PREPARING ROW
|
STA
|
92.800
|
$2,500.000
|
$1,037.250
|
$2,612.000
|
$3,335.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
270.000
|
$18.000
|
$16.000
|
$30.000
|
$50.000
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
2,359.000
|
$18.000
|
$13.500
|
$28.000
|
$20.000
|
|
|
RMV (20") TRT/UNTRT BASE & ASPH PAV
|
SY
|
296.000
|
$20.000
|
$11.000
|
$10.500
|
$50.000
|
|
|
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
|
SY
|
844.000
|
$10.000
|
$11.000
|
$17.850
|
$20.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
2.000
|
$30.000
|
$175.000
|
$105.000
|
$500.000
|
|
|
SUBGR WIDEN (OC)
|
STA
|
13.250
|
$550.000
|
$1,234.000
|
$1,575.000
|
$450.000
|
|
|
EMBANK (FNL)(OC)(TY C)
|
CY
|
673.000
|
$50.000
|
$72.000
|
$63.000
|
$50.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
19.700
|
$300.000
|
$360.000
|
$735.000
|
$450.000
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
13.250
|
$200.000
|
$555.000
|
$3,600.000
|
$450.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
14,092.000
|
$1.500
|
$2.600
|
$1.050
|
$10.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
14,092.000
|
$0.170
|
$0.330
|
$0.360
|
$0.500
|
|
|
HYDRO MULCH SEED (PERM_URBAN_CLAY)
|
SY
|
14,092.000
|
$0.250
|
$0.550
|
$0.550
|
$0.500
|
|
|
VEGETATIVE WATERING
|
TGL
|
4,194.000
|
$2.500
|
$0.100
|
$2.100
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
|
SY
|
1,621.000
|
$40.000
|
$45.000
|
$52.500
|
$50.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
325.000
|
$15.000
|
$8.000
|
$17.000
|
$6.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
292.000
|
$140.000
|
$188.000
|
$225.000
|
$165.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
4,298.000
|
$150.000
|
$161.000
|
$165.000
|
$185.000
|
|
|
TACK COAT
|
GAL
|
3,488.000
|
$5.500
|
$4.600
|
$1.000
|
$10.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
3,905.000
|
$105.000
|
$92.000
|
$90.000
|
$80.000
|
|
|
PLANE & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
9,330.000
|
$2.500
|
$3.220
|
$3.150
|
$10.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
8.000
|
$500.000
|
$1,000.000
|
$1,100.000
|
$550.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
172.000
|
$450.000
|
$800.000
|
$750.000
|
$550.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
34.000
|
$275.000
|
$330.000
|
$500.000
|
$185.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
104.000
|
$80.000
|
$105.000
|
$100.000
|
$95.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
24.000
|
$100.000
|
$132.000
|
$175.000
|
$120.000
|
|
|
RC PIPE (CL IV)(42 IN)
|
LF
|
16.000
|
$210.000
|
$420.000
|
$800.000
|
$250.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 42 IN)
|
EA
|
2.000
|
$16,000.000
|
$19,000.000
|
$20,000.000
|
$25,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,400.000
|
$2,200.000
|
$1,800.000
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$2,400.000
|
$2,400.000
|
$2,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$1,200.000
|
$3,600.000
|
$3,500.000
|
$2,500.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$1,800.000
|
$1,200.000
|
$7,500.000
|
$2,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
3.000
|
$500.000
|
$300.000
|
$1,500.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$279,181.000
|
$300,049.000
|
$339,966.500
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$20,000.000
|
$18,755.000
|
$31,500.000
|
$8,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
2.000
|
$15,000.000
|
$450.000
|
$210.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$175.000
|
$400.000
|
$157.500
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
16.000
|
$200.000
|
$1.000
|
$840.000
|
$550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
420.000
|
$63.000
|
$52.000
|
$54.320
|
$40.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
184.000
|
$80.000
|
$82.000
|
$111.830
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
604.000
|
$25.000
|
$18.000
|
$26.630
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
164.000
|
$30.000
|
$43.000
|
$37.280
|
$50.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
164.000
|
$15.000
|
$16.000
|
$10.650
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,510.000
|
$4.000
|
$4.500
|
$3.460
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,510.000
|
$1.000
|
$1.100
|
$1.070
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
489.000
|
$10.000
|
$5.500
|
$6.390
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
489.000
|
$2.000
|
$1.100
|
$1.070
|
$9.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
2,343.000
|
$150.000
|
$132.000
|
$116.000
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
831.000
|
$90.000
|
$104.000
|
$106.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,275.000
|
$30.000
|
$26.000
|
$23.430
|
$28.000
|
|
|
SHORT RADIUS (28")
|
LF
|
50.000
|
$45.000
|
$28.000
|
$25.030
|
$50.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,850.000
|
$3.500
|
$3.000
|
$2.660
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
19.000
|
$2,600.000
|
$3,200.000
|
$3,035.250
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
15.000
|
$250.000
|
$275.000
|
$266.250
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
5.000
|
$300.000
|
$300.000
|
$282.230
|
$850.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
22.000
|
$40.000
|
$38.000
|
$37.280
|
$30.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
32.000
|
$750.000
|
$691.000
|
$662.430
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$850.000
|
$810.000
|
$749.760
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$1,050.000
|
$998.970
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$885.000
|
$1,650.000
|
$1,627.320
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,150.000
|
$1,142.750
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,250.000
|
$1,325.000
|
$1,272.680
|
$1,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
|
EA
|
54.000
|
$25.000
|
$23.000
|
$21.830
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
15.000
|
$50.000
|
$50.000
|
$47.930
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
98.000
|
$2.000
|
$1.200
|
$5.250
|
$6.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
928.000
|
$1.750
|
$1.200
|
$5.500
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
141.000
|
$1.400
|
$2.100
|
$1.600
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,957.000
|
$1.200
|
$1.100
|
$1.040
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
280.000
|
$10.000
|
$7.810
|
$10.380
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
22.000
|
$170.000
|
$160.000
|
$202.350
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
14.000
|
$170.000
|
$237.000
|
$239.630
|
$250.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
18,560.000
|
$1.000
|
$0.220
|
$0.320
|
$1.000
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
18,560.000
|
$1.000
|
$0.220
|
$0.320
|
$1.000
|
|
|
PAVEMENT SLER 8"
|
LF
|
10.000
|
$2.250
|
$3.850
|
$0.530
|
$20.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
81.000
|
$3.000
|
$8.310
|
$3.200
|
$20.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
17,280.000
|
$0.750
|
$0.720
|
$0.750
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
740.000
|
$0.750
|
$0.720
|
$0.770
|
$1.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
22,380.000
|
$0.750
|
$0.720
|
$0.750
|
$1.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
98.000
|
$4.100
|
$4.400
|
$5.270
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
982.000
|
$4.750
|
$4.400
|
$5.270
|
$6.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
10.000
|
$2.000
|
$3.300
|
$1.070
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
81.000
|
$2.500
|
$7.700
|
$2.130
|
$20.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$5,000.000
|
$2,600.000
|
$3,000.000
|
$5,000.000
|
|
Totals: |
$3,070,989.240
|
$3,015,283.420
|
$3,395,000.000
|
$3,604,268.000
|