REMOVING CONC (RIPRAP)
|
SY
|
340.000
|
$10.000
|
$40.000
|
$14.000
|
$84.000
|
$12.000
|
$23.690
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
160.000
|
$10.000
|
$40.000
|
$25.000
|
$70.000
|
$20.000
|
$27.920
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
295.000
|
$27.000
|
$35.000
|
$35.000
|
$20.000
|
$20.000
|
$25.380
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
900.000
|
$40.000
|
$40.000
|
$35.000
|
$12.000
|
$40.000
|
$32.710
|
|
|
BLADING
|
HR
|
20.000
|
$160.000
|
$150.000
|
$100.000
|
$108.000
|
$150.000
|
$167.700
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
1,985.000
|
$4.000
|
$5.000
|
$3.000
|
$1.600
|
$4.000
|
$1.100
|
|
|
PROOF ROLLING
|
HR
|
5.000
|
$100.000
|
$100.000
|
$80.000
|
$76.000
|
$300.000
|
$129.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
3,221.000
|
$30.000
|
$20.500
|
$28.000
|
$18.000
|
$58.000
|
$30.140
|
|
|
EMULS ASPH (PRIME)(AE-P)
|
GAL
|
643.000
|
$10.000
|
$8.000
|
$6.000
|
$11.000
|
$12.000
|
$10.580
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
4,160.000
|
$6.000
|
$6.000
|
$6.000
|
$4.000
|
$6.600
|
$4.470
|
|
|
ASPH (RC-250)
|
GAL
|
969.000
|
$8.000
|
$9.550
|
$6.000
|
$7.000
|
$6.500
|
$8.350
|
|
|
AGGR(TY-B GR-4 SAC-A)
|
CY
|
34.000
|
$180.000
|
$185.000
|
$300.000
|
$250.000
|
$900.000
|
$430.280
|
|
|
AGGR(TY-PB GR-2 SAC-A)
|
CY
|
44.000
|
$200.000
|
$150.000
|
$325.000
|
$250.000
|
$960.000
|
$392.890
|
|
|
AGGR(TY-PB GR-3 SAC-A)
|
CY
|
40.000
|
$230.000
|
$160.000
|
$300.000
|
$250.000
|
$1,100.000
|
$416.030
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
29.000
|
$180.000
|
$170.000
|
$370.000
|
$300.000
|
$1,400.000
|
$440.410
|
|
|
TEMPORARY SPL SHORING
|
SF
|
240.000
|
$16.000
|
$125.000
|
$30.000
|
$35.000
|
$75.000
|
$61.830
|
|
|
DRILL SHAFT (24 IN) (HPC)
|
LF
|
100.000
|
$220.000
|
$185.000
|
$150.000
|
$280.000
|
$165.000
|
$207.690
|
|
|
DRILL SHAFT (42 IN) (HPC)
|
LF
|
1,129.000
|
$440.000
|
$460.000
|
$465.000
|
$480.000
|
$411.000
|
$504.890
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
56.400
|
$1,720.000
|
$1,150.000
|
$1,300.000
|
$1,900.000
|
$1,326.000
|
$1,548.530
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
113.500
|
$2,000.000
|
$1,150.000
|
$2,000.000
|
$2,000.000
|
$1,200.000
|
$2,312.970
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
142.600
|
$1,500.000
|
$1,150.000
|
$1,100.000
|
$1,200.000
|
$1,200.000
|
$1,958.560
|
|
|
CL C CONC (MISC)
|
CY
|
35.700
|
$700.000
|
$1,140.000
|
$900.000
|
$1,100.000
|
$1,250.000
|
$1,655.020
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
19,320.000
|
$30.000
|
$28.750
|
$35.000
|
$30.000
|
$24.270
|
$33.310
|
|
|
APPROACH SLAB (HPC)
|
CY
|
84.200
|
$800.000
|
$1,155.000
|
$800.000
|
$800.000
|
$450.000
|
$896.300
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
2,502.000
|
$280.000
|
$215.000
|
$180.000
|
$250.000
|
$142.000
|
$241.360
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
87.100
|
$900.000
|
$645.000
|
$800.000
|
$1,000.000
|
$538.000
|
$828.400
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
41.000
|
$900.000
|
$600.000
|
$800.000
|
$800.000
|
$620.000
|
$881.010
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
62,790.000
|
$3.500
|
$4.000
|
$3.000
|
$2.000
|
$3.230
|
$1.620
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
892.000
|
$240.000
|
$95.000
|
$120.000
|
$180.000
|
$140.000
|
$132.510
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
138.000
|
$90.000
|
$100.000
|
$120.000
|
$230.000
|
$106.000
|
$108.260
|
|
|
TREAT TIMBER
|
MBF
|
1.950
|
$3,500.000
|
$10,000.000
|
$13,000.000
|
$2,200.000
|
$11,000.000
|
$34,400.060
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$400,000.000
|
$360,000.000
|
$150,000.000
|
$300,000.000
|
$250,000.000
|
$394,740.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
342.000
|
$20.000
|
$1.500
|
$3.000
|
$7.000
|
$2.000
|
$4.980
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,000,000.000
|
$340,000.000
|
$410,000.000
|
$404,000.000
|
$490,000.000
|
$606,841.800
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$9,000.000
|
$10,000.000
|
$3,400.000
|
$3,000.000
|
$2,600.000
|
$1,786.160
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
