SUBGR WIDEN (OC)
|
STA
|
313.300
|
$800.000
|
$935.000
|
$1,000.000
|
$225.000
|
$1,100.000
|
$772.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
3,500.000
|
$25.000
|
$11.500
|
$10.000
|
$50.000
|
$46.000
|
$32.000
|
|
|
BACKFILL (TY B)
|
STA
|
313.300
|
$400.000
|
$75.000
|
$135.000
|
$150.000
|
$221.000
|
$432.000
|
|
|
BLADING
|
HR
|
70.000
|
$300.000
|
$161.750
|
$210.000
|
$250.000
|
$425.000
|
$159.000
|
|
|
BROADCAST SEED (TEMP_WARM_COOL)
|
SY
|
42,575.000
|
$0.250
|
$0.090
|
$0.280
|
$0.270
|
$0.100
|
$0.270
|
|
|
PROOF ROLLING
|
HR
|
70.000
|
$200.000
|
$88.250
|
$120.000
|
$215.000
|
$175.000
|
$106.500
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (6")
|
SY
|
70,866.000
|
$12.000
|
$10.500
|
$12.000
|
$16.000
|
$14.500
|
$9.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
14,177.000
|
$5.000
|
$5.500
|
$7.750
|
$5.000
|
$5.700
|
$6.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
53,857.000
|
$3.000
|
$3.750
|
$6.000
|
$5.000
|
$4.310
|
$6.000
|
|
|
AGGR (TY-PB, GR-4)(SAC-A)
|
CY
|
1,182.000
|
$135.000
|
$163.000
|
$120.000
|
$250.000
|
$174.000
|
$160.000
|
|
|
D-GR HMA TY-D PG76-22 (LEVEL-UP)
|
TON
|
2,569.000
|
$110.000
|
$210.000
|
$160.000
|
$215.000
|
$224.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
12,366.000
|
$6.000
|
$4.500
|
$5.000
|
$5.000
|
$5.350
|
$7.440
|
|
|
TOM-C PG76-22 SAC-A
|
TON
|
8,967.000
|
$180.000
|
$195.000
|
$140.000
|
$180.000
|
$165.000
|
$220.000
|
|
|
CEM STABIL BKFL
|
CY
|
1,030.000
|
$300.000
|
$295.000
|
$250.000
|
$330.000
|
$247.500
|
$133.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
410.000
|
$375.000
|
$475.000
|
$850.000
|
$300.000
|
$660.000
|
$416.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
176.000
|
$460.000
|
$285.000
|
$300.000
|
$290.000
|
$440.000
|
$275.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
54.600
|
$2,400.000
|
$1,400.000
|
$2,200.000
|
$2,000.000
|
$1,601.600
|
$946.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
42.400
|
$2,500.000
|
$2,250.000
|
$2,100.000
|
$2,500.000
|
$1,797.180
|
$1,315.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
11.500
|
$2,000.000
|
$1,950.000
|
$1,700.000
|
$2,800.000
|
$2,045.120
|
$2,075.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
8,050.000
|
$35.000
|
$41.000
|
$40.500
|
$40.000
|
$32.420
|
$30.500
|
|
|
APPROACH SLAB (HPC)
|
CY
|
91.500
|
$1,075.000
|
$850.000
|
$1,000.000
|
$1,300.000
|
$1,165.780
|
$719.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,040.900
|
$305.000
|
$250.000
|
$300.000
|
$275.000
|
$275.000
|
$244.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
105.700
|
$1,200.000
|
$725.000
|
$650.000
|
$850.000
|
$577.500
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
36.000
|
$750.000
|
$800.000
|
$850.000
|
$914.000
|
$577.500
|
$750.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
398.000
|
$125.000
|
$90.000
|
$150.000
|
$250.000
|
$126.500
|
$112.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
87.000
|
$150.000
|
$135.000
|
$175.000
|
$250.000
|
$159.500
|
$149.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
144.000
|
$400.000
|
$400.000
|
$600.000
|
$508.000
|
$405.020
|
$578.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)
|
LF
|
308.000
|
$425.000
|
$415.000
|
$850.000
|
$575.000
|
$478.940
|
$561.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
1,940.000
|
$180.000
|
$135.000
|
$200.000
|
$183.000
|
$180.310
|
$163.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
248.000
|
$200.000
|
$250.000
|
$300.000
|
$279.000
|
$325.380
|
$255.000
|
|
|
SET (TY I)(S= 3 FT)(HW= 2 FT)(6:1)(C)
|
EA
|
6.000
|
$7,500.000
|
$10,000.000
|
$10,000.000
|
$6,350.000
|
$8,608.600
|
$12,100.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 2 FT)(6:1)(C)
|
EA
|
10.000
|
$9,000.000
|
$10,000.000
|
$11,000.000
|
$9,350.000
