000
|
$37.500
|
$2.900
|
$19.400
|
$3.300
|
$20.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
62,706.000
|
$3.000
|
$2.750
|
$2.950
|
$3.000
|
$3.800
|
$2.900
|
|
|
ASPH (RC-250)
|
GAL
|
36,887.000
|
$3.000
|
$3.100
|
$3.450
|
$3.000
|
$4.400
|
$3.250
|
|
|
AGGR(TY-PB GR-5 SAC-A)
|
CY
|
14.000
|
$75.000
|
$1,225.000
|
$90.000
|
$150.000
|
$96.160
|
$350.000
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
738.000
|
$125.000
|
$37.270
|
$85.000
|
$48.000
|
$69.410
|
$87.000
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
738.000
|
$125.000
|
$26.830
|
$80.000
|
$47.000
|
$59.470
|
$87.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
738.000
|
$128.000
|
$53.840
|
$110.000
|
$89.000
|
$87.630
|
$153.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
642.000
|
$140.000
|
$59.390
|
$115.000
|
$87.000
|
$93.230
|
$170.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
30,969.000
|
$70.000
|
$95.000
|
$90.000
|
$63.000
|
$93.340
|
$95.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
9,907.000
|
$70.000
|
$79.000
|
$70.000
|
$55.000
|
$72.420
|
$80.000
|
|
|
TOM (ASPHALT) PG 70-22
|
TON
|
782.000
|
$560.000
|
$537.600
|
$470.000
|
$550.000
|
$667.490
|
$675.000
|
|
|
CEM STABIL BKFL
|
CY
|
41.000
|
$175.000
|
$210.000
|
$380.000
|
$275.000
|
$320.100
|
$220.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
31.000
|
$500.000
|
$441.000
|
$1,350.000
|
$440.000
|
$783.200
|
$462.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
99.000
|
$690.000
|
$393.750
|
$800.000
|
$525.000
|
$734.800
|
$413.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
540.000
|
$620.000
|
$446.250
|
$610.000
|
$453.000
|
$763.400
|
$468.000
|
|
|
CONC BOX CULV (6 FT X 2 FT) (EXTEND)
|
LF
|
115.000
|
$739.000
|
$446.250
|
$700.000
|
$773.000
|
$970.200
|
$468.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$5,520.000
|
$2,310.000
|
$7,300.000
|
$7,500.000
|
$5,082.000
|
$2,420.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
8.000
|
$6,195.000
|
$2,100.000
|
$8,000.000
|
$9,900.000
|
$8,327.000
|
$2,200.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
32.000
|
$8,000.000
|
$2,520.000
|
$5,900.000
|
$5,900.000
|
$3,718.000
|
$2,640.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$825,000.000
|
$1,000,000.000
|
$1,200,305.890
|
$1,139,551.100
|
$1,300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$7,500.000
|
$4,550.000
|
$7,500.000
|
$10,000.000
|
$25,496.440
|
$45,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
222.000
|
$17.000
|
$24.000
|
$35.000
|
$29.000
|
$62.700
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$5.000
|
$10.000
|
$15.000
|
$8.000
|
$27.500
|
$8.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,580.000
|
$3.500
|
$12.000
|
$6.000
|
$4.000
|
$6.600
|
$3.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,580.000
|
$0.660
|
$5.000
|
$1.000
|
$0.600
|
$2.400
|
$1.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,008.000
|
$50.000
|
$50.000
|
$35.000
|
$50.000
|
$54.090
|
$35.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,037.000
|
$75.000
|
$84.000
|
$100.000
|
$75.000
|
$145.200
|
$88.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
329.000
|
$28.000
|
$78.000
|
$35.000
|
$52.000
|
$54.090
|
$35.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
49,829.000
|
$0.130
|
$0.150
|
$0.060
|
$0.150
|
$0.150
|
$0.070
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
29,086.000
|
$0.200
|
$0.210
|
$0.060
|
$0.200
|
$0.220
|
$0.070
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
300.000
|
$25.000
|
$27.300
|
$27.000
|
$30.000
|
$28.600
|
$29.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,900.000
|
$2,415.000
|
$2,400.000
|
$2,400.000
|
$2,530.000
|
$2,530.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$3.500
|
$5.250
|
$5.500
|
$5.000
|
$5.500
|
$5.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$3,150.000
|
$3,200.000
|
$3,100.000
|
$3,300.000
|
$3,300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$275.000
|
$315.000
|
$320.000
|
$310.000
|
$330.000
|
$330.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
51.000
|
$550.000
|
$892.500
|
$900.000
|
$900.000
|
$935.000
|
$935.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
20.000
|
$700.000
|
$682.500
|
$700.000
|
$700.000
|
$715.000
|
$715.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
52.000
|
$75.000
|
$55.000
|
$110.000
|
$130.000
|
$137.500
|
$112.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
55.000
|
$80.000
|
$141.750
|
$140.000
|
$140.000
|
$148.500
|
$148.500
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
24.000
|
$100.000
|
$152.250
|
$150.000
|
$150.000
|
$159.500
|
$159.500
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
24.000
|
$10.000
|
$10.000
|
$100.000
|
$11.000
|
$11.000
|
$200.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
354,804.000
|
$0.100
|
$0.130
|
$0.090
|
$0.130
|
$0.130
|
$0.070
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
313,656.000
|
$0.100
|
$0.130
|
$0.090
|
$0.130
|
$0.130
|
$0.070
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,600.000
|
$0.500
|
$0.740
|
$0.900
|
$0.750
|
$0.770
|
$0.100
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,175.000
|
$0.300
|
$0.370
|
$0.450
|
$0.400
|
$0.390
|
$0.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
61,752.000
|
$0.300
|
$0.370
|
$0.450
|
$0.400
|
$0.390
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,345.000
|
$0.300
|
$0.370
|
$0.450
|
$0.400
|
$0.390
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
52,386.000
|
$0.300
|
$0.370
|
$0.450
|
$0.400
|
$0.390
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
723.000
|
$3.500
|
$3.150
|
$3.350
|
$3.100
|
$3.300
|
$3.700
|
|
|
EMULSION
|
GAL
|
1,259,078.000
|
$1.900
|
$2.140
|
$2.000
|
$2.900
|
$2.230
|
$2.300
|
|
|
CEMENT
|
TON
|
350.000
|
$188.000
|
$195.000
|
$160.000
|
$230.000
|
$176.000
|
$250.000
|
|
|
EMUL TRTMNT(MX EXST MTRL & NEW BASE) 8"
|
SY
|
266,827.000
|
$1.600
|
$3.870
|
$3.400
|
$1.930
|
$2.100
|
$3.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$16,500.000
|
$15,000.000
|
$20,000.000
|
$15,400.000
|
$9,000.000
|
|
Totals: |
$11,505,346.770
|
$12,502,318.480
|
$12,843,711.900
|
$12,976,156.590
|
$14,224,047.100
|
$14,827,542.400
|