|
|
PREPARING ROW
|
STA
|
498.260
|
$800.000
|
$183.450
|
$240.550
|
$130.000
|
$86.580
|
$47.000
|
$100.000
|
$50.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,667.000
|
$15.000
|
$5.610
|
$8.300
|
$6.500
|
$2.220
|
$9.450
|
$10.000
|
$14.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
90.000
|
$500.000
|
$447.000
|
$209.000
|
$1,400.000
|
$408.930
|
$1,300.000
|
$320.000
|
$2,425.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
498.260
|
$150.000
|
$106.050
|
$122.100
|
$210.000
|
$108.280
|
$117.000
|
$225.000
|
$100.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
5,995.000
|
$0.500
|
$0.890
|
$1.880
|
$2.000
|
$1.380
|
$0.850
|
$4.000
|
$0.800
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
2,998.000
|
$0.540
|
$0.250
|
$0.480
|
$1.000
|
$1.280
|
$0.300
|
$0.720
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
2,998.000
|
$0.540
|
$0.250
|
$0.480
|
$1.000
|
$1.280
|
$0.300
|
$0.720
|
$0.500
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
5,995.000
|
$0.150
|
$0.400
|
$0.450
|
$1.000
|
$1.220
|
$0.450
|
$0.800
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
110.000
|
$20.000
|
$16.650
|
$25.000
|
$47.000
|
$19.980
|
$56.000
|
$30.000
|
$15.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
4,416.000
|
$70.000
|
$76.010
|
$73.080
|
$90.000
|
$80.560
|
$88.000
|
$80.000
|
$85.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
354.980
|
$200.000
|
$162.750
|
$195.370
|
$220.000
|
$184.810
|
$218.000
|
$225.000
|
$200.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
17,750.190
|
$3.000
|
$1.600
|
$2.310
|
$2.500
|
$3.710
|
$3.300
|
$3.250
|
$3.300
|
|
|
PRIME COAT (MC-30)
|
GAL
|
4,251.000
|
$4.000
|
$3.470
|
$3.880
|
$3.500
|
$3.460
|
$3.450
|
$4.000
|
$3.950
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
6,798.000
|
$2.500
|
$2.830
|
$2.460
|
$2.500
|
$3.100
|
$2.000
|
$2.500
|
$2.650
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
3,130.000
|
$80.000
|
$83.630
|
$89.700
|
$100.000
|
$108.400
|
$115.000
|
$80.000
|
$100.000
|
|
|
ASPH (AC-15P OR AC-20-5TR)
|
GAL
|
88,349.000
|
$3.000
|
$3.090
|
$3.000
|
$3.000
|
$2.830
|
$2.650
|
$2.750
|
$3.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
10,933.000
|
$42.000
|
$28.980
|
$30.010
|
$35.000
|
$40.820
|
$40.000
|
$50.000
|
$43.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
60,665.000
|
$2.500
|
$1.130
|
$1.710
|
$1.250
|
$3.000
|
$2.000
|
$1.200
|
$1.350
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,500.000
|
$2.000
|
$3.260
|
$1.710
|
$2.000
|
$12.150
|
$2.000
|
$3.500
|
$2.500
|
|
|
CEM STABIL BKFL
|
CY
|
15.000
|
$68.000
|
$180.000
|
$150.000
|
$115.000
|
$172.050
|
$54.000
|
$100.000
|
$180.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
42.000
|
$9.000
|
$10.000
|
$1,075.600
|
$49.000
|
$11.100
|
$1.000
|
$25.000
|
$100.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
15.000
|
$500.000
|
$470.000
|
$625.000
|
$800.000
|
$888.000
|
$541.000
|
$625.000
|
$540.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
442.700
|
$500.000
|
$475.000
|
$444.400
|
$500.000
|
$493.950
|
$483.000
|
$465.000
|
$590.000
|
|
|
RAIL (TY T631)
|
LF
|
600.000
|
$85.000
|
$70.000
|
$89.770
|
$80.000
|
$77.700
|
$78.000
|
$105.000
|
$75.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
117.000
|
$500.000
|
$600.000
|
$715.000
|
$500.000
|
$333.000
|
$424.000
|
$370.000
|
$540.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
76.000
|
$90.000
|
$85.000
|
$113.000
|
$150.000
|
$166.500
|
$91.000
|
$85.000
|
$100.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$14,312.000
|
$13,000.000
|
$41,000.000
|
$32,000.000
|
$4,995.000
|
$18,400.000
|
$34,000.000
|
$21,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
6.000
|
$2,500.000
|
$1,400.000
|
$1,706.760
|
$1,500.000
|
$2,442.000
|
$1,840.000
|
$1,600.000
|
$2,250.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
$1,350.000
