|
|
EXCAVATION (ROADWAY)
|
CY
|
11,107.000
|
$14.000
|
$7.000
|
$8.960
|
$8.000
|
$1.870
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
19,781.000
|
$15.000
|
$9.000
|
$17.710
|
$15.000
|
$12.040
|
|
|
BACKFILL (TY B)
|
STA
|
297.500
|
$340.000
|
$200.000
|
$200.000
|
$160.000
|
$282.590
|
|
|
BLADING
|
HR
|
60.000
|
$250.000
|
$150.000
|
$400.000
|
$155.000
|
$207.360
|
|
|
PROOF ROLLING
|
HR
|
149.000
|
$170.000
|
$80.000
|
$100.000
|
$73.000
|
$111.150
|
|
|
FL BS (RDWY DEL)(TY A GR 4)(FNL POS)
|
CY
|
12,672.000
|
$55.000
|
$45.000
|
$25.500
|
$40.500
|
$35.370
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(10.5")
|
SY
|
149,300.000
|
$11.000
|
$11.500
|
$11.600
|
$14.500
|
$14.610
|
|
|
REWORK BS MTL (TY C)(7")(DENS CONT)
|
SY
|
119,101.000
|
$7.000
|
$2.250
|
$4.900
|
$2.900
|
$3.220
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
29,863.000
|
$2.000
|
$2.750
|
$2.130
|
$3.000
|
$2.140
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
59,717.000
|
$3.700
|
$3.400
|
$2.880
|
$2.900
|
$3.000
|
|
|
ASPH (RC-250)
|
GAL
|
22,394.000
|
$4.700
|
$3.400
|
$3.910
|
$3.500
|
$4.050
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
747.000
|
$80.000
|
$115.000
|
$83.400
|
$130.000
|
$137.730
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
1,248.000
|
$90.000
|
$144.000
|
$96.450
|
$140.000
|
$141.500
|
|
|
TOM (ASPHALT) PG 76-22
|
TON
|
619.000
|
$200.000
|
$750.000
|
$594.000
|
$605.000
|
$760.000
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
7,635.000
|
$70.000
|
$48.500
|
$81.000
|
$74.000
|
$109.000
|
|
|
CEM STABIL BKFL
|
CY
|
334.000
|
$250.000
|
$250.000
|
$183.750
|
$218.000
|
$252.810
|
|
|
TEMPORARY SPL SHORING
|
SF
|
512.000
|
$125.000
|
$15.000
|
$99.750
|
$14.000
|
$51.710
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
43.000
|
$700.000
|
$600.000
|
$1,102.500
|
$1,359.000
|
$632.030
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
564.000
|
$125.000
|
$40.000
|
$56.700
|
$43.000
|
$74.690
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
1,512.000
|
$150.000
|
$70.000
|
$63.000
|
$48.000
|
$91.930
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
12.000
|
$200.000
|
$100.000
|
$210.000
|
$186.000
|
$120.660
|
|
|
CMP AR (GAL STL DES 5)
|
LF
|
20.000
|
$225.000
|
$100.000
|
$210.000
|
$230.000
|
$178.120
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
300.000
|
$500.000
|
$725.000
|
$430.500
|
$475.000
|
$689.490
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(6:1) (C)
|
EA
|
10.000
|
$4,500.000
|
$8,150.000
|
$10,500.000
|
$7,200.000
|
$9,767.750
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
12.000
|
$2,700.000
|
$2,500.000
|
$2,520.000
|
$1,700.000
|
$1,493.890
|
|
|
SET (TY II) (DES 3) (CMP) (4: 1) (C)
|
EA
|
30.000
|
$2,300.000
|
$2,600.000
|
$2,835.000
|
$2,400.000
|
$1,608.810
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
34.000
|
$2,500.000
|
$2,600.000
|
$3,465.000
|
$2,400.000
|
$1,838.640
|
|
|
SET (TY II) (DES 4) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$4,000.000
|
$3,780.000
|
$3,300.000
|
$2,872.870
|
|
|
SET (TY II) (DES 5) (CMP) (4: 1) (C)
|
EA
|
12.000
|
$4,500.000
|
$6,000.000
|
$5,460.000
|
$3,400.000
|
$3,734.730
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$1,500.000
|
$1,000.000
|
$2,625.000
|
$2,000.000
|
$5,745.740
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
120.000
|
$200.000
|
$300.000
|
$411.600
|
$260.000
|
$74.690
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$640,000.000
|
$300,000.000
|
$410,000.000
|
$644,025.240
|
$885,619.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$7,500.000
|
$12,500.000
|
$12,000.000
|
$31,000.000
|
$44,246.540
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
126.000
|
$45.000
|
$30.000
|
$40.000
|
$67.000
|
$35.350
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
126.000
|
$12.000
|
$10.000
|
$10.000
|
$30.000
|
$10.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,120.000
|
$10.000
|
$10.000
|
$9.750
|
$4.500
|
$6.730
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,120.000
|
$1.000
|
$2.000
|
$2.000
|
$0.600
|
