EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
9.000
|
$25.000
|
$110.000
|
$300.000
|
$100.000
|
$110.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
248.470
|
$155.000
|
$205.000
|
$100.000
|
$218.230
|
$250.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
10,757.000
|
$1.100
|
$1.000
|
$2.000
|
$2.100
|
$0.950
|
|
|
BLOCK SODDING
|
SY
|
10,757.000
|
$3.750
|
$4.500
|
$4.000
|
$5.690
|
$4.500
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
3,587.000
|
$0.400
|
$0.260
|
$0.010
|
$2.060
|
$0.270
|
|
|
VEGETATIVE WATERING
|
MG
|
2,136.000
|
$2.000
|
$0.010
|
$1.000
|
$0.110
|
$20.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,600.000
|
$55.000
|
$65.000
|
$75.000
|
$80.710
|
$66.500
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
25,509.000
|
$2.300
|
$3.000
|
$1.500
|
$2.860
|
$3.100
|
|
|
CEM STABIL BKFL
|
CY
|
9.000
|
$175.000
|
$884.000
|
$250.000
|
$800.000
|
$860.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
20.000
|
$230.000
|
$242.000
|
$400.000
|
$500.000
|
$535.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
8.500
|
$300.000
|
$663.000
|
$600.000
|
$653.150
|
$640.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
85.000
|
$350.000
|
$304.000
|
$200.000
|
$301.610
|
$295.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
175.000
|
$475.000
|
$592.000
|
$600.000
|
$577.130
|
$575.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,000.000
|
$1,600.000
|
$1,500.000
|
$1,500.000
|
$1,650.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$232,464.000
|
$178,116.000
|
$100,000.000
|
$293,901.480
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$9,500.000
|
$26,000.000
|
$10,000.000
|
$25,000.000
|
$8,750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
270.000
|
$55.000
|
$62.000
|
$56.000
|
$112.290
|
$60.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
270.000
|
$10.000
|
$8.850
|
$8.000
|
$15.370
|
$9.500
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
234.000
|
$20.000
|
$25.400
|
$25.000
|
$38.620
|
$27.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$7.000
|
$7.620
|
$7.500
|
$7.630
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,014.000
|
$2.750
|
$2.370
|
$2.300
|
$4.450
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,014.000
|
$0.500
|
$0.520
|
$0.500
|
$0.880
|
$0.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,237.000
|
$4.300
|
$4.100
|
$4.000
|
$5.650
|
$4.400
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,237.000
|
$1.150
|
$0.780
|
$0.750
|
$0.880
|
$0.850
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
41,264.000
|
$0.180
|
$0.145
|
$0.140
|
$0.340
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
19,331.000
|
$0.180
|
$0.145
|
$0.140
|
$0.360
|
$0.260
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,895.000
|
$23.000
|
$24.000
|
$22.000
|
$22.250
|
$25.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
180.000
|
$90.000
|
$103.000
|
$200.000
|
$60.000
|
$102.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$1,300.000
|
$1,705.000
|
$1,500.000
|
$1,125.000
|
$1,210.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,975.000
|
$2.750
|
$1.750
|
$5.000
|
$3.000
|
$2.300
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
18.000
|
$3,000.000
|
$2,800.000
|
$2,750.000
|
$2,900.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
17.000
|
$250.000
|
$208.000
|
$200.000
|
$300.000
|
$225.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
91.000
|
$500.000
|
$670.000
|
$615.000
|
$615.000
|
$760.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$550.000
|
$825.000
|
$750.000
|
$750.000
|
$910.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$750.000
|
$1,275.000
|
$1,115.000
|
$1,115.000
|
$1,350.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$850.000
|
$1,230.000
|
$1,080.000
|
$1,080.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$925.000
|
$1,400.000
|
$1,230.000
|
$1,230.000
|
$1,510.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
7.000
|
$800.000
|
$1,400.000
|
$1,250.000
|
$1,250.000
|
$1,510.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
104.000
|
$100.000
|
$78.000
|
$20.000
|
$20.000
|
$105.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