|
$2,400.000
|
$1,925.000
|
$2,000.000
|
$888.000
|
$2,790.000
|
$700.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,500.000
|
$2,000.000
|
$4,300.000
|
$15,000.000
|
$2,775.000
|
$4,690.000
|
$1,000.000
|
$7,400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$450,000.000
|
$381,500.000
|
$233,710.000
|
$100,000.000
|
$157,184.270
|
$255,000.000
|
$250,000.000
|
$297,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$8,500.000
|
$2,970.000
|
$1,035.250
|
$9,500.000
|
$3,330.000
|
$2,170.000
|
$2,500.000
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$25.000
|
$30.000
|
$47.980
|
$130.000
|
$75.480
|
$33.000
|
$30.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$11.000
|
$15.220
|
$8.690
|
$88.000
|
$39.960
|
$17.000
|
$10.000
|
$9.300
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,092.000
|
$25.000
|
$15.980
|
$10.000
|
$43.000
|
$5.550
|
$24.000
|
$20.000
|
$24.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,092.000
|
$8.000
|
$8.880
|
$8.150
|
$12.000
|
$15.260
|
$6.900
|
$5.000
|
$6.150
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,530.000
|
$2.500
|
$2.180
|
$2.580
|
$3.000
|
$2.550
|
$2.450
|
$2.250
|
$2.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,530.000
|
$1.000
|
$0.660
|
$0.450
|
$1.500
|
$0.560
|
$0.750
|
$0.550
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
300.000
|
$7.500
|
$4.760
|
$8.590
|
$7.000
|
$10.820
|
$5.400
|
$6.500
|
$9.200
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
300.000
|
$1.500
|
$0.660
|
$1.010
|
$3.000
|
$4.380
|
$0.750
|
$2.150
|
$1.050
|
|
|
DRIVEWAYS AND TURNOUTS (SURF TREAT)
|
SY
|
781.000
|
$30.000
|
$30.660
|
$21.960
|
$26.000
|
$24.420
|
$32.000
|
$20.000
|
$20.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
99,385.000
|
$0.150
|
$0.100
|
$0.280
|
$0.200
|
$0.170
|
$0.200
|
$0.150
|
$0.170
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
47,398.000
|
$0.180
|
$0.130
|
$0.280
|
$0.200
|
$0.200
|
$0.250
|
$0.150
|
$0.240
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
5,250.000
|
$22.000
|
$17.500
|
$18.690
|
$20.000
|
$19.430
|
$19.000
|
$20.000
|
$18.950
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
6.000
|
$1,000.000
|
$650.000
|
$808.000
|
$750.000
|
$721.500
|
$721.000
|
$750.000
|
$700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,761.000
|
$2.500
|
$1.250
|
$1.260
|
$2.000
|
$1.390
|
$1.400
|
$1.500
|
$1.350
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
15.000
|
$140.000
|
$165.000
|
$101.000
|
$225.000
|
$183.150
|
$183.000
|
$220.000
|
$180.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$165.000
|
$175.000
|
$101.000
|
$200.000
|
$194.250
|
$194.000
|
$275.000
|
$190.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
36.000
|
$2,400.000
|
$2,250.000
|
$2,272.500
|
$2,600.000
|
$2,497.500
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
25.000
|
$275.000
|
$250.000
|
$252.500
|
$300.000
|
$277.500
|
$277.000
|
$125.000
|
$270.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
22.000
|
$30.000
|
$25.000
|
$28.280
|
$50.000
|
$31.080
|
$28.000
|
$30.000
|
$27.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$467.000
|
$520.000
|
$606.000
|
$850.000
|
$832.500
|
$577.000
|
$800.000
|
$565.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$620.000
|
$645.000
|
$656.500
|
$1,000.000
|
$999.000
|
$715.000
|
$975.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$850.000
|
$810.000
|
$828.200
|
$1,700.000
|
$1,609.500
|
$898.000
|
$1,550.000
|
$875.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
4.000
|
$125.000
|
$95.000
|
$30.300
|
$35.000
|
$83.250
|
$105.000
|
$11.000
|
$102.800
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
10.000
|
$51.000
|
$105.000
|
$50.500
|
$98.000
|
$94.350
|
$116.000
|
$90.000
|
$113.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
94.000
|
$13.000
|
$25.000
|
$11.110
|
$21.000
|
$19.980
|
$28.000
