|
|
|
REMOV CONC (RIPRAP)
|
SY
|
92.000
|
$50.000
|
$36.000
|
$65.000
|
$25.000
|
$175.000
|
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
130.000
|
$25.000
|
$52.000
|
$90.000
|
$20.000
|
$135.000
|
|
|
|
REMOV CONC (FLUME)
|
SY
|
962.000
|
$40.000
|
$52.000
|
$25.000
|
$15.000
|
$35.000
|
|
|
|
SUBGR WIDEN (OC)
|
STA
|
404.600
|
$475.000
|
$700.000
|
$885.000
|
$900.000
|
$1,300.000
|
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
9,000.000
|
$15.000
|
$25.000
|
$29.000
|
$17.350
|
$12.000
|
|
|
|
BACKFILL (TY B)
|
STA
|
404.600
|
$150.000
|
$700.000
|
$175.000
|
$65.000
|
$100.000
|
|
|
|
BLADING
|
HR
|
70.000
|
$300.000
|
$200.000
|
$400.000
|
$160.000
|
$225.000
|
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
86,671.000
|
$0.250
|
$0.220
|
$0.230
|
$0.210
|
$0.200
|
|
|
|
PROOF ROLLING
|
HR
|
70.000
|
$140.000
|
$200.000
|
$165.000
|
$86.750
|
$125.000
|
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
91,141.000
|
$15.000
|
$12.000
|
$15.000
|
$20.000
|
$21.000
|
|
|
|
PRIME COAT (MC-30)
|
GAL
|
18,235.000
|
$5.000
|
$5.000
|
$5.780
|
$6.350
|
$5.000
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
69,266.000
|
$3.000
|
$3.900
|
$4.920
|
$5.000
|
$4.500
|
|
|
|
AGGR (TY-PB, GR-4)(SAC-A)
|
CY
|
1,521.000
|
$150.000
|
$150.000
|
$153.000
|
$200.000
|
$170.000
|
|
|
|
TACK COAT
|
GAL
|
15,957.000
|
$6.000
|
$4.000
|
$4.570
|
$6.100
|
$4.000
|
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
11,572.000
|
$180.000
|
$188.000
|
$149.000
|
$215.000
|
$157.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
131.000
|
$210.000
|
$320.000
|
$220.000
|
$350.000
|
$400.000
|
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
136.000
|
$440.000
|
$320.000
|
$445.500
|
$395.000
|
$400.000
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
7.000
|
$600.000
|
$1,100.000
|
$1,320.000
|
$900.000
|
$2,000.000
|
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
64.000
|
$575.000
|
$1,155.000
|
$819.500
|
$550.000
|
$1,250.000
|
|
|
|
RC PIPE (CL III)(12 IN)
|
LF
|
40.000
|
$160.000
|
$62.000
|
$66.000
|
$95.000
|
$190.000
|
|
|
|
SET (TY I)(S= 6 FT)(HW= 2 FT)(6:1)(C)
|
EA
|
2.000
|
$15,000.000
|
$15,000.000
|
$7,535.000
|
$15,000.000
|
$16,500.000
|
|
|
|
SET (TY II) (12 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$1,600.000
|
$2,805.000
|
$2,000.000
|
$1,900.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,700.000
|
$2,600.000
|
$3,052.500
|
$2,100.000
|
$2,100.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$1,900.000
|
$2,400.000
|
$3,052.500
|
$2,400.000
|
$2,150.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
7.000
|
$2,000.000
|
$2,500.000
|
$3,374.250
|
$2,400.000
|
$2,400.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
12.000
|
$2,200.000
|
$2,600.000
|
$3,935.250
|
$2,600.000
|
$2,800.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
15.000
|
$2,200.000
|
$2,600.000
|
$3,935.250
|
$2,700.000
|
$2,800.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$3,700.000
|
$3,900.000
|
$4,636.500
|
$3,200.000
|
$3,300.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
8.000
|
$4,000.000
|
$4,400.000
|
$5,643.000
|
$3,800.000
|
$4,200.000
|
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$4,400.000
|
$5,643.000
|
$3,800.000
|
$4,200.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,000.000
|
$10,500.000
|
$9,289.500
|
$5,500.000
|
$4,800.000
|
|
|
|
SET (TY II)(18 IN)(RCP)(3:1)(P)
|
EA
|
1.000
|
$1,900.000
|
$2,100.000
|
$3,052.500
|
$2,200.000
|
$2,100.000
|
|
|
|
SET(TY II)(24 IN)(RCP)(3:1)(P)
|
EA
|
1.000
|
$1,900.000
|
$2,400.000
|
$3,102.000
|
$2,200.000
|
$2,100.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
9.000
|
$2,500.000
|
$2,500.000
|
$2,750.000
|
$4,000.000
|
$5,700.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
33.000
|
$1,000.000
|
$525.000
|
$660.000
|
$500.000
|
$1,100.000
|
|
|
|
REMOV STR (PIPE)
|
LF
|
41.000
|
$22.000
|
$27.000
|
$33.000
|
$45.000
|
$70.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$511,571.870
|
$700,000.000
|
$761,000.000
|
$800,000.000
|
$850,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$15,000.000
|
$28,000.000
|
$15,000.000
|
$14,750.000
|
$25,000.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$14,000.000
|
$19,250.000
|
$10,000.000
|
$12,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
205.000
|
$200.000
|
$250.000
|
$82.500
|
$200.000
|
$200.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
52.000
|
$370.000
|
$10.000
|
$935.000
|
$675.000
|
$425.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
54.000
|
$75.000
|
$90.000
|
$105.000
|
$85.000
|
$125.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
54.000
|
$10.000
|
$26.000
|
$100.000
|
$25.000
|