|
$8,762.600
|
$11,800.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$2,000.870
|
$1,500.000
|
$1,450.000
|
$2,767.380
|
$2,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$2,500.000
|
$1,800.000
|
$1,800.000
|
$1,800.000
|
$3,050.740
|
$2,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
64.000
|
$3,000.000
|
$1,800.000
|
$2,100.000
|
$2,300.000
|
$3,495.800
|
$2,900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$3,000.000
|
$1,900.000
|
$2,100.000
|
$2,300.000
|
$3,495.800
|
$2,900.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$3,090.000
|
$5,000.000
|
$4,000.000
|
$5,132.820
|
$4,700.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
8.000
|
$4,800.000
|
$3,800.000
|
$5,200.000
|
$5,100.000
|
$7,747.740
|
$6,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$5,300.000
|
$4,600.000
|
$7,000.000
|
$6,600.000
|
$9,346.260
|
$6,800.000
|
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
20.000
|
$180.000
|
$160.000
|
$200.000
|
$165.000
|
$137.500
|
$150.000
|
|
|
THERMOPLASTIC PIPE (PP) (30")
|
LF
|
20.000
|
$190.000
|
$175.000
|
$250.000
|
$185.000
|
$137.500
|
$245.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$2,500.000
|
$3,000.000
|
$3,500.000
|
$1,575.000
|
$3,850.000
|
$2,850.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
2.000
|
$3,000.000
|
$2,500.000
|
$10,000.000
|
$11,000.000
|
$2,750.000
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$900.000
|
$500.000
|
$1,000.000
|
$775.000
|
$1,320.000
|
$1,045.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
18.000
|
$1,200.000
|
$1,500.000
|
$3,000.000
|
$1,550.000
|
$990.000
|
$2,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
54.000
|
$1,000.000
|
$1,500.000
|
$2,000.000
|
$1,550.000
|
$880.000
|
$1,500.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$160,000.000
|
$150,000.000
|
$105,000.000
|
$50,000.000
|
$137,500.000
|
$1,000,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$804,021.400
|
$850,000.000
|
$900,000.000
|
$772,000.000
|
$1,081,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$25,000.000
|
$15,000.000
|
$14,000.000
|
$15,000.000
|
$45,000.000
|
$61,270.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$12,000.000
|
$11,000.000
|
$12,500.000
|
$19,250.000
|
$11,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
172.000
|
$250.000
|
$20.000
|
$300.000
|
$300.000
|
$250.000
|
$230.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
43.000
|
$370.000
|
$50.000
|
$650.000
|
$700.000
|
$935.000
|
$575.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
54.000
|
$75.000
|
$50.650
|
$132.000
|
$105.000
|
$54.510
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
54.000
|
$10.000
|
$22.550
|
$20.000
|
$21.000
|
$28.660
|
$20.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,752.000
|
$10.000
|
$9.550
|
$15.000
|
$11.000
|
$8.880
|
$9.990
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,752.000
|
$1.500
|
$1.700
|
$2.200
|
$2.750
|
$2.060
|
$2.500
|
|
|
INTERSECTIONS (ACP)
|
SY
|
721.000
|
$75.000
|
$70.000
|
$90.000
|
$100.000
|
$110.000
|
$70.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
227.000
|
$115.000
|
$150.000
|
$350.000
|
$225.000
|
$200.000
|
$140.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,301.000
|
$80.000
|
$75.000
|
$90.000
|
$100.000
|
$90.000
|
$90.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
61,796.000
|
$0.200
|
$0.300
|
$0.140
|
$0.160
|
$0.150
|
$0.070
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
12,510.000
|
$0.200
|
$0.460
|
$0.450
|
$0.160
|
$0.420
|
$0.210
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
350.000
|
$40.000
|
$40.000
|
$50.000
|
$50.000
|
$50.600
|
$45.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,700.000
|
$2,800.000
|
$5,000.000
|
$3,950.000
|
$4,125.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.000