|
$20.000
|
$27.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
4.000
|
$74.000
|
$105.000
|
$55.550
|
$110.000
|
$105.450
|
$116.000
|
$100.000
|
$110.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
1,880.000
|
$2.000
|
$0.250
|
$0.250
|
$0.500
|
$0.280
|
$0.150
|
$0.300
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
375.000
|
$0.940
|
$0.120
|
$0.350
|
$0.400
|
$0.390
|
$0.550
|
$0.400
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
18,000.000
|
$0.290
|
$0.120
|
$0.180
|
$0.250
|
$0.200
|
$0.150
|
$0.200
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
18,000.000
|
$0.280
|
$0.340
|
$0.180
|
$0.250
|
$0.200
|
$0.150
|
$0.200
|
$0.370
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
9,000.000
|
$0.760
|
$0.500
|
$0.530
|
$0.600
|
$0.580
|
$0.700
|
$0.550
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
18,000.000
|
$0.750
|
$0.590
|
$0.510
|
$0.600
|
$0.560
|
$0.700
|
$0.550
|
$0.650
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,982.000
|
$1.000
|
$1.410
|
$1.250
|
$1.150
|
$0.890
|
$1.100
|
$0.500
|
$0.800
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,637.000
|
$0.750
|
$1.410
|
$1.250
|
$1.150
|
$0.890
|
$1.100
|
$0.500
|
$0.800
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
1,463.000
|
$0.660
|
$0.500
|
$0.450
|
$0.500
|
$0.500
|
$0.450
|
$0.500
|
$0.500
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,592.000
|
$0.580
|
$0.600
|
$0.910
|
$1.050
|
$1.000
|
$0.850
|
$1.000
|
$0.650
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
1,650.000
|
$0.300
|
$0.290
|
$0.440
|
$0.500
|
$0.490
|
$0.450
|
$0.500
|
$0.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
98,305.000
|
$0.250
|
$0.290
|
$0.380
|
$0.500
|
$0.420
|
$0.400
|
$0.400
|
$0.300
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
8,703.000
|
$0.270
|
$0.310
|
$0.420
|
$0.500
|
$0.470
|
$0.450
|
$0.450
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
35,153.000
|
$0.260
|
$0.290
|
$0.400
|
$0.500
|
$0.440
|
$0.400
|
$0.450
|
$0.300
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$157.000
|
$220.000
|
$202.000
|
$250.000
|
$222.000
|
$244.000
|
$215.000
|
$238.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$340.000
|
$600.000
|
$454.500
|
$550.000
|
$499.500
|
$410.000
|
$475.000
|
$650.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
4.000
|
$201.000
|
$275.000
|
$252.500
|
$300.000
|
$277.500
|
$258.000
|
$215.000
|
$298.000
|
|
PREFAB PAV MRK TY C (Y) (24") (SLD)
|
LF
|
448.000
|
$13.000
|
$10.000
|
$12.120
|
$15.000
|
$13.320
|
$12.000
|
$12.500
|
$10.800
|
|
REFL PAV MRKR TY I-C
|
EA
|
136.000
|
$3.000
|
$4.500
|
$4.040
|
$5.000
|
$4.440
|
$4.450
|
$4.200
|
$4.850
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,165.000
|
$3.000
|
$4.500
|
$4.040
|
$5.000
|
$4.440
|
$3.350
|
$4.200
|
$4.850
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,250.000
|
$1.000
|
$0.500
|
$0.860
|
$1.500
|
$0.830
|
$0.900
|
$1.250
|
$0.950
|
|
|
D-GR HMA TY-B SAC-B PG70-22
|
TON
|
3,445.750
|
$70.000
|
$67.230
|
$79.670
|
$85.000
|
$100.800
|
$88.000
|
$95.500
|
$94.350
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
26,496.460
|
$70.000
|
$71.310
|
$84.430
|
$93.000
|
$96.920
|
$96.000
|
$100.000
|
$97.300
|
|
|
TACK COAT
|
GAL
|
4,673.580
|
$3.000
|
$2.960
|
$3.400
|
$3.500
|
$4.230
|
$3.250
|
$3.150
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,000.000
|
$6,000.000
|
$14,948.000
|
$13,600.000
|
$7,215.000
|
$20,000.000
|
$3,500.000
|
$7,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
53.000
|
$200.000
|
$200.000
|
$212.000
|
$270.000
|
$333.000
|
$10.000
|
$250.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
640.000
|
$75.000
|
$70.000
|
$45.000
|
$54.000
|
$83.250
|
$10.000
|
$20.000
|
$55.000
|
|
Totals: |
$5,718,658.020
|
$4,992,797.801
|
$5,437,652.943
|
$5,949,871.835
|
$5,965,113.204
|
$5,986,643.952
|
$6,014,253.240
|
$6,205,543.608
|