REMOVING CONC (RIPRAP)
|
SY
|
682.000
|
$45.000
|
$35.000
|
$7.820
|
$35.000
|
$31.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
23,684.000
|
$10.000
|
$14.000
|
$10.060
|
$10.000
|
$18.800
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
15,812.000
|
$10.000
|
$2.200
|
$6.760
|
$10.000
|
$18.800
|
|
|
BACKFILL (TY A OR B)
|
STA
|
251.000
|
$10.000
|
$216.000
|
$243.080
|
$225.000
|
$158.500
|
|
|
BACKFILLING PAVEMENT EDGES
|
CY
|
300.000
|
$30.000
|
$195.000
|
$105.670
|
$40.000
|
$52.500
|
|
|
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
|
CY
|
20,713.000
|
$100.000
|
$98.000
|
$99.100
|
$80.000
|
$106.850
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
438.000
|
$300.000
|
$290.000
|
$352.000
|
$400.000
|
$357.500
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
40,273.000
|
$10.000
|
$2.600
|
$3.330
|
$3.250
|
$3.240
|
|
|
CEMENT
|
TON
|
2,893.000
|
$200.000
|
$214.000
|
$204.390
|
$200.000
|
$247.500
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
155,866.000
|
$10.000
|
$2.350
|
$1.430
|
$2.250
|
$3.540
|
|
|
PRIME COAT (RC-250)
|
GAL
|
36,182.000
|
$5.000
|
$4.150
|
$4.220
|
$4.500
|
$4.970
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
1,411.000
|
$100.000
|
$161.000
|
$143.640
|
$140.000
|
$160.100
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
|
SY
|
10,568.000
|
$50.000
|
$38.000
|
$42.710
|
$50.000
|
$43.290
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
1,960.000
|
$5.000
|
$10.000
|
$3.400
|
$12.000
|
$4.640
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
116,956.000
|
$4.000
|
$5.200
|
$3.400
|
$2.500
|
$3.270
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
6.000
|
$600.000
|
$859.000
|
$674.240
|
$1,200.000
|
$952.230
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
163.000
|
$230.000
|
$215.000
|
$252.000
|
$175.000
|
$273.540
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
116.000
|
$500.000
|
$617.000
|
$689.920
|
$750.000
|
$842.240
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
10.000
|
$1,500.000
|
$1,340.000
|
$872.480
|
$650.000
|
$1,396.850
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
36.000
|
$1,200.000
|
$2,040.000
|
$879.200
|
$550.000
|
$1,294.400
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
6.000
|
$2,100.000
|
$2,840.000
|
$1,665.440
|
$1,200.000
|
$3,526.940
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
490.000
|
$155.000
|
$167.000
|
$99.680
|
$125.000
|
$159.460
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$35,000.000
|
$54,700.000
|
$33,600.000
|
$60,000.000
|
$47,511.150
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
3.000
|
$20,000.000
|
$10,500.000
|
$9,968.000
|
$14,000.000
|
$7,687.620
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
3.000
|
$20,000.000
|
$11,200.000
|
$10,080.000
|
$14,000.000
|
$9,735.610
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
3.000
|
$10,000.000
|
$11,300.000
|
$10,080.000
|
$14,000.000
|
$10,998.970
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C)
|
EA
|
1.000
|
$13,000.000
|
$12,400.000
|
$10,192.000
|
$17,000.000
|
$16,490.110
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$17,500.000
|
$11,600.000
|
$12,096.000
|
$34,000.000
|
$20,571.530
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
2.000
|
$11,500.000
|
$12,900.000
|
$12,880.000
|
$17,000.000
|
$14,123.380
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
2.000
|
$21,000.000
|
$16,600.000
|
$14,672.000
|
$17,000.000
|
$14,141.220
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
6.000
|
$22,000.000
|
$16,300.000
|
$16,800.000
|
$16,000.000
|
$11,417.180
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
6.000
|
$20,000.000
|
$20,000.000
|
$17,920.000
|
$22,000.000
|
$16,189.840
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
26.000
|
$2,500.000
|
$2,480.000
|
$1,696.800
|
$3,000.000
|
$3,875.180
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
31.000
|
$2,750.000
|
$765.000
|
$2,576.000
|
$2,000.000
|
$3,200.400
|
|
|
REMOV STR (SET)
|
EA
|
35.000
|
$400.000
|
$1,260.000
|
$1,067.170
|
$1,000.000
|
$2,155.090
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$5,000.000
|
$12,600.000
|
$1,333.970
|
$4,000.000
|
$4,757.030
|
|
|
REMOV STR (PIPE)
|
LF
|
490.000
|
$25.000
|
$22.000
|
$21.780
|
$30.000
|
$39.120
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,203,997.590
|
$500,800.000
|
$600,290.460
|
$1,025,958.810
|
$1,556,247.720
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$7,500.000
|
$9,520.000
|
$5,373.770
|
$10,000.000
|
$3,722.220
