REMOVING CONCRETE(MOW STRIP)
|
LF
|
840.000
|
$11.620
|
$16.000
|
$20.000
|
$16.000
|
$25.000
|
$13.620
|
$50.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
736.000
|
$145.000
|
$183.000
|
$80.000
|
$350.000
|
$210.000
|
$211.730
|
$250.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
42,642.000
|
$0.120
|
$0.130
|
$0.010
|
$0.170
|
$1.630
|
$0.130
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
6,343.000
|
$9.000
|
$0.010
|
$0.010
|
$20.500
|
$1.000
|
$40.720
|
$25.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
|
SY
|
12,014.000
|
$80.000
|
$82.000
|
$75.000
|
$85.500
|
$100.000
|
$100.910
|
$93.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
210,293.000
|
$2.000
|
$1.700
|
$1.100
|
$1.800
|
$2.150
|
$1.940
|
$4.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
100.000
|
$200.000
|
$210.000
|
$230.000
|
$220.000
|
$304.430
|
$254.240
|
$350.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
146.000
|
$475.000
|
$550.000
|
$470.000
|
$550.000
|
$680.330
|
$572.780
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$677,617.130
|
$405,374.000
|
$600,000.000
|
$500,000.000
|
$723,200.000
|
$380,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$8,500.000
|
$37,000.000
|
$3,000.000
|
$7,500.000
|
$40,000.000
|
$11,620.170
|
$8,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,274.000
|
$2.300
|
$2.050
|
$1.000
|
$1.900
|
$3.130
|
$2.240
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,274.000
|
$0.570
|
$0.720
|
$0.750
|
$0.450
|
$0.750
|
$0.780
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
600.000
|
$3.000
|
$4.650
|
$5.000
|
$5.000
|
$5.010
|
$5.100
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
600.000
|
$0.890
|
$0.820
|
$0.750
|
$1.000
|
$0.750
|
$0.900
|
$9.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
126,295.000
|
$0.130
|
$0.110
|
$0.100
|
$0.170
|
$0.100
|
$0.210
|
$0.150
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
63,298.000
|
$0.180
|
$0.110
|
$0.100
|
$0.220
|
$0.100
|
$0.230
|
$0.150
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,700.000
|
$21.000
|
$18.000
|
$17.000
|
$18.500
|
$16.900
|
$19.320
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
4.000
|
$1,200.000
|
$1,200.000
|
$1,125.000
|
$1,250.000
|
$1,125.000
|
$1,204.000
|
$1,850.000
|
|
|
SHORT RADIUS
|
LF
|
100.000
|
$33.000
|
$21.000
|
$20.000
|
$21.000
|
$19.600
|
$40.320
|
$30.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,175.000
|
$1,250.000
|
$1,160.000
|
$1,250.000
|
$1,160.000
|
$1,085.280
|
$1,850.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
2.000
|
$26.000
|
$925.000
|
$850.000
|
$900.000
|
$850.000
|
$1,568.000
|
$1,000.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
150.000
|
$55.000
|
$51.000
|
$50.000
|
$51.000
|
$47.000
|
$64.960
|
$50.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
EA
|
12.000
|
$1,671.670
|
$2,050.000
|
$1,525.000
|
$1,650.000
|
$1,525.000
|
$1,790.880
|
$2,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,275.000
|
$2.700
|
$1.900
|
$1.750
|
$1.900
|
$1.750
|
$2.800
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$200.000
|
$188.000
|
$175.000
|
$190.000
|
$175.000
|
$252.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
51.000
|
$2,600.000
|
$2,700.000
|
$2,500.000
|
$2,750.000
|
$2,480.000
|
$2,738.400
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
51.000
|
$270.000
|
$235.000
|
$220.000
|
$240.000
|
$220.000
|
$308.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
121.000
|
$476.000
|
$435.000
|
$500.000
|
$420.000
|
$487.000
|
$545.440
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
11.000
|
$600.000
|
$580.000
|
$600.000
|
$550.000
|
$579.000
|
$648.480
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$710.000
|
$720.000
|
$750.000
|
$700.000
|
$779.000
|
$872.480
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
8.000
|
$815.000
|
$950.000
|
$800.000
|
$950.000
|
$811.000
|
$908.320
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
13.000
|
$836.240
|
$1,000.000
|
$900.000
|
$960.000
|
$936.000
|
$1,048.320
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
24.000
|
$1,025.000
|
$865.000
|
$900.000
|
$840.000
|
$969.000
|
$1,085.280
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
172.000
|
$113.000
|
$79.000
|
$70.000
|
$78.000
|
$65.000
|
$72.800
|
$250.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
84.000
|
$95.000
|
$48.000
|
$50.000
|
$66.000
|
$45.500
|
$71.680
|
$100.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
84.000
|
$20.000
|
$10.850
|
$10.000
|
$15.500
|
$10.000
|
$16.800
|
$50.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
137.000
|
$33.000
|
$35.750
|
$30.000
|
$34.000
|
$33.000
|
$16.800
|
$100.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
18.000
|
$20.000
|
$21.000
|
$20.000
|
$16.000
|
$22.000
|
$16.800
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,000.000
|
$1.190
|
$1.050
|
$0.700
|
$2.000
|
$2.000
|
$1.610
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
18,916.000
|
$1.000
|
$1.050
|
$0.750
|
$2.000
|
$1.420
|
$1.610
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,583.000
|
$1.000
|
$0.790
|
$0.750
|
$0.800
|
$0.970
|
$0.840
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
500.000
|
$6.630
|
$6.450
|
