PREPARING ROW
|
STA
|
6.000
|
$2,000.000
|
$3,200.000
|
$490.000
|
$10,000.000
|
$18,000.000
|
$9,000.000
|
$5,000.000
|
$3,050.000
|
$4,162.530
|
|
|
|
PREPARING ROW (TREE) (0" TO 6" DIA)
|
EA
|
123.000
|
$250.000
|
$100.000
|
$42.000
|
$400.000
|
$50.000
|
$268.000
|
$250.000
|
$60.000
|
$204.250
|
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
16.000
|
$1,250.000
|
$500.000
|
$42.000
|
$1,800.000
|
$200.000
|
$650.000
|
$1,000.000
|
$560.000
|
$936.570
|
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
1.000
|
$1,250.000
|
$1,500.000
|
$42.000
|
$2,200.000
|
$800.000
|
$1,500.000
|
$2,081.300
|
$2,475.000
|
$5,130.000
|
|
|
|
PREPARING ROW (HAND CLEARING)
|
AC
|
0.400
|
$2,500.000
|
$2,000.000
|
$22,000.000
|
$100,000.000
|
$5,000.000
|
$22,700.000
|
$12,000.000
|
$12,000.000
|
$30,375.000
|
|
|
|
PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
1.000
|
$5,000.000
|
$2,500.000
|
$42.000
|
$2,600.000
|
$1,500.000
|
$2,900.000
|
$5,000.000
|
$5,000.000
|
$7,695.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
408.000
|
$12.000
|
$8.000
|
$50.000
|
$20.000
|
$12.000
|
$13.700
|
$30.000
|
$15.500
|
$53.960
|
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
26.000
|
$20.000
|
$25.000
|
$511.000
|
$20.000
|
$12.000
|
$94.000
|
$30.000
|
$26.000
|
$54.000
|
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-12")
|
SY
|
337.000
|
$10.000
|
$28.000
|
$35.000
|
$20.000
|
$30.000
|
$35.000
|
$32.000
|
$24.000
|
$45.510
|
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
536.000
|
$25.000
|
$15.000
|
$35.000
|
$30.000
|
$25.000
|
$18.500
|
$35.000
|
$40.300
|
$40.320
|
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
126.000
|
$50.000
|
$35.000
|
$45.000
|
$100.000
|
$50.000
|
$165.000
|
$50.000
|
$54.700
|
$54.000
|
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
0.880
|
$2,500.000
|
$1,900.000
|
$1,820.000
|
$2,400.000
|
$3,000.000
|
$2,185.000
|
$2,025.000
|
$3,700.000
|
$2,788.980
|
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
0.880
|
$2,500.000
|
$1,900.000
|
$1,750.000
|
$2,400.000
|
$3,000.000
|
$2,185.000
|
$1,965.000
|
$3,700.000
|
$2,684.670
|
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
2,055.000
|
$4.000
|
$1.500
|
$2.000
|
$3.000
|
$2.500
|
$2.150
|
$1.500
|
$5.000
|
$1.760
|
|
|
|
D-GR HMA(SQ) TY-C PG70-28
|
TON
|
166.000
|
$600.000
|
$210.000
|
$230.000
|
$250.000
|
$240.000
|
$352.000
|
$360.000
|
$315.000
|
$303.750
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
750.000
|
$10.000
|
$12.500
|
$27.000
|
$12.000
|
$10.000
|
$25.000
|
$20.000
|
$13.150
|
$17.390
|
|
|
|
CEM STABIL BKFL
|
CY
|
108.000
|
$160.000
|
$225.000
|
$172.000
|
$300.000
|
$200.000
|
$260.000
|
$250.000
|
$200.000
|
$267.520
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,508.000
|
$9.010
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
TEMPORARY SPL SHORING (SOIL NAIL)
|
SF
|
548.000
|
$40.000
|
$35.000
|
$72.000
|
$40.000
|
$20.000
|
$80.000
|
$60.000
|
$62.000
|
$105.940
|
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
3,690.000
|
$70.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
51.300
|
$1,000.000
|
$960.000
|
$1,598.000
|
$1,200.000
|
$1,800.000
|
$1,750.000
|
$1,600.000
|
$1,450.000
|
$1,059.500
|
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
59.200
|
$1,200.000
|
$1,075.000
|
$1,710.000
|
$1,200.000
|
$1,800.000
|
$1,450.000
|
$1,800.000
|
$1,630.000
|
$1,909.890
|
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
37.800
|
$1,500.000
|
$1,125.000
|
$652.000
|
$1,300.000
|
$1,000.000
|
$1,300.000
|
$1,800.000
|
$1,100.000
|
$1,914.350
|
|
|
|
CL C CONC (FOOTING)(HPC)
|
CY
|
75.000
|
$700.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
$0.000
|
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
11,172.000
|
$30.000
|
