|
|
PREPARING ROW
|
STA
|
83.000
|
$2,300.000
|
$341.000
|
$500.000
|
$850.000
|
$250.000
|
$1,500.000
|
$412.120
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
205.000
|
$12.000
|
$13.000
|
$25.000
|
$33.000
|
$35.000
|
$10.000
|
$180.650
|
|
|
REMOVING CONC (CURB)
|
LF
|
22.000
|
$6.000
|
$27.000
|
$25.000
|
$26.000
|
$50.000
|
$30.000
|
$198.140
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
103.000
|
$12.500
|
$10.000
|
$25.000
|
$20.000
|
$20.000
|
$12.000
|
$63.040
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
509.000
|
$17.000
|
$22.000
|
$15.000
|
$30.000
|
$25.000
|
$85.000
|
$30.340
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
14,499.000
|
$0.650
|
$0.500
|
$1.000
|
$1.000
|
$3.150
|
$1.000
|
$1.990
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
14,499.000
|
$0.150
|
$0.150
|
$0.140
|
$0.150
|
$0.150
|
$0.250
|
$0.350
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
7,251.000
|
$0.150
|
$0.130
|
$0.120
|
$0.120
|
$0.130
|
$0.250
|
$0.290
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
7,251.000
|
$0.150
|
$0.130
|
$0.120
|
$0.120
|
$0.130
|
$0.250
|
$0.290
|
|
|
VEGETATIVE WATERING
|
MG
|
145.000
|
$12.000
|
$17.000
|
$15.000
|
$19.000
|
$120.000
|
$16.000
|
$31.050
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
157.000
|
$6.000
|
$6.380
|
$7.000
|
$8.000
|
$6.700
|
$9.000
|
$10.560
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
31,273.000
|
$11.000
|
$8.700
|
$12.500
|
$12.800
|
$13.500
|
$12.250
|
$19.600
|
|
|
REWORK BS MATL (TY B)(10")(OC)
|
SY
|
22,400.000
|
$2.500
|
$2.180
|
$3.000
|
$1.100
|
$5.000
|
$2.500
|
$6.050
|
|
|
CEMENT
|
TON
|
476.000
|
$138.000
|
$148.000
|
$150.000
|
$165.000
|
$145.000
|
$140.000
|
$183.340
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
31,273.000
|
$4.000
|
$1.300
|
$3.000
|
$3.800
|
$2.500
|
$2.500
|
$3.550
|
|
|
ASPH (RC-250)
|
GAL
|
6,945.000
|
$4.000
|
$3.400
|
$4.000
|
$5.000
|
$4.500
|
$4.300
|
$5.370
|
|
|
ASPH (SPG 73-19)
|
GAL
|
21,112.000
|
$3.000
|
$2.840
|
$3.500
|
$3.400
|
$4.250
|
$3.000
|
$5.330
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
206.000
|
$98.000
|
$115.000
|
$150.000
|
$160.000
|
$120.000
|
$220.000
|
$160.240
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
446.000
|
$100.000
|
$137.500
|
$150.000
|
$140.000
|
$160.000
|
$170.000
|
$166.250
|
|
|
PLANE ASPH CONC PAV (5"-7")
|
SY
|
21,750.000
|
$5.000
|
$1.780
|
$5.000
|
$4.000
|
$4.320
|
$4.000
|
$2.690
|
|
|
CEM STABIL BKFL
|
CY
|
246.000
|
$75.000
|
$197.000
|
$150.000
|
$180.000
|
$131.000
|
$125.000
|
$123.410
|
|
|
CUT & RESTORING PAV
|
SY
|
125.000
|
$75.000
|
$9.500
|
$75.000
|
$50.000
|
$158.000
|
$150.000
|
$88.680
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
85.000
|
$4.500
|
$6.400
|
$15.000
|
$12.000
|
$12.630
|
$12.000
|
$30.200
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,424.000
|
$13.000
|
$17.000
|
$30.000
|
$48.000
|
$36.840
|
$35.000
|
$32.570
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
15.000
|
$350.000
|
$479.000
|
$500.000
|
$710.000
|
$473.000
|
$450.000
|
$420.910
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
35.000
|
$400.000
|
$444.000
|
$500.000
|
$650.000
|
$526.000
|
$500.000
|
$727.880
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
4.000
|
$850.000
|
$2,013.000
|
$2,500.000
|
$2,400.000
|
$2,105.000
|
$2,000.000
|
$1,226.480
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
712.000
|
$70.000
|
$50.000
|
$60.000
|
$80.000
|
$52.630
|
$50.000
|
$91.980
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
256.000
|
$70.000
|
$70.200
|
$80.000
|
$90.000
|
$98.950
|
$94.000
|
$128.990
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
96.000
|
$160.000
|
$179.750
|
$200.000
|
$240.000
|
$263.000
|
$250.000
|
$340.020
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$5,500.000
|
$6,876.000
|
$8,000.000
|
$13,000.000
|
$10,500.000
|
$10,000.000
|
$10,297.030
|
|
|
SET (TY I)(S= 8 FT)(HW= 9 FT)(3:1) (C)