38.000
|
$29.000
|
$25.750
|
$24.000
|
$24.000
|
$44.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
9.000
|
$130.000
|
$46.000
|
$75.000
|
$100.000
|
$88.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,255.000
|
$1.500
|
$1.050
|
$0.750
|
$3.880
|
$2.500
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
507.000
|
$5.500
|
$1.030
|
$1.000
|
$1.000
|
$2.200
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
689.000
|
$1.200
|
$1.030
|
$1.000
|
$1.000
|
$1.200
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
132.000
|
$3.800
|
$5.200
|
$4.000
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
267.000
|
$7.000
|
$8.200
|
$8.000
|
$8.000
|
$8.800
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$140.000
|
$156.000
|
$150.000
|
$150.000
|
$175.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
11.000
|
$160.000
|
$207.000
|
$175.000
|
$200.000
|
$210.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
57,588.000
|
$0.200
|
$0.160
|
$0.170
|
$0.150
|
$0.190
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
51.000
|
$0.350
|
$1.030
|
$0.420
|
$1.000
|
$0.460
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
267.000
|
$3.500
|
$2.040
|
$3.000
|
$2.000
|
$3.100
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
57,588.000
|
$0.200
|
$0.160
|
$0.170
|
$0.150
|
$0.190
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,100.000
|
$0.200
|
$0.260
|
$0.500
|
$0.250
|
$0.150
|
|
|
PAVEMENT SEALER 12"
|
LF
|
132.000
|
$1.200
|
$2.060
|
$1.000
|
$2.000
|
$0.950
|
|
|
PAVEMENT SEALER 24"
|
LF
|
27.000
|
$2.000
|
$4.080
|
$2.000
|
$4.000
|
$1.750
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
41,678.000
|
$0.400
|
$0.480
|
$0.500
|
$0.460
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
8,597.000
|
$0.700
|
$0.730
|
$0.800
|
$0.700
|
$0.780
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,900.000
|
$0.500
|
$0.580
|
$0.550
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
34,142.000
|
$0.450
|
$0.480
|
$0.550
|
$0.460
|
$0.550
|
|
REFL PAV MRKR TY I-C
|
EA
|
38.000
|
$4.300
|
$10.500
|
$5.000
|
$10.000
|
$4.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
819.000
|
$4.300
|
$4.620
|
$3.750
|
$4.500
|
$5.200
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,556.000
|
$0.500
|
$1.030
|
$2.000
|
$1.000
|
$2.100
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
132.000
|
$1.750
|
$3.090
|
$3.000
|
$3.000
|
$2.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
15.000
|
$3.850
|
$5.200
|
$4.000
|
$5.000
|
$4.200
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$65.000
|
$78.000
|
$100.000
|
$75.000
|
$104.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$115.000
|
$104.000
|
$100.000
|
$100.000
|
$104.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,556.000
|
$0.150
|
$1.030
|
$0.500
|
$1.000
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
132.000
|
$0.600
|
$0.840
|
$1.000
|
$0.800
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
15.000
|
$1.050
|
$2.060
|
$1.000
|
$2.000
|
$0.680
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$20.000
|
$10.250
|
$14.000
|
$10.000
|
$15.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$20.000
|
$10.250
|
$16.000
|
$15.000
|
$17.500
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$5,600.000
|
$1,550.000
|
$1,500.000
|
$3,600.000
|
$6,300.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
800.000
|
$25.000
|
$8.852
|
$10.000
|
$8.000
|
$9.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
8.000
|
$250.000
|
$120.000
|
$125.000
|
$200.000
|
$220.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
13,578.000
|
$110.000
|
$121.530
|
$137.500
|
$114.500
|
$129.500
|
|
|
TACK COAT
|
GAL
|
10,642.000
|
$3.750
|
$0.010
|
$0.010
|
$4.500
|
$1.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$13,000.000
|
$2,900.000
|
$4,600.000
|
$3,031.000
|
$7,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
68.000
|
$145.000
|
$1.000
|
$1.000
|
$304.880
|
$210.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
25.000
|
$300.000
|
$1.000
|
$1.000
|
$811.720
|
$250.000
|
|
Totals: |
$2,609,160.350
|
$2,748,754.005
|
$2,787,452.580
|
$2,939,014.853
|
$3,029,268.180
|