$20.250
|
$34.000
|
$28.000
|
$32.000
|
$27.500
|
$28.000
|
$32.050
|
$21.550
|
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
2,280.000
|
$20.000
|
$12.450
|
$14.000
|
$26.000
|
$10.000
|
$9.000
|
$52.000
|
$13.000
|
$8.440
|
|
|
|
APPROACH SLAB (HPC)
|
CY
|
76.500
|
$680.000
|
$675.000
|
$850.000
|
$600.000
|
$700.000
|
$600.000
|
$600.000
|
$625.000
|
$652.970
|
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
1,572.000
|
$200.000
|
$185.000
|
$151.000
|
$180.000
|
$175.000
|
$177.750
|
$200.000
|
$185.000
|
$291.580
|
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
122.000
|
$576.000
|
$500.000
|
$367.000
|
$500.000
|
$650.000
|
$600.000
|
$500.000
|
$600.000
|
$730.400
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$500.000
|
$450.000
|
$367.000
|
$500.000
|
$650.000
|
$660.000
|
$475.000
|
$1,000.000
|
$797.760
|
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
237.000
|
$7.000
|
$35.000
|
$10.000
|
$30.000
|
$12.000
|
$16.500
|
$30.000
|
$35.250
|
$4.650
|
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
288.000
|
$114.000
|
$110.000
|
$83.000
|
$110.000
|
$100.000
|
$125.000
|
$150.000
|
$110.000
|
$119.100
|
|
|
|
RAIL (TY C223)(HPC)
|
LF
|
288.000
|
$140.000
|
$155.000
|
$108.000
|
$165.000
|
$150.000
|
$200.000
|
$150.000
|
$150.000
|
$175.640
|
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
105.000
|
$130.000
|
$95.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$120.000
|
$145.000
|
$115.730
|
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$95,000.000
|
$125,000.000
|
$225,000.000
|
$120,000.000
|
$176,000.000
|
$126,000.000
|
$175,000.000
|
$155,000.000
|
$142,425.000
|
|
|
|
REMOVE STR (RAIL)
|
LF
|
47.000
|
$25.000
|
$40.000
|
$145.000
|
$20.000
|
$100.000
|
$40.000
|
$150.000
|
$120.000
|
$66.070
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$174,700.000
|
$200,000.000
|
$180,000.000
|
$205,000.000
|
$220,000.000
|
$240,000.000
|
$250,000.000
|
$280,000.000
|
$349,515.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
17.000
|
$10,000.000
|
$8,550.000
|
$2,000.000
|
$6,000.000
|
$3,000.000
|
$4,000.000
|
$4,000.000
|
$17,740.000
|
$2,519.350
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
392.000
|
$4.200
|
$3.000
|
$5.000
|
$4.000
|
$3.500
|
$3.000
|
$4.000
|
$4.500
|
$4.150
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
392.000
|
$1.500
|
$1.000
|
$1.000
|
$2.000
|
$1.000
|
$0.750
|
$1.000
|
$3.000
|
$1.350
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
521.000
|
$7.500
|
$3.000
|
$6.000
|
$12.000
|
$6.000
|
$4.500
|
$4.000
|
$9.150
|
$6.750
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
521.000
|
$2.000
|
$1.000
|
$1.000
|
$2.000
|
$1.000
|
$0.750
|
$1.000
|
$2.250
|
$1.350
|
|
|
|
CONSTRUCTING DETOURS
|
SY
|
384.000
|
$150.000
|
$195.000
|
$125.000
|
$80.000
|
$100.000
|
$263.000
|
$265.000
|
$111.000
|
$109.000
|
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
720.000
|
$15.000
|
$18.000
|
$35.000
|
$30.000
|
$15.000
|
$16.250
|
$22.000
|
$14.000
|
$33.400
|
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
660.000
|
$10.000
|
$14.000
|
$6.000
|
$20.000
|
$8.000
|
$12.500
|
$17.500
|
$13.000
|
$6.360
|
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
720.000
|
$10.300
|
$18.000
|
$8.000
|
$30.000
|
$12.000
|
$13.750
|
$22.000
|
$14.000
|
$33.400
|
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
124.000
|
$30.000
|
$32.000
|
$27.000
|
$20.000
|
$35.000
|
$41.000
|
$40.000
|
$31.100
|
$40.500
|
|
|
|
CONC SIDEWALKS (4")
|
SY
|
109.000
|
$100.000
|
$38.000
|
$55.000
|
$60.000
|
$70.000
|
$78.000
|
$65.000
|
$67.150
|
$87.750
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
150.000
|
$27.000
|
$22.000
|
$20.000
|
$30.000
|
$24.000
|
$20.000
|
$30.000
|
$26.350
|
