|
|
REMOVING CONC (RIPRAP)
|
CY
|
8.000
|
$200.000
|
$220.000
|
$1,000.000
|
$150.000
|
$500.000
|
$1,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
760.000
|
$8.000
|
$16.500
|
$25.000
|
$18.000
|
$10.000
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (1")
|
SY
|
149,734.000
|
$1.000
|
$0.850
|
$1.050
|
$0.650
|
$1.500
|
$1.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,879.000
|
$8.000
|
$6.500
|
$7.000
|
$16.000
|
$15.000
|
$10.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
30,805.000
|
$10.000
|
$6.500
|
$12.000
|
$16.000
|
$15.000
|
$15.000
|
|
|
BACKFILL (TY B)
|
STA
|
5.000
|
$150.000
|
$725.000
|
$250.000
|
$3,400.000
|
$1,000.000
|
$200.000
|
|
|
BLADING
|
HR
|
24.000
|
$250.000
|
$350.000
|
$260.000
|
$230.000
|
$150.000
|
$250.000
|
|
|
PROOF ROLLING
|
HR
|
16.000
|
$150.000
|
$125.000
|
$97.000
|
$130.000
|
$250.000
|
$200.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
101,009.000
|
$5.000
|
$9.420
|
$11.500
|
$10.000
|
$13.500
|
$11.000
|
|
|
EMULS ASPH (PRIME)(AE-P)
|
GAL
|
44,029.000
|
$2.000
|
$3.350
|
$3.750
|
$3.500
|
$3.250
|
$6.000
|
|
|
AGGR(TY-PB GR-3 SAC-A)
|
CY
|
3,083.000
|
$70.000
|
$55.000
|
$95.000
|
$110.000
|
$80.000
|
$110.000
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
2,272.000
|
$70.000
|
$65.000
|
$96.000
|
$120.000
|
$85.000
|
$120.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
163,852.000
|
$3.000
|
$2.930
|
$3.500
|
$3.400
|
$3.200
|
$3.000
|
|
|
SUPERPAVE MIXTURES SP-B PG70-22
|
TON
|
53,916.000
|
$50.000
|
$75.250
|
$68.000
|
$82.500
|
$90.000
|
$87.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
|
TON
|
27,025.000
|
$75.000
|
$85.500
|
$85.000
|
$89.000
|
$100.000
|
$103.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7")
|
SY
|
2,000.000
|
$45.000
|
$80.000
|
$62.000
|
$35.000
|
$60.000
|
$100.000
|
|
|
CEM STABIL BKFL
|
CY
|
88.000
|
$175.000
|
$192.500
|
$388.000
|
$200.000
|
$250.000
|
$250.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
516.000
|
$60.000
|
$77.000
|
$125.000
|
$80.000
|
$50.000
|
$55.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
207.000
|
$75.000
|
$88.000
|
$160.000
|
$90.000
|
$55.000
|
$60.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (C)
|
EA
|
22.000
|
$500.000
|
$1,705.000
|
$2,300.000
|
$1,650.000
|
$1,500.000
|
$2,500.000
|
|
|
SET (TY II) (DES 3) (CMP) (4: 1) (C)
|
EA
|
6.000
|
$2,700.000
|
$2,310.000
|
$1,500.000
|
$2,250.000
|
$1,500.000
|
$2,200.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (C)
|
EA
|
10.000
|
$2,700.000
|
$2,640.000
|
$1,600.000
|
$2,550.000
|
$1,500.000
|
$2,300.000
|
|
|
REMOV STR (SET)
|
EA
|
22.000
|
$1,800.000
|
$385.000
|
$1,000.000
|
$400.000
|
$500.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
11.000
|
$200.000
|
$385.000
|
$2,500.000
|
$400.000
|
$500.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$376,900.000
|
$700,000.000
|
$1,115,250.000
|
$1,180,000.000
|
$1,300,000.000
|
$1,575,274.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$11,000.000
|
$7,500.000
|
$5,000.000
|
$5,700.000
|
$20,000.000
|
$35,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
760.000
|
$8.000
|
$6.000
|
$8.000
|
$13.000
|
$5.000
|
$12.560
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
760.000
|
$3.000
|
$1.500
|
$1.000
|
$1.000
|
$2.000
|
$1.660
|
|
|
DRIVEWAYS (CONC)
|
SY
|
722.000
|
$100.000
|
$93.500
|
$70.000
|
$90.000
|
$100.000
|
$75.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,275.000
|
$25.000
|
$78.500
|
$73.000
|
$54.000
|
$50.000
|
$85.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
28.000
|
$10.000
|
$22.000
|
$53.000
|
$45.000
|
$20.000
|
$22.680
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$1,000.000
|
$2,035.000
|
$2,200.000
|
$1,100.000
|
$1,850.000
|
$2,097.900
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
16.000
|
$25.000
|
$44.000
|
$47.000
|
$43.000
|
$40.000
|
$35.580
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$560.000
|
$819.500
|
$840.000
|
$800.000
|
$400.000
|
$1,067.560
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$600.000
|
$933.900
|
$940.000
|
$900.000
|
$450.000