448.000
|
$20.000
|
$20.000
|
$30.000
|
$27.000
|
$30.000
|
$18.710
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
448.000
|
$10.000
|
$15.000
|
$11.000
|
$8.000
|
$10.000
|
$5.160
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
810.000
|
$25.000
|
$2.000
|
$4.000
|
$3.500
|
$3.000
|
$2.390
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
810.000
|
$12.000
|
$0.600
|
$1.000
|
$0.300
|
$2.000
|
$0.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,300.000
|
$6.000
|
$4.000
|
$8.000
|
$7.000
|
$10.000
|
$5.160
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,300.000
|
$1.000
|
$0.600
|
$1.000
|
$0.400
|
$2.000
|
$0.260
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
12.000
|
$10,000.000
|
$4,000.000
|
$6,000.000
|
$1,200.000
|
$5,200.000
|
$6,772.500
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,400.000
|
$55.000
|
$65.000
|
$75.000
|
$43.000
|
$118.000
|
$74.610
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,400.000
|
$20.000
|
$15.000
|
$2.000
|
$3.250
|
$13.000
|
$5.550
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
1,400.000
|
$15.000
|
$25.000
|
$17.000
|
$5.250
|
$14.650
|
$31.730
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
400.000
|
$22.000
|
$25.000
|
$35.000
|
$27.000
|
$30.000
|
$26.450
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,600.000
|
$2,500.000
|
$2,000.000
|
$1,800.000
|
$2,200.000
|
$1,548.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,200.000
|
$3,000.000
|
$2,000.000
|
$2,700.000
|
$2,500.000
|
$2,302.650
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$9,000.000
|
$10,000.000
|
$10,000.000
|
$12,000.000
|
$12,500.000
|
$10,965.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$1,000.000
|
$250.000
|
$2,000.000
|
$1,548.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$850.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$970.000
|
$774.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
319.000
|
$20.000
|
$25.000
|
$14.000
|
$21.000
|
$10.000
|
$9.680
|
|
|
TIMBER POLE (CL 2) 30 FT
|
EA
|
15.000
|
$800.000
|
$600.000
|
$600.000
|
$1,500.000
|
$2,032.000
|
$3,762.510
|
|
|
TIMBER POLE (CL 2) 35 FT
|
EA
|
2.000
|
$900.000
|
$700.000
|
$620.000
|
$1,250.000
|
$3,712.000
|
$3,741.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$600.000
|
$900.000
|
$600.000
|
$1,200.000
|
$700.000
|
$548.250
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$100.000
|
$100.000
|
$150.000
|
$100.000
|
$200.000
|
$83.850
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$30.000
|
$25.000
|
$35.000
|
$25.000
|
$50.000
|
$25.800
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
19.000
|
$30.000
|
$25.000
|
$35.000
|
$25.000
|
$50.000
|
$25.800
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
4.000
|
$20.000
|
$10.000
|
$13.000
|
$14.000
|
$50.000
|
$12.900
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
90.000
|
$4.000
|
$5.500
|
$5.500
|
$5.000
|
$3.250
|
$7.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
13,000.000
|
$0.650
|
$0.980
|
$1.000
|
$1.200
|
$1.200
|
$1.270
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
44.000
|
$8.000
|
$12.000
|
$12.000
|
$16.000
|
$9.200
|
$15.480
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
7,200.000
|
$0.650
|
$0.980
|
$1.000
|
$1.000
|
$1.200
|
$1.270
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,138.000
|
$0.350
|
$0.820
|
$1.000
|
$1.300
|
$1.050
|
$1.060
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
200.000
|
$0.350
|
$0.820
|
$1.000
|
$1.300
|
$1.050
|
$1.060
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,146.000
|
$0.350
|
$0.820
|
$1.000
|
$1.300
|
$1.050
|
$1.060
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
29.000
|
$3.000
|
$7.500
|
$8.000
|
$15.000
|
$3.250
|
$9.710
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,400.000
|
$0.350
|
$3.000
|
$3.000
|
$0.750
|
$0.450
|
$3.870
|
|
|
NO. OF WORKING DAYS
|
$/D
|
3,500.000
|
$289.000
|
$150.000
|
$200.000
|
$187.000
|
$289.000
|
$289.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,500.000
|
$6,000.000
|
$12,000.000
|
$18,000.000
|
$5,000.000
|
$19,350.000
|
|
Totals: |
$6,174,983.400
|
$4,518,994.330
|
$4,575,461.000
|
$4,704,520.200
|
$4,911,236.550
|
$5,774,288.434
|