|
EA
|
4.000
|
$15,000.000
|
$13,312.000
|
$20,000.000
|
$17,000.000
|
$16,840.000
|
$16,000.000
|
$15,943.210
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
42.000
|
$700.000
|
$1,390.000
|
$1,100.000
|
$750.000
|
$789.000
|
$750.000
|
$1,224.950
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$850.000
|
$1,315.000
|
$1,250.000
|
$750.000
|
$842.000
|
$800.000
|
$1,439.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,100.000
|
$1,612.000
|
$1,500.000
|
$800.000
|
$868.000
|
$825.000
|
$1,439.810
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,150.000
|
$2,344.000
|
$2,500.000
|
$3,700.000
|
$1,578.000
|
$1,500.000
|
$2,920.680
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$352.000
|
$660.000
|
$500.000
|
$500.000
|
$1,052.000
|
$1,000.000
|
$1,531.300
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$2,500.000
|
$1,100.000
|
$2,500.000
|
$2,000.000
|
$1,578.000
|
$1,500.000
|
$1,564.550
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$1,600.000
|
$1,100.000
|
$1,000.000
|
$2,000.000
|
$1,578.000
|
$1,500.000
|
$1,564.550
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
5.000
|
$45.000
|
$670.000
|
$300.000
|
$350.000
|
$210.000
|
$200.000
|
$1,264.940
|
|
|
REMOV STR (PIPE)
|
EA
|
27.000
|
$396.000
|
$156.000
|
$350.000
|
$500.000
|
$736.000
|
$700.000
|
$900.050
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$150,700.000
|
$137,700.000
|
$200,000.000
|
$220,000.000
|
$125,000.000
|
$251,500.000
|
$410,806.430
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$5,000.000
|
$3,100.000
|
$6,500.000
|
$9,000.000
|
$10,000.000
|
$16,000.000
|
$3,438.300
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
720.000
|
$34.000
|
$26.590
|
$25.000
|
$32.000
|
$27.700
|
$30.000
|
$33.140
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
720.000
|
$10.000
|
$9.500
|
$5.000
|
$6.000
|
$10.000
|
$8.000
|
$8.940
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,092.000
|
$3.500
|
$2.000
|
$3.000
|
$3.500
|
$2.170
|
$3.000
|
$3.330
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,092.000
|
$1.000
|
$0.800
|
$0.600
|
$0.750
|
$0.830
|
$1.000
|
$1.130
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
15.000
|
$4.000
|
$5.320
|
$30.000
|
$16.000
|
$10.000
|
$12.000
|
$17.950
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
15.000
|
$1.000
|
$1.000
|
$10.000
|
$12.000
|
$2.000
|
$7.000
|
$12.450
|
|
|
DRIVEWAYS (CONC)
|
SY
|
160.000
|
$74.000
|
$100.000
|
$100.000
|
$125.000
|
$120.000
|
$120.000
|
$88.390
|
|
|
DRIVEWAYS (ACP)
|
SY
|
976.000
|
$15.000
|
$31.500
|
$35.000
|
$31.000
|
$30.000
|
$32.000
|
$56.370
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
557.000
|
$8.000
|
$48.300
|
$25.000
|
$41.000
|
$30.000
|
$45.000
|
$32.030
|
|
|
TURNOUTS (ACP)
|
SY
|
122.000
|
$38.000
|
$150.000
|
$35.000
|
$39.000
|
$30.000
|
$20.000
|
$105.930
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
275.000
|
$20.000
|
$21.270
|
$30.000
|
$22.000
|
$23.000
|
$18.000
|
$55.380
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,500.000
|
$2,500.000
|
$2,600.000
|
$2,900.000
|
$2,475.000
|
$2,776.050
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
6.000
|
$200.000
|
$212.000
|
$200.000
|
$220.000
|
$162.000
|
$185.000
|
$250.570
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$600.000
|
$531.800
|
$500.000
|
$550.000
|
$546.000
|
$450.000
|
$718.490
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
32.000
|
$567.000
|
$425.500
|
$400.000
|
$510.000
|
$528.000
|
$400.000
|
$461.960
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
7.000
|
$592.000
|
$479.000
|
$450.000
|
$500.000
|
$542.000
|
$500.000
|
$562.690
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$725.000
|
$585.000
|
$550.000
|
$610.000
|
$603.000
|
$500.000
|
$704.810
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$720.000
|
$585.000
|
$550.000
|
$610.000
|
$550.000
|
$550.000
|
$675.110
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$765.000