$30.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,413.000
|
$10.000
|
$11.000
|
$10.990
|
$10.000
|
$15.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,413.000
|
$1.500
|
$1.600
|
$1.650
|
$1.500
|
$1.750
|
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
2.000
|
$7,000.000
|
$3,700.000
|
$8,250.000
|
$5,000.000
|
$5,000.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
623.000
|
$50.000
|
$71.000
|
$87.000
|
$90.000
|
$115.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,158.000
|
$70.000
|
$55.000
|
$87.000
|
$75.000
|
$105.000
|
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
80,731.000
|
$0.200
|
$0.150
|
$0.200
|
$0.260
|
$0.150
|
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
24,257.000
|
$0.200
|
$0.150
|
$0.240
|
$0.470
|
$0.250
|
|
|
|
IN RD IL (TY SA) 40T-10 (250W EQ) LED
|
EA
|
17.000
|
$6,510.000
|
$7,000.000
|
$6,820.000
|
$5,750.000
|
$7,500.000
|
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,390.000
|
$10.000
|
$16.000
|
$28.600
|
$25.000
|
$20.000
|
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
393.000
|
$40.000
|
$22.000
|
$46.200
|
$45.000
|
$25.000
|
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
3,908.000
|
$2.000
|
$3.000
|
$2.480
|
$3.000
|
$3.500
|
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
7,816.000
|
$3.000
|
$3.500
|
$3.030
|
$3.050
|
$3.750
|
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
6.000
|
$2,000.000
|
$1,600.000
|
$2,420.000
|
$1,950.000
|
$2,000.000
|
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$13,750.000
|
$11,000.000
|
$11,825.000
|
$10,500.000
|
$12,000.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
15.000
|
$800.000
|
$1,100.000
|
$855.800
|
$800.000
|
$1,250.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$900.000
|
$1,100.000
|
$1,135.200
|
$1,035.000
|
$1,250.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,300.000
|
$1,100.000
|
$1,612.600
|
$1,500.000
|
$1,250.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
27.000
|
$175.000
|
$110.000
|
$110.000
|
$175.000
|
$125.000
|
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
22.000
|
$80.000
|
$80.000
|
$68.200
|
$65.000
|
$100.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
185,800.000
|
$0.250
|
$0.180
|
$0.200
|
$0.140
|
$0.150
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
161,800.000
|
$0.250
|
$0.180
|
$0.200
|
$0.140
|
$0.150
|
|
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
75.000
|
$2.000
|
$3.000
|
$3.300
|
$0.950
|
$1.250
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,952.000
|
$1.000
|
$0.900
|
$0.940
|
$0.950
|
$1.250
|
|
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
80,731.000
|
$0.500
|
$0.700
|
$0.720
|
$0.620
|
$0.750
|
|
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
8,984.000
|
$0.500
|
$0.700
|
$0.720
|
$0.620
|
$0.750
|
|
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
15,408.000
|
$0.500
|
$0.700
|
$0.720
|
$0.620
|
$0.750
|
|
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
24.000
|
$20.000
|
$15.000
|
$15.400
|
$10.000
|
$12.000
|
|
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
6.000
|
$300.000
|
$270.000
|
$275.000
|
$175.000
|
$225.000
|
|
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
5.000
|
$350.000
|
$320.000
|
$330.000
|
$240.000
|
$300.000
|
|
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
8.000
|
$35.000
|
$26.000
|
$27.500
|
$50.000
|
$65.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
104.000
|
$4.000
|
$4.500
|
$4.400
|
$4.500
|
$6.000
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
644.000
|
$4.000
|
$4.500
|
$4.400
|
$4.500
|
$6.000
|
|
|
|
BONDING COURSE
|
GAL
|
39,885.000
|
$3.000
|
$3.000
|
$4.630
|
$6.000
|
$6.000
|
|
1
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
34.000
|
$170.000
|
$0.000
|
$0.000
|
$115.000
|
$325.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
34.000
|
$170.000
|
$65.000
|
$110.690
|
$0.000
|
$0.000
|
|
2
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
672.000
|
$180.000
|
$0.000
|
$0.000
|
$150.000
|
$275.000
|
|
2A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
672.000
|
$180.000
|
$135.000
|
$128.960
|
$0.000
|
$0.000
|
|
3
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
236.000
|
$190.000
|
$0.000
|
$0.000
|
$175.000
|
$300.000
|
|
3A
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
236.000
|
$190.000
|
$220.000
|
$155.770
|
$0.000
|
$0.000
|
|
4
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
20.000
|
$200.000
|
$0.000
|
$0.000
|
$225.000
|
$400.000
|
|
4A
|
|
THERMOPLASTIC PIPE (PP) (36")
|
LF
|
20.000
|
$200.000
|
$270.000
|
$229.700
|
$0.000
|
$0.000
|
|
Totals: |
$6,920,543.220
|
$7,369,593.920
|
$7,372,324.850
|
$8,439,252.420
|
$8,460,205.850
|