PREPARING ROW
|
STA
|
11.000
|
$4,000.000
|
$5,000.000
|
$1,000.000
|
$48,000.000
|
$51,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
98.000
|
$60.000
|
$7.000
|
$300.000
|
$190.000
|
$175.000
|
|
|
REMOVE STAB BASE & ASPH PAV (13"-18")
|
SY
|
1,152.000
|
$15.000
|
$20.000
|
$30.000
|
$28.000
|
$22.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
549.000
|
$25.000
|
$15.000
|
$50.000
|
$50.000
|
$42.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,018.000
|
$60.000
|
$16.000
|
$40.000
|
$50.000
|
$45.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
7,177.000
|
$3.500
|
$4.000
|
$6.000
|
$2.500
|
$0.470
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
7,177.000
|
$1.000
|
$0.900
|
$0.570
|
$0.540
|
$0.540
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
3,589.000
|
$0.850
|
$3.000
|
$0.570
|
$0.540
|
$0.540
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
3,589.000
|
$0.850
|
$4.000
|
$0.570
|
$0.540
|
$0.540
|
|
|
VEGETATIVE WATERING
|
MG
|
215.300
|
$50.000
|
$42.000
|
$5.000
|
$24.000
|
$26.580
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,824.000
|
$2.500
|
$4.000
|
$1.300
|
$1.250
|
$1.250
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
1,731.000
|
$35.000
|
$46.000
|
$45.000
|
$41.000
|
$72.860
|
|
|
CEMENT
|
TON
|
32.000
|
$260.000
|
$312.000
|
$305.000
|
$289.000
|
$344.310
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
1,731.000
|
$4.000
|
$8.000
|
$16.000
|
$23.000
|
$27.490
|
|
|
ASPH (AC-10-2TR)
|
GAL
|
953.000
|
$7.500
|
$9.500
|
$16.000
|
$9.000
|
$9.000
|
|
|
ASPH (RC-250)
|
GAL
|
433.000
|
$25.000
|
$24.500
|
$16.000
|
$23.000
|
$24.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
20.000
|
$180.000
|
$565.000
|
$2,500.000
|
$1,200.000
|
$560.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
13.000
|
$300.000
|
$1,500.000
|
$2,500.000
|
$1,600.000
|
$1,465.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,496.000
|
$6.000
|
$11.000
|
$12.000
|
$15.000
|
$3.800
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
253.000
|
$4.000
|
$20.000
|
$22.000
|
$15.000
|
$3.800
|
|
|
CEM STABIL BKFL
|
CY
|
285.000
|
$200.000
|
$272.000
|
$300.000
|
$270.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
476.000
|
$12.000
|
$2.000
|
$25.000
|
$10.000
|
$150.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
408.000
|
$40.000
|
$10.000
|
$250.000
|
$125.000
|
$175.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
120.000
|
$222.000
|
$90.000
|
$300.000
|
$165.000
|
$110.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,627.000
|
$350.000
|
$340.000
|
$275.000
|
$341.000
|
$300.000
|
|
|
CL C CONC (ABUT)
|
CY
|
77.600
|
$1,500.000
|
$1,535.000
|
$2,250.000
|
$2,000.000
|
$1,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
129.000
|
$2,000.000
|
$1,999.000
|
$2,750.000
|
$2,300.000
|
$1,750.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
76.500
|
$2,000.000
|
$2,762.000
|
$1,750.000
|
$2,300.000
|
$2,000.000
|
|
|
REINF CONC SLAB
|
SF
|
26,970.000
|
$30.000
|
$25.000
|
$35.000
|
$32.000
|
$45.500
|
|
|
APPROACH SLAB
|
CY
|
84.000
|
$1,000.000
|
$876.000
|
$1,700.000
|
$800.000
|
$725.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
3,234.000
|
$250.000
|
$204.000
|
$195.000
|
$200.000
|
$220.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,125.000
|
$200.000
|
$190.000
|
$120.000
|
$165.000
|
$200.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
53.000
|
$650.000
|
$450.000
|
$800.000
|
$750.000
|
$660.000
|
|
|
RAIL (TY T223)
|
LF
|
1,010.000
|
$175.000
|
$117.000
|
$180.000
|
$140.000
|
$110.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
174.000
|
$220.000
|
$169.000
|
$200.000
|
$230.000
|
$223.400
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$80,000.000
|
$165,421.000
|
$200,000.000
|
$135,000.000
|
$296,165.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$465,851.640
|
$495,000.000
|
$575,000.000
|
$550,000.000
|
$656,871.810
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$3,000.000
|
$3,500.000
|
$15,000.000
|
$10,000.000
|
$4,616.030
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
52.000
|
$40.000
|
$40.000
|
$40.000
|
$38.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
52.000
|
$12.000
|
$2.000
|
$13.000
|
$12.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
240.000
|
$30.000
|
$30.000
|
$10.000
|
$35.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
240.000
|
$20.000
|
$2.000
|
$5.000
|
$14.000
|
$14.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
551.000
|
$2.500
|
$3.000
