PREPARING ROW
|
STA
|
398.000
|
$6,000.000
|
$2,550.000
|
$4,500.000
|
$4,600.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
14.000
|
$15.000
|
$35.000
|
$68.500
|
$35.000
|
|
|
REMOV CONC (FLUME)
|
SY
|
15.000
|
$35.000
|
$35.000
|
$68.500
|
$35.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
20.000
|
$30.000
|
$40.000
|
$48.000
|
$80.000
|
|
|
EMBANK (VEH)(OC)(TY C)
|
CY
|
82.000
|
$75.000
|
$95.000
|
$80.400
|
$50.000
|
|
|
BACKFILL (TY A)
|
LF
|
34,800.000
|
$4.500
|
$3.290
|
$1.700
|
$6.150
|
|
|
BACKFILL (TY B)
|
LF
|
71,870.000
|
$3.500
|
$1.420
|
$1.300
|
$3.750
|
|
|
BLADING
|
HR
|
100.000
|
$200.000
|
$165.000
|
$302.500
|
$100.000
|
|
|
FURN & PLACE TOPSOIL (4")
|
SY
|
1,271.000
|
$8.000
|
$4.650
|
$5.500
|
$6.000
|
|
|
BROADCAST SEED (PERM_RURAL_SAND)
|
SY
|
36,193.000
|
$0.150
|
$0.120
|
$0.160
|
$0.200
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
72,384.000
|
$2.000
|
$0.570
|
$0.750
|
$0.650
|
|
|
BOND FBR MTRX SEED (TEMP)(WARM)
|
SY
|
36,193.000
|
$1.000
|
$0.540
|
$0.710
|
$0.600
|
|
|
BOND FBR MTRX SEED (TEMP)(COOL)
|
SY
|
36,193.000
|
$1.000
|
$0.540
|
$0.710
|
$0.600
|
|
|
VEGETATIVE WATERING
|
TGL
|
1,991.000
|
$7.500
|
$8.550
|
$37.750
|
$10.000
|
|
|
PRIME COAT & BLOTTER (MC-30)
|
GAL
|
13,436.000
|
$6.500
|
$7.000
|
$7.000
|
$6.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
110,308.000
|
$5.750
|
$4.330
|
$4.850
|
$4.500
|
|
|
AGGR (TY-PD OR PL, GR-4)
|
CY
|
2,554.000
|
$230.000
|
$165.000
|
$206.250
|
$150.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
47,704.000
|
$175.000
|
$155.500
|
$155.000
|
$185.000
|
|
|
SP MIXES SP-D PG64-22
|
TON
|
100.000
|
$175.000
|
$900.000
|
$200.000
|
$285.000
|
|
|
TACK COAT
|
GAL
|
21,684.000
|
$5.000
|
$0.010
|
$5.000
|
$5.750
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
33,705.000
|
$175.000
|
$210.000
|
$228.000
|
$235.000
|
|
|
PLANE ASPH CONC PAV(2")
|
SY
|
306,410.000
|
$7.500
|
$3.750
|
$1.800
|
$4.750
|
|
|
PLANE ASPH CONC PAV(4")
|
SY
|
216,023.000
|
$10.000
|
$5.250
|
$3.500
|
$6.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
21.000
|
$500.000
|
$565.000
|
$440.000
|
$425.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
110.000
|
$255.000
|
$181.000
|
$462.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
34.200
|
$750.000
|
$795.000
|
$710.000
|
$800.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
28.000
|
$250.000
|
$235.000
|
$270.000
|
$300.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
211.000
|
$275.000
|
$235.000
|
$275.000
|
$300.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
66.000
|
$120.000
|
$75.000
|
$93.200
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
20.000
|
$160.000
|
$210.000
|
$149.150
|
$110.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,500.000
|
$990.000
|
$972.300
|
$1,250.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$2,150.000
|
$1,571.500
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
EA
|
4.000
|
$1,000.000
|
$1,500.000
|
$1,200.000
|
$750.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,250,000.000
|
$1,077,000.000
|
$2,000,000.000
|
$2,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$10,000.000
|
$3,700.000
|
$25,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
14.000
|
$175.000
|
$250.000
|
$465.000
|
$350.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$400.000
|
$210.000
|
$400.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$450.000
|
$1.000
|
$400.000
|
$500.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
125.000
|
$45.000
|
$65.000
|
$40.000
|
$75.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$150.000
|
$145.000
|
$180.000
|
$125.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,500.000
|
$5.000
|
$4.000
|
$5.300
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,500.000
