|
|
PREPARING ROW
|
STA
|
110.000
|
$3,500.000
|
$1,800.000
|
$1,500.000
|
$1,000.000
|
$2,500.000
|
$5,000.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
110.000
|
$400.000
|
$250.000
|
$950.000
|
$750.000
|
$630.000
|
$500.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
2,290.000
|
$38.000
|
$27.000
|
$25.000
|
$20.000
|
$28.000
|
$20.000
|
|
|
BACKFILL (TY A)
|
STA
|
110.000
|
$500.000
|
$482.000
|
$250.000
|
$1,300.000
|
$220.000
|
$800.000
|
|
|
BLADING
|
STA
|
110.000
|
$350.000
|
$196.000
|
$500.000
|
$120.000
|
$195.000
|
$350.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
34,222.000
|
$1.100
|
$0.650
|
$0.650
|
$0.700
|
$0.650
|
$0.720
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
17,111.000
|
$1.100
|
$0.570
|
$0.650
|
$0.650
|
$0.600
|
$0.600
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
17,111.000
|
$1.100
|
$0.540
|
$0.590
|
$0.550
|
$0.550
|
$0.580
|
|
|
VEGETATIVE WATERING
|
MG
|
753.000
|
$11.000
|
$18.000
|
$0.010
|
$10.000
|
$33.000
|
$10.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
14,373.000
|
$6.500
|
$4.750
|
$5.500
|
$4.750
|
$4.000
|
$5.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
342.000
|
$140.000
|
$179.000
|
$150.000
|
$179.000
|
$188.000
|
$225.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
3,000.000
|
$85.000
|
$50.000
|
$76.000
|
$68.000
|
$75.000
|
$75.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,244.000
|
$2.500
|
$13.500
|
$7.000
|
$10.000
|
$8.000
|
$7.000
|
|
|
PLANE ASPH CONC PAV(2" TO 4")
|
SY
|
1,911.000
|
$3.000
|
$0.010
|
$7.500
|
$11.000
|
$10.000
|
$7.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
90.000
|
$30.000
|
$97.000
|
$75.000
|
$130.000
|
$105.000
|
$150.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
100.000
|
$140.000
|
$182.000
|
$110.000
|
$225.000
|
$160.000
|
$225.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
8.000
|
$500.000
|
$927.000
|
$650.000
|
$1,500.000
|
$735.000
|
$2,000.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
16.000
|
$600.000
|
$1,130.000
|
$900.000
|
$1,650.000
|
$945.000
|
$2,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
504.000
|
$60.000
|
$48.000
|
$70.000
|
$65.000
|
$65.000
|
$65.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
3.000
|
$6,500.000
|
$8,210.000
|
$7,500.000
|
$15,000.000
|
$10,000.000
|
$15,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
38.000
|
$850.000
|
$925.000
|
$850.000
|
$950.000
|
$1,050.000
|
$900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
8.000
|
$2,000.000
|
$1,000.000
|
$500.000
|
$2,100.000
|
$2,100.000
|
$5,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$2,500.000
|
$1,200.000
|
$2,500.000
|
$1,500.000
|
$2,100.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
19.000
|
$450.000
|
$350.000
|
$500.000
|
$500.000
|
$1,600.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$230,000.000
|
$179,100.000
|
$280,000.000
|
$307,000.000
|
$355,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$7,500.000
|
$2,000.000
|
$3,000.000
|
$7,000.000
|
$3,500.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
500.000
|
$35.000
|
$32.000
|
$38.000
|
$33.000
|
$34.000
|
$36.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
500.000
|
$8.500
|
$9.000
|
$10.000
|
$10.000
|
$9.500
|
$10.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
150.000
|
$25.000
|
$45.000
|
$45.000
|
$20.000
|
$31.000
|
$30.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$100.000
|
$95.000
|
$75.000
|
$60.000
|
$230.000
|
$125.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$2.800
|
$3.050
|
$7.000
|
$3.350
|
$3.200
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$0.700
|
$4.000
|
$0.750
|
$0.750
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