|
$4.000
|
$3.500
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,038.000
|
$5.000
|
$4.000
|
$4.500
|
$4.250
|
$4.250
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,038.000
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
9.000
|
$4,000.000
|
$3,705.000
|
$5,000.000
|
$4,500.000
|
$3,500.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
1,170.000
|
$70.000
|
$96.000
|
$100.000
|
$48.000
|
$67.560
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,110.000
|
$10.000
|
$3.000
|
$15.000
|
$22.000
|
$3.830
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
1,170.000
|
$15.000
|
$9.000
|
$25.000
|
$27.000
|
$11.380
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
1,070.000
|
$0.300
|
$7.000
|
$7.000
|
$4.000
|
$1.230
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
535.000
|
$0.400
|
$7.000
|
$7.000
|
$8.000
|
$2.450
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,025.000
|
$31.000
|
$26.000
|
$22.000
|
$24.000
|
$23.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,300.000
|
$2,284.000
|
$1,800.000
|
$2,500.000
|
$2,050.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
2.000
|
$725.000
|
$1,031.000
|
$1,130.000
|
$930.000
|
$925.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,225.000
|
$3.500
|
$3.000
|
$3.150
|
$2.500
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,300.000
|
$3,120.000
|
$2,992.500
|
$2,800.000
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$300.000
|
$223.000
|
$315.000
|
$200.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$1,200.000
|
$2,061.000
|
$1,100.000
|
$1,000.000
|
$1,850.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,200.000
|
$1,003.000
|
$2,100.000
|
$700.000
|
$900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,805.000
|
$10,000.000
|
$7,500.000
|
$8,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$825.000
|
$656.710
|
$945.000
|
$600.000
|
$625.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$125.000
|
$111.000
|
$157.500
|
$100.000
|
$85.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$30.000
|
$35.000
|
$26.250
|
$25.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$50.000
|
$7.000
|
$33.600
|
$35.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
3,112.000
|
$0.500
|
$1.000
|
$1.220
|
$1.100
|
$1.050
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
2,519.000
|
$0.500
|
$1.000
|
$1.220
|
$1.100
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
1,599.000
|
$0.700
|
$2.000
|
$1.220
|
$1.100
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$10.000
|
$17.000
|
$23.250
|
$20.000
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
8,750.000
|
$1.000
|
$2.000
|
$1.220
|
$1.100
|
$1.050
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
104.000
|
$1.750
|
$2.000
|
$0.830
|
$1.000
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
19.000
|
$10.000
|
$28.000
|
$23.240
|
$20.000
|
$20.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
3,515.000
|
$0.300
|
$1.000
|
$0.580
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,807.000
|
$0.700
|
$2.000
|
$3.080
|
$2.700
|
$2.650
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,006.000
|
$0.850
|
$2.000
|
$0.870
|
$0.750
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
1,457.000
|
$0.800
|
$2.000
|
$1.160
|
$1.000
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
317.000
|
$6.000
|
$6.000
|
$3.490
|
$3.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,513.000
|
$1.000
|
$1.000
|
$1.450
|
$1.300
|
$1.250
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
3,515.000
|
$0.150
|
$0.050
|
$0.290
|
$0.250
|
$0.250
|
|
|
D-GR HMA TY-C PG64-22 (LEVEL-UP)
|
TON
|
28.000
|
$140.000
|
$404.000
|
$750.000
|
$400.000
|
$370.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
386.000
|
$140.000
|
$350.000
|
$300.000
|
$270.000
|
$333.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
231.000
|
$130.000
|
$380.000
|
$450.000
|
$250.000
|
$361.400
|
|
|
BONDING COURSE
|
GAL
|
525.000
|
$6.000
|
$21.500
|
$8.000
|
$10.000
|
$20.500
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$500.000
|
$387.000
|
$2,500.000
|
$300.000
|
$750.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$16,000.000
|
$20,000.000
|
$10,000.000
|
$8,767.050
|
|
|
TMA (STATIONARY)
|
DAY
|
267.000
|
$250.000
|
$300.000
|
$300.000
|
$150.000
|
$838.450
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
24.000
|
$300.000
|
$500.000
|
$300.000
|
$150.000
|
$125.790
|
|
Totals: |
$5,009,226.090
|
$4,998,006.860
|
$5,792,653.610
|
$5,807,039.450
|
$6,568,710.004
|