|
$1.500
|
$0.500
|
$0.650
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
400.000
|
$9.500
|
$5.000
|
$6.600
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
400.000
|
$3.500
|
$1.000
|
$1.300
|
$2.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$175.000
|
$145.000
|
$200.000
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
147.000
|
$1.000
|
$146.000
|
$91.500
|
$85.000
|
|
|
TURNOUTS (ACP)
|
SY
|
48.000
|
$1.000
|
$122.000
|
$82.000
|
$100.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
102,910.000
|
$0.300
|
$0.250
|
$0.370
|
$0.750
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
53,050.000
|
$0.300
|
$0.460
|
$0.370
|
$0.750
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
225.000
|
$50.000
|
$28.000
|
$38.300
|
$32.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
100.000
|
$100.000
|
$98.500
|
$122.750
|
$110.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,500.000
|
$2,900.000
|
$3,828.000
|
$3,300.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
2.000
|
$225.000
|
$441.000
|
$650.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
7.000
|
$45.000
|
$30.000
|
$46.200
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
33,960.000
|
$0.400
|
$0.500
|
$0.670
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
2,768.000
|
$0.320
|
$0.500
|
$0.670
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
104,680.000
|
$0.420
|
$0.500
|
$0.670
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
825.000
|
$0.430
|
$0.500
|
$0.670
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
115.000
|
$2.000
|
$4.000
|
$5.300
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,250.000
|
$0.320
|
$0.500
|
$0.670
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
315,150.000
|
$0.420
|
$0.500
|
$0.670
|
$0.550
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
5,103.000
|
$3.000
|
$1.850
|
$2.850
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
63.000
|
$2.500
|
$5.000
|
$3.500
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
675.000
|
$3.000
|
$1.850
|
$2.850
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
23,643.000
|
$1.890
|
$1.850
|
$2.850
|
$3.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
13,640.000
|
$0.900
|
$1.300
|
$1.500
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
21,912.000
|
$1.500
|
$1.300
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
2,768.000
|
$2.000
|
$1.500
|
$2.000
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
275.000
|
$2.000
|
$3.000
|
$4.000
|
$3.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
115.000
|
$10.000
|
$7.000
|
$9.250
|
$8.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
11,320.000
|
$1.000
|
$0.800
|
$1.100
|
$0.900
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
104,680.000
|
$0.750
|
$0.700
|
$1.000
|
$0.800
|
|
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
|
LF
|
750.000
|
$1.000
|
$1.000
|
$1.350
|
$1.150
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
105,050.000
|
$1.000
|
$0.700
|
$1.000
|
$0.800
|
|
PREFAB PM TY C (W)(ARROW)
|
EA
|
2.000
|
$275.000
|
$225.000
|
$300.000
|
$265.000
|
|
PREFAB PM TY C (W)(LN REDUCT ARROW)
|
EA
|
14.000
|
$500.000
|
$365.000
|
$485.000
|
$425.000
|
|
PREFAB PM TY C (W)(WORD)
|
EA
|
2.000
|
$325.000
|
$275.000
|
$365.000
|
$325.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
563.000
|
$4.800
|
$6.000
|
$8.000
|
$7.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,477.000
|
$5.250
|
$6.000
|
$8.000
|
$7.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$8,000.000
|
$10,000.000
|
$11,560.000
|
$15,000.000
|
|
|
LITTER REMOVAL
|
CYC
|
1.000
|
$4,000.000
|
$2,500.000
|
$3,500.000
|
$15,000.000
|
|
Totals: |
$26,418,702.980
|
$21,244,670.260
|
$22,994,929.600
|
$26,919,986.950
|