$2.790
|
|
|
CONSTRUCTING DETOURS
|
SY
|
562.000
|
$100.000
|
$30.000
|
$55.000
|
$47.000
|
$53.910
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
240.000
|
$70.000
|
$90.000
|
$57.840
|
$80.000
|
$91.930
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
240.000
|
$10.000
|
$20.000
|
$60.470
|
$5.000
|
$11.490
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
240.000
|
$25.000
|
$20.000
|
$41.500
|
$13.000
|
$11.490
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
150.000
|
$7.000
|
$4.000
|
$8.400
|
$6.000
|
$5.750
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$19,000.000
|
$12,000.000
|
$6,865.950
|
$35,000.000
|
$9,193.180
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,200.000
|
$2,300.000
|
$2,002.350
|
$2,300.000
|
$2,298.300
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$700.000
|
$787.500
|
$575.000
|
$2,298.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
28.000
|
$673.000
|
$630.000
|
$614.250
|
$900.000
|
$672.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$840.000
|
$795.000
|
$771.750
|
$1,000.000
|
$844.620
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,096.000
|
$810.000
|
$787.500
|
$1,050.000
|
$861.860
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
20.000
|
$125.000
|
$65.000
|
$125.000
|
$101.000
|
$79.630
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
30.000
|
$65.000
|
$97.000
|
$94.500
|
$130.000
|
$103.420
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
30.000
|
$40.000
|
$25.000
|
$80.000
|
$11.000
|
$42.470
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
29,774.000
|
$0.200
|
$0.140
|
$0.140
|
$0.130
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
29,774.000
|
$0.200
|
$0.140
|
$0.140
|
$0.130
|
$0.140
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
LF
|
104.000
|
$2.500
|
$7.500
|
$5.250
|
$8.000
|
$8.040
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
2,000.000
|
$1.000
|
$1.000
|
$0.740
|
$0.900
|
$0.980
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$0.500
|
$5.500
|
$16.800
|
$5.100
|
$5.750
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,000.000
|
$0.250
|
$1.000
|
$0.740
|
$0.900
|
$0.980
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,977.000
|
$2.250
|
$1.000
|
$1.500
|
$0.500
|
$1.940
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,849.000
|
$0.800
|
$0.600
|
$0.890
|
$0.600
|
$0.620
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
87.000
|
$15.000
|
$3.500
|
$14.700
|
$4.000
|
$3.790
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
58,844.000
|
$0.500
|
$0.880
|
$0.660
|
$0.800
|
$0.940
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
57,528.000
|
$0.500
|
$0.880
|
$0.660
|
$0.800
|
$0.940
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
2,075.000
|
$0.500
|
$0.880
|
$0.890
|
$0.900
|
$0.940
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
58,844.000
|
$0.300
|
$0.360
|
$0.280
|
$0.400
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,075.000
|
$0.300
|
$0.360
|
$0.410
|
$0.400
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
57,528.000
|
$0.300
|
$0.360
|
$0.280
|
$0.400
|
$0.380
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
112.000
|
$20.000
|
$19.500
|
$12.600
|
$19.000
|
$20.680
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$185.000
|
$325.000
|
$210.000
|
$325.000
|
$344.740
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$240.000
|
$435.000
|
$241.500
|
$425.000
|
$459.660
|
|
REFL PAV MRKR TY I-C
|
EA
|
244.000
|
$3.000
|
$3.250
|
$5.250
|
$3.100
|
$3.450
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,084.000
|
$3.000
|
$3.250
|
$2.310
|
$3.100
|
$3.450
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$24,000.000
|
$10,000.000
|
$14,100.000
|
$35,000.000
|
$12,595.020
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$17,000.270
|
$6,000.000
|
$17,850.000
|
$25,000.000
|
$22,529.980
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$9,300.000
|
$8,500.000
|
$5,250.000
|
$7,633.000
|
$9,972.020
|
|
Totals: |
$7,073,009.160
|
$5,983,269.300
|
$6,472,682.620
|
$7,150,385.680
|
$7,837,396.855
|