$6.000
|
$6.500
|
$5.000
|
$6.720
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
45.000
|
$250.000
|
$125.000
|
$120.000
|
$125.000
|
$120.000
|
$134.400
|
$150.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
1.000
|
$175.000
|
$210.000
|
$200.000
|
$210.000
|
$240.000
|
$224.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
45.000
|
$145.000
|
$146.000
|
$140.000
|
$150.000
|
$140.000
|
$156.800
|
$250.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
3.000
|
$1,045.000
|
$580.000
|
$555.000
|
$600.000
|
$600.000
|
$621.600
|
$700.000
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
3.000
|
$270.000
|
$210.000
|
$200.000
|
$210.000
|
$100.000
|
$224.000
|
$250.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
6,132.000
|
$0.120
|
$0.210
|
$0.200
|
$0.210
|
$0.150
|
$0.220
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
1,555.000
|
$0.200
|
$0.520
|
$0.500
|
$0.550
|
$0.350
|
$0.560
|
$1.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
144.000
|
$2.600
|
$3.100
|
$3.000
|
$3.250
|
$1.000
|
$3.360
|
$4.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
11.000
|
$26.000
|
$72.000
|
$70.000
|
$75.000
|
$20.000
|
$78.400
|
$100.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
10.000
|
$35.000
|
$72.000
|
$70.000
|
$75.000
|
$30.000
|
$78.400
|
$100.000
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
3.000
|
$110.000
|
$205.000
|
$200.000
|
$210.000
|
$20.000
|
$224.000
|
$250.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
1.000
|
$80.000
|
$205.000
|
$200.000
|
$210.000
|
$55.000
|
$224.000
|
$250.000
|
|
|
PAVEMENT SEALER (RR XING)
|
EA
|
3.000
|
$120.000
|
$205.000
|
$200.000
|
$210.000
|
$175.000
|
$224.000
|
$250.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
230.000
|
$0.480
|
$1.040
|
$1.000
|
$1.050
|
$1.000
|
$1.120
|
$1.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
109,099.000
|
$0.430
|
$0.370
|
$0.360
|
$0.390
|
$0.370
|
$0.400
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
32,411.000
|
$0.500
|
$0.580
|
$0.560
|
$0.580
|
$0.500
|
$0.630
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
9,730.000
|
$0.450
|
$0.370
|
$0.360
|
$0.380
|
$0.450
|
$0.400
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
117,488.000
|
$0.440
|
$0.370
|
$0.360
|
$0.390
|
$0.370
|
$0.400
|
$0.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
339.000
|
$3.800
|
$3.300
|
$3.200
|
$3.400
|
$4.000
|
$3.580
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
6,318.000
|
$3.800
|
$3.300
|
$3.200
|
$3.400
|
$4.000
|
$3.580
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
120.000
|
$5.700
|
$4.200
|
$4.000
|
$4.200
|
$4.000
|
$4.480
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,440.000
|
$0.410
|
$0.470
|
$0.450
|
$0.470
|
$0.400
|
$0.500
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,555.000
|
$1.000
|
$0.620
|
$0.600
|
$0.650
|
$0.800
|
$0.670
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
144.000
|
$3.200
|
$3.100
|
$3.000
|
$3.200
|
$1.250
|
$3.360
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
7.000
|
$43.000
|
$52.000
|
$50.000
|
$53.000
|
$45.000
|
$56.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (RR XING)
|
EA
|
3.000
|
$330.000
|
$205.000
|
$200.000
|
$210.000
|
$165.000
|
$224.000
|
$250.000
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
3.000
|
$52.000
|
$205.000
|
$200.000
|
$210.000
|
$55.000
|
$224.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
11,372.000
|
$0.130
|
$0.110
|
$0.100
|
$0.110
|
$0.150
|
$0.110
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,555.000
|
$0.300
|
$0.110
|
$0.100
|
$0.110
|
$0.300
|
$0.110
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
144.000
|
$1.200
|
$1.040
|
$1.000
|
$1.100
|
$0.450
|
$1.120
|
$2.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
10.000
|
$32.500
|
$52.000
|
$50.000
|
$53.000
|
$25.000
|
$56.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
1.000
|
$40.000
|
$52.000
|
$200.000
|
$53.000
|
$40.000
|
$56.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
10.000
|
$40.000
|
$52.000
|
$50.000
|
$53.000
|
$35.000
|
$56.000
|
$100.000
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
3.000
|
$75.000
|
$155.000
|
$150.000
|
$160.000
|
$75.000
|
$168.000
|
$250.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
3.000
|
$35.000
|
$105.000
|
$100.000
|
$105.000
|
$35.000
|
$112.000
|
$250.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$2,500.000
|
$1,475.000
|
$2,000.000
|
$17,500.000
|
$10,000.000
|
$9,527.510
|
$5,000.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
40,040.000
|
$100.000
|
$88.000
|
$96.000
|
$89.900
|
$86.500
|
$110.770
|
$98.000
|
|
|
TACK COAT
|
GAL
|
40,040.000
|
$3.500
|
$0.001
|
$2.500
|
$2.900
|
$2.500
|
$4.670
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$11,000.000
|
$6,000.000
|
$10,000.000
|
$12,500.000
|
$20,000.000
|
$18,453.510
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
88.000
|
$135.000
|
$280.000
|
$100.000
|
$225.000
|
$288.000
|
$392.020
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$45.000
|
$52.000
|
$1.000
|
$60.000
|
$100.000
|
$107.680
|
$85.000
|
|
Totals: |
$7,233,818.390
|
$6,382,562.980
|
$6,479,438.730
|
$6,916,608.250
|
$7,236,917.830
|
$8,029,214.490
|
$8,561,759.450
|