|
$585.000
|
$550.000
|
$610.000
|
$727.000
|
$700.000
|
$701.100
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$970.000
|
$900.000
|
$900.000
|
$940.000
|
$850.000
|
$700.000
|
$870.850
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$400.000
|
$425.000
|
$400.000
|
$450.000
|
$378.000
|
$300.000
|
$464.600
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
47.000
|
$91.000
|
$80.000
|
$75.000
|
$83.000
|
$163.000
|
$47.000
|
$104.520
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
7.000
|
$25.000
|
$26.600
|
$30.000
|
$28.000
|
$40.000
|
$25.000
|
$42.390
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
14.000
|
$63.000
|
$80.000
|
$100.000
|
$83.000
|
$59.000
|
$75.000
|
$78.940
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
10.000
|
$13.000
|
$53.000
|
$50.000
|
$60.000
|
$37.000
|
$15.050
|
$15.920
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
174.000
|
$1.000
|
$1.000
|
$1.000
|
$0.700
|
$2.500
|
$1.000
|
$5.140
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,682.000
|
$1.000
|
$1.000
|
$1.000
|
$0.700
|
$2.500
|
$1.000
|
$1.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
163.000
|
$1.000
|
$1.120
|
$2.000
|
$1.150
|
$0.750
|
$1.050
|
$3.390
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
44.000
|
$3.300
|
$6.380
|
$6.000
|
$7.000
|
$3.150
|
$6.000
|
$7.870
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
110.000
|
$5.000
|
$12.230
|
$12.000
|
$13.000
|
$6.500
|
$11.500
|
$7.550
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
|
LF
|
159,857.000
|
$0.500
|
$0.580
|
$0.600
|
$0.600
|
$0.600
|
$0.550
|
$0.700
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
196,016.000
|
$0.550
|
$0.580
|
$0.600
|
$0.600
|
$0.620
|
$0.550
|
$0.700
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
22,109.000
|
$0.500
|
$0.580
|
$0.600
|
$0.600
|
$0.620
|
$0.550
|
$0.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,394.000
|
$0.300
|
$0.370
|
$0.350
|
$0.400
|
$0.400
|
$0.350
|
$0.490
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
342.000
|
$0.300
|
$0.370
|
$0.350
|
$0.400
|
$0.400
|
$0.350
|
$0.770
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
2,253.000
|
$0.300
|
$0.370
|
$0.350
|
$0.400
|
$0.400
|
$0.350
|
$0.510
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
9,753.000
|
$0.600
|
$0.620
|
$0.600
|
$0.650
|
$0.720
|
$0.580
|
$0.890
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
1,178.000
|
$0.750
|
$0.620
|
$0.600
|
$0.650
|
$0.720
|
$0.580
|
$1.190
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
7,376.000
|
$0.650
|
$0.620
|
$0.600
|
$0.650
|
$0.720
|
$0.580
|
$0.890
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
1.000
|
$185.000
|
$320.000
|
$300.000
|
$350.000
|
$210.000
|
$300.000
|
$348.410
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$240.000
|
$351.000
|
$350.000
|
$360.000
|
$500.000
|
$330.000
|
$278.940
|
|
REFL PAV MRKR TY I-C
|
EA
|
9.000
|
$3.000
|
$5.320
|
$10.000
|
$6.000
|
$5.260
|
$5.000
|
$33.580
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
5,551.000
|
$3.000
|
$3.670
|
$3.500
|
$4.000
|
$3.320
|
$3.450
|
$3.680
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$4,000.000
|
$2,403.000
|
$7,500.000
|
$8,500.000
|
$5,000.000
|
$7,945.000
|
$2,912.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$6,500.000
|
$2,130.000
|
$5,000.000
|
$10,000.000
|
$12,000.000
|
$20,000.000
|
$4,426.050
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
15,577.000
|
$3.800
|
$4.360
|
$4.500
|
$4.200
|
$6.000
|
$4.100
|
$8.180
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$8,000.000
|
$2,100.000
|
$5,500.000
|
$10,000.000
|
$25,000.000
|
$12,000.000
|
$6,102.100
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
22.000
|
$270.000
|
$400.000
|
$350.000
|
$200.000
|
$1,000.000
|
$600.000
|
$884.740
|
|
Totals: |
$2,034,388.500
|
$1,723,096.580
|
$2,187,523.350
|
$2,331,643.090
|
$2,355,134.680
|
$2,425,970.110
|
$3,002,852.050
|