60.000
|
$85.000
|
$165.000
|
$125.000
|
$100.000
|
$245.000
|
$150.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,911.000
|
$80.000
|
$48.650
|
$65.000
|
$58.000
|
$47.000
|
$50.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,293.000
|
$65.000
|
$47.890
|
$52.000
|
$55.000
|
$41.000
|
$45.000
|
|
|
TURNOUTS (ACP)
|
SY
|
108.000
|
$84.000
|
$102.650
|
$71.000
|
$98.000
|
$42.000
|
$50.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
22,000.000
|
$0.200
|
$0.500
|
$0.300
|
$0.700
|
$0.300
|
$0.500
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
11,000.000
|
$0.200
|
$0.500
|
$0.300
|
$0.760
|
$0.300
|
$0.500
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
9.000
|
$250.000
|
$322.000
|
$350.000
|
$375.000
|
$340.000
|
$370.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$550.000
|
$614.000
|
$700.000
|
$715.000
|
$645.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$650.000
|
$855.000
|
$350.000
|
$995.000
|
$900.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$730.000
|
$915.000
|
$1,000.000
|
$1,050.000
|
$960.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$725.000
|
$919.000
|
$1,000.000
|
$1,075.000
|
$965.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$825.000
|
$1,052.000
|
$1,200.000
|
$1,225.000
|
$1,100.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,300.000
|
$1,015.000
|
$1,200.000
|
$1,200.000
|
$1,050.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
24.000
|
$400.000
|
$426.000
|
$600.000
|
$500.000
|
$450.000
|
$500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
37.000
|
$75.000
|
$94.000
|
$250.000
|
$110.000
|
$140.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$35.000
|
$100.000
|
$100.000
|
$100.000
|
$37.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
22,000.000
|
$0.250
|
$0.250
|
$0.280
|
$0.290
|
$0.250
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
200.000
|
$3.000
|
$3.000
|
$3.500
|
$3.500
|
$3.150
|
$3.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
22,000.000
|
$0.250
|
$0.250
|
$0.280
|
$0.290
|
$0.250
|
$0.280
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,224.000
|
$0.600
|
$1.600
|
$2.000
|
$1.450
|
$1.300
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
1,060.000
|
$1.500
|
$1.150
|
$2.000
|
$1.150
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
200.000
|
$6.000
|
$6.000
|
$7.000
|
$7.000
|
$6.300
|
$7.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
22,000.000
|
$0.300
|
$0.600
|
$0.270
|
$0.700
|
$0.650
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
23,280.000
|
$0.400
|
$0.600
|
$0.650
|
$0.700
|
$0.650
|
$0.700
|
|
REFL PAV MRKR TY I-A
|
EA
|
198.000
|
$3.500
|
$4.000
|
$6.000
|
$4.500
|
$4.200
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
556.000
|
$3.500
|
$4.000
|
$5.000
|
$4.500
|
$4.200
|
$4.500
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
3,392.000
|
$145.000
|
$135.000
|
$150.000
|
$147.000
|
$150.000
|
$200.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
3,764.000
|
$160.000
|
$140.000
|
$150.000
|
$147.000
|
$165.000
|
$185.000
|
|
|
TACK COAT
|
GAL
|
680.000
|
$4.000
|
$4.000
|
$8.000
|
$3.400
|
$4.500
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$80.000
|
$100.000
|
$125.000
|
$115.000
|
$220.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$10,000.000
|
$12,000.000
|
$4,500.000
|
$13,000.000
|
$22,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$150.000
|
$150.000
|
$400.000
|
$140.000
|
$235.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
75.000
|
$150.000
|
$0.010
|
$550.000
|
$150.000
|
$105.000
|
$300.000
|
|
Totals: |
$3,073,701.300
|
$2,429,718.640
|
$2,844,078.470
|
$2,861,553.150
|
$2,992,093.950
|
$3,671,102.820
|