$27.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,149.000
|
$1,650.000
|
$1,440.000
|
$2,000.000
|
$1,600.000
|
$2,200.000
|
$2,300.000
|
$2,215.000
|
$1,944.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$3.250
|
$2.000
|
$55.000
|
$5.000
|
$2.000
|
$1.750
|
$4.500
|
$4.250
|
$2.370
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
3.000
|
$287.000
|
$250.000
|
$150.000
|
$500.000
|
$200.000
|
$200.000
|
$450.000
|
$425.000
|
$202.500
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,675.000
|
$2,200.000
|
$1,995.000
|
$2,600.000
|
$2,500.000
|
$2,000.000
|
$2,985.000
|
$3,000.000
|
$2,693.250
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$620.000
|
$900.000
|
$560.000
|
$1,000.000
|
$400.000
|
$650.000
|
$1,140.000
|
$1,055.000
|
$1,080.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
1.000
|
$475.000
|
$900.000
|
$610.000
|
$1,000.000
|
$350.000
|
$700.000
|
$1,250.000
|
$1,160.000
|
$1,080.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$850.000
|
$900.000
|
$555.000
|
$1,000.000
|
$250.000
|
$700.000
|
$1,275.000
|
$1,215.000
|
$1,080.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
3.000
|
$750.000
|
$1,200.000
|
$775.000
|
$1,200.000
|
$500.000
|
$800.000
|
$1,316.000
|
$1,265.000
|
$1,080.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$900.000
|
$890.000
|
$1,200.000
|
$380.000
|
$1,050.000
|
$1,325.000
|
$1,265.000
|
$1,080.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$120.000
|
$350.000
|
$70.000
|
$200.000
|
$50.000
|
$100.000
|
$200.000
|
$130.000
|
$135.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$60.000
|
$25.000
|
$20.000
|
$60.000
|
$20.000
|
$18.000
|
$40.000
|
$26.350
|
$67.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
6.000
|
$60.000
|
$25.000
|
$20.000
|
$60.000
|
$20.000
|
$18.000
|
$40.000
|
$26.350
|
$67.500
|
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
5.000
|
$15.000
|
$25.000
|
$2.000
|
$20.000
|
$2.500
|
$2.000
|
$23.500
|
$10.000
|
$67.500
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$60.000
|
$25.000
|
$25.000
|
$60.000
|
$25.000
|
$21.000
|
$54.000
|
$42.000
|
$67.500
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,165.000
|
$1.000
|
$3.750
|
$4.000
|
$1.000
|
$3.500
|
$3.250
|
$1.500
|
$3.450
|
$2.700
|
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$30.000
|
$28.000
|
$25.000
|
$20.000
|
$28.000
|
$25.000
|
$25.000
|
$26.350
|
$22.510
|
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,141.000
|
$1.000
|
$1.100
|
$1.000
|
$0.300
|
$1.200
|
$1.000
|
$1.100
|
$1.050
|
$2.660
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
1,121.000
|
$1.000
|
$2.200
|
$2.000
|
$0.600
|
$2.400
|
$2.000
|
$2.200
|
$2.100
|
$2.700
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
1,462.000
|
$1.000
|
$2.200
|
$2.000
|
$0.600
|
$2.400
|
$2.000
|
$2.200
|
$2.100
|
$2.700
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
840.000
|
$1.000
|
$5.500
|
$5.000
|
$1.000
|
$6.000
|
$5.000
|
$5.500
|
$5.250
|
$2.700
|
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,141.000
|
$0.800
|
$3.300
|
$3.000
|
$0.300
|
$3.500
|
$3.000
|
$3.300
|
$3.150
|
$2.700
|
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$60,000.000
|
$45,000.000
|
$28,000.000
|
$40,000.000
|
$48,000.000
|
$60,000.000
|
$60,000.000
|
$100,600.000
|
$73,035.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$18,000.000
|
$15,000.000
|
$6,000.000
|
$10,000.000
|
$15,000.000
|
$12,000.000
|
$15,500.000
|
$24,375.000
|
$20,250.000
|
|
1
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,244.000
|
$268.000
|
$210.000
|
$207.000
|
$200.000
|
$240.000
|
$252.000
|
$240.000
|
$290.000
|
$348.760
|
|
Totals: |
$2,728,601.780
|
$2,093,931.750
|
$2,168,659.600
|
$2,297,340.400
|
$2,356,358.400
|
$2,447,932.450
|
$2,640,000.000
|
$2,802,854.850
|
$2,819,391.475
|