|
$1,196.960
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
10.000
|
$600.000
|
$951.500
|
$980.000
|
$915.000
|
$500.000
|
$1,237.070
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
1.000
|
$600.000
|
$1,006.500
|
$980.000
|
$980.000
|
$700.000
|
$1,237.070
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$950.000
|
$1,039.500
|
$1,100.000
|
$1,000.000
|
$800.000
|
$1,358.710
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$750.000
|
$1,375.000
|
$1,300.000
|
$1,320.000
|
$1,500.000
|
$1,617.510
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
31.000
|
$80.000
|
$75.000
|
$122.000
|
$120.000
|
$30.000
|
$155.280
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND(BI)
|
EA
|
56.000
|
$30.000
|
$93.500
|
$87.000
|
$90.000
|
$35.000
|
$109.990
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
34.000
|
$90.000
|
$93.500
|
$87.000
|
$90.000
|
$40.000
|
$109.990
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
34.000
|
$20.000
|
$30.000
|
$16.000
|
$125.000
|
$20.000
|
$19.410
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
179,200.000
|
$0.100
|
$0.150
|
$0.080
|
$0.080
|
$0.130
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
179,200.000
|
$0.100
|
$0.150
|
$0.080
|
$0.080
|
$0.130
|
$0.160
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
5,114.000
|
$1.000
|
$1.990
|
$2.100
|
$1.500
|
$1.000
|
$2.270
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
4,418.000
|
$1.000
|
$1.990
|
$2.200
|
$1.500
|
$1.000
|
$2.270
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
13,197.000
|
$0.500
|
$0.830
|
$0.550
|
$0.540
|
$0.780
|
$0.850
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
89,076.000
|
$0.250
|
$0.350
|
$0.260
|
$0.270
|
$0.390
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
9,360.000
|
$0.250
|
$0.390
|
$0.260
|
$0.270
|
$0.390
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
34,780.000
|
$0.300
|
$0.350
|
$0.260
|
$0.270
|
$0.390
|
$0.360
|
|
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
|
EA
|
14.000
|
$50.000
|
$60.500
|
$102.000
|
$105.000
|
$60.000
|
$62.370
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
11.000
|
$15.000
|
$15.400
|
$18.000
|
$18.000
|
$22.000
|
$15.880
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$200.000
|
$242.000
|
$189.000
|
$200.000
|
$300.000
|
$249.480
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
20.000
|
$250.000
|
$275.000
|
$249.000
|
$260.000
|
$400.000
|
$283.500
|
|
PREFAB PAV MRK TY C (W) (ISLAND)
|
EA
|
2.000
|
$680.000
|
$858.000
|
$3,400.000
|
$3,500.000
|
$62.000
|
$884.520
|
|
REFL PAV MRKR TY I-C
|
EA
|
613.000
|
$2.500
|
$3.030
|
$9.000
|
$2.750
|
$3.000
|
$3.120
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
885.000
|
$2.500
|
$3.030
|
$2.600
|
$2.750
|
$3.000
|
$3.120
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
200,000.000
|
$0.500
|
$0.440
|
$0.320
|
$0.400
|
$1.000
|
$0.570
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
2.000
|
$225.000
|
$385.000
|
$870.000
|
$750.000
|
$350.000
|
$396.900
|
|
|
BACK PLATE (12")(1 SEC)(VENTED)ALUM
|
EA
|
2.000
|
$75.000
|
$137.500
|
$153.000
|
$90.000
|
$125.000
|
$141.750
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
59.000
|
$1.500
|
$3.850
|
$16.000
|
$12.000
|
$3.500
|
$3.970
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
1.000
|
$9,275.000
|
$13,750.000
|
$16,000.000
|
$14,000.000
|
$12,500.000
|
$19,845.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
1.000
|
$400.000
|
$1,650.000
|
$2,600.000
|
$1,500.000
|
$1,500.000
|
$1,701.000
|
|
|
REMOVAL OF CABLES
|
LF
|
28.000
|
$2.000
|
$2.200
|
$13.000
|
$1.100
|
$2.000
|
$2.270
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,000.000
|
$20,000.000
|
$25,000.000
|
$20,000.000
|
$22,500.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$1,500.000
|
$5,500.000
|
$41,000.000
|
$40,000.000
|
$50,000.000
|
$20,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
240.000
|
$20.000
|
$27.500
|
$80.000
|
$105.000
|
$50.000
|
$107.730
|
|
Totals: |
$8,014,513.000
|
$10,632,822.070
|
$11,451,684.460
|
$12,366,323.400
|
$13,682,522.550
|
$14,096,783.250
|