|
$4.500
|
$6.500
|
$5.250
|
$5.500
|
$6.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$1,500.000
|
$375.000
|
$700.000
|
$525.000
|
$550.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,600.000
|
$3,750.000
|
$5,000.000
|
$4,200.000
|
$4,400.000
|
$3,700.000
|
|
|
IN RD IL (TY SA) 40T-10 (250W EQ) LED
|
EA
|
22.000
|
$7,000.000
|
$5,350.000
|
$6,000.000
|
$5,775.000
|
$7,260.000
|
$5,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,186.000
|
$10.000
|
$15.250
|
$20.000
|
$16.000
|
$24.200
|
$15.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
439.000
|
$40.000
|
$36.000
|
$40.000
|
$21.000
|
$39.600
|
$20.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,760.000
|
$2.000
|
$2.150
|
$2.500
|
$2.750
|
$2.750
|
$2.500
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
9,520.000
|
$3.000
|
$2.100
|
$2.500
|
$3.000
|
$3.030
|
$2.750
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$2,000.000
|
$1,000.000
|
$1,200.000
|
$1,575.000
|
$2,530.000
|
$1,500.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
2.000
|
$13,750.000
|
$8,675.000
|
$10,000.000
|
$7,875.000
|
$12,650.000
|
$7,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
25.000
|
$1,000.000
|
$775.000
|
$900.000
|
$825.000
|
$939.400
|
$854.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
28.000
|
$1,000.000
|
$850.000
|
$1,000.000
|
$900.000
|
$1,190.200
|
$1,082.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,200.000
|
$990.000
|
$1,100.000
|
$1,050.000
|
$1,486.100
|
$1,351.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$1,300.000
|
$1,200.000
|
$1,500.000
|
$1,300.000
|
$1,750.100
|
$1,591.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
52.000
|
$175.000
|
$100.000
|
$200.000
|
$105.000
|
$150.000
|
$150.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
|
EA
|
12.000
|
$35.000
|
$45.000
|
$40.000
|
$50.000
|
$49.500
|
$13.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
54.000
|
$80.000
|
$80.000
|
$90.000
|
$84.000
|
$71.500
|
$65.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
125,727.000
|
$0.250
|
$0.170
|
$0.180
|
$0.180
|
$0.190
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
125,727.000
|
$0.250
|
$0.170
|
$0.180
|
$0.180
|
$0.190
|
$0.170
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,000.000
|
$0.500
|
$2.290
|
$0.730
|
$1.140
|
$3.010
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
75.000
|
$2.000
|
$1.100
|
$1.200
|
$1.160
|
$3.300
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,389.000
|
$1.000
|
$1.100
|
$1.200
|
$1.160
|
$0.940
|
$1.100
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
62,660.000
|
$0.500
|
$0.650
|
$0.700
|
$0.680
|
$0.640
|
$0.650
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
7,372.000
|
$0.500
|
$0.650
|
$0.700
|
$0.680
|
$0.860
|
$0.650
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
6,167.000
|
$0.500
|
$0.650
|
$0.700
|
$0.680
|
$0.860
|
$0.650
|
|
PREFAB PM TY C (W)(24")(SLD)
|
LF
|
48.000
|
$20.000
|
$10.000
|
$10.500
|
$11.000
|
$15.400
|
$10.000
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
6.000
|
$300.000
|
$175.000
|
$180.000
|
$185.000
|
$352.000
|
$175.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
5.000
|
$350.000
|
$200.000
|
$205.000
|
$210.000
|
$418.000
|
$200.000
|
|
PREFAB PM TY C (W)(36")(YLD TRI)
|
EA
|
8.000
|
$35.000
|
$38.000
|
$40.000
|
$40.000
|
$27.500
|
$38.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
126.000
|
$4.000
|
$5.000
|
$5.500
|
$5.250
|
$4.950
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
460.000
|
$4.000
|
$5.000
|
$5.500
|
$5.250
|
$4.950
|
$5.000
|
|
|
BONDING COURSE
|
GAL
|
30,908.000
|
$3.000
|
$4.000
|
$5.000
|
$4.500
|
$4.910
|
$5.500
|
|
Totals: |
$8,844,235.350
|
$8,604,312.000
|
$9,182,210.410
|
$9,411,558.990
|
$10,147,937.502
|
$10,673,570.920
|