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,320.000
|
$6.000
|
$5.900
|
$8.120
|
$6.000
|
$5.350
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,320.000
|
$1.000
|
$1.500
|
$2.800
|
$2.000
|
$1.350
|
|
|
CONSTRUCTING DETOURS
|
SY
|
16,413.000
|
$75.000
|
$23.000
|
$16.980
|
$75.000
|
$41.400
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
360.000
|
$75.000
|
$35.000
|
$46.750
|
$120.000
|
$41.420
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
360.000
|
$10.000
|
$26.000
|
$42.980
|
$40.000
|
$15.650
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
360.000
|
$20.000
|
$28.000
|
$21.580
|
$100.000
|
$19.610
|
|
|
DRIVEWAYS (ACP)
|
SY
|
434.000
|
$50.000
|
$67.000
|
$103.570
|
$30.000
|
$55.200
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
101,140.000
|
$0.200
|
$0.200
|
$0.130
|
$0.200
|
$0.130
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
47,950.000
|
$0.200
|
$0.250
|
$0.260
|
$0.200
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,550.000
|
$30.000
|
$27.000
|
$27.100
|
$25.000
|
$25.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
2.000
|
$1,300.000
|
$1,490.000
|
$1,680.000
|
$1,500.000
|
$1,350.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,600.000
|
$10.000
|
$3.850
|
$3.920
|
$4.000
|
$3.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$4,000.000
|
$3,730.000
|
$3,780.000
|
$4,000.000
|
$3,375.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
8.000
|
$500.000
|
$249.000
|
$252.000
|
$250.000
|
$225.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
$2,000.000
|
$1,110.000
|
$2,800.000
|
$1,200.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
8.000
|
$1,000.000
|
$1,110.000
|
$1,680.000
|
$1,200.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
8.000
|
$10,000.000
|
$9,380.000
|
$8,400.000
|
$15,000.000
|
$8,475.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
21.000
|
$800.000
|
$830.000
|
$868.000
|
$825.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
3.000
|
$900.000
|
$885.000
|
$924.000
|
$850.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$975.000
|
$941.000
|
$1,344.000
|
$950.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,200.000
|
$1,050.000
|
$1,680.000
|
$1,000.000
|
$950.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
28.000
|
$75.000
|
$111.000
|
$84.000
|
$200.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
51,350.000
|
$0.500
|
$0.650
|
$0.650
|
$0.650
|
$0.580
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
4,958.000
|
$0.500
|
$0.650
|
$0.650
|
$0.650
|
$0.580
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
14,451.000
|
$0.500
|
$0.650
|
$0.650
|
$0.650
|
$0.580
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,800.000
|
$5.000
|
$0.400
|
$0.380
|
$0.400
|
$0.340
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
55,440.000
|
$5.000
|
$0.400
|
$0.380
|
$0.400
|
$0.340
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
4,375.000
|
$2.000
|
$2.450
|
$1.680
|
$1.000
|
$1.630
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
|
LF
|
4,594.000
|
$0.500
|
$0.750
|
$0.760
|
$0.750
|
$0.680
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
104,440.000
|
$0.500
|
$0.750
|
$0.760
|
$0.750
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
6,290.000
|
$0.500
|
$0.750
|
$0.760
|
$0.750
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
62,808.000
|
$0.500
|
$0.750
|
$0.760
|
$0.750
|
$0.680
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
20.000
|
$15.000
|
$18.000
|
$17.920
|
$18.000
|
$16.000
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
1,938.000
|
$12.000
|
$11.000
|
$11.200
|
$12.000
|
$10.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
41.000
|
$5.000
|
$5.550
|
$5.600
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,997.000
|
$5.000
|
$5.550
|
$5.600
|
$5.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
72,599.000
|
$2.000
|
$0.500
|
$0.500
|
$0.500
|
$0.450
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
20,350.000
|
$150.000
|
$102.000
|
$123.640
|
$125.000
|
$116.700
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
26,415.000
|
$150.000
|
$114.000
|
$133.830
|
$135.000
|
$125.500
|
|
|
TACK COAT
|
GAL
|
21,683.000
|
$5.000
|
$3.850
|
$3.640
|
$5.000
|
$3.780
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
500.000
|
$100.000
|
$60.000
|
$56.000
|
$40.000
|
$108.250
|
|
|
TMA (STATIONARY)
|
DAY
|
500.000
|
$100.000
|
$190.000
|
$50.400
|
$50.000
|
$108.250
|
|
Totals: |
$18,249,484.090
|
$13,060,414.350
|
$13,445,431.240
|
$14,984,340.410
|
$15,613,375.690
|