EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
75.000
|
$35.000
|
$5.000
|
$10.000
|
$50.000
|
$177.000
|
|
|
BLOCK SODDING
|
SY
|
1,050.000
|
$5.000
|
$7.000
|
$3.000
|
$7.850
|
$7.300
|
|
|
VEGETATIVE WATERING
|
MG
|
21.000
|
$20.000
|
$100.000
|
$11.000
|
$39.000
|
$115.000
|
|
|
CEM STABIL BKFL
|
CY
|
16.000
|
$200.000
|
$300.000
|
$800.000
|
$570.000
|
$715.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.000
|
$300.000
|
$300.000
|
$500.000
|
$845.000
|
$715.000
|
|
|
APPROACH SLAB
|
CY
|
75.800
|
$450.000
|
$560.000
|
$800.000
|
$650.000
|
$976.000
|
|
|
EPOXY WATERPROOF FINISH
|
SF
|
720.000
|
$13.000
|
$13.000
|
$6.000
|
$35.000
|
$11.400
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
210.000
|
$250.000
|
$170.000
|
$1,000.000
|
$255.000
|
$270.400
|
|
|
CONC STR REP (REMOVE AND REPL BM END)
|
CY
|
0.400
|
$30,000.000
|
$10,000.000
|
$20,000.000
|
$110,000.000
|
$53,000.000
|
|
|
CONC STR REPAIR (PAN GIRDER HOLE REPR)
|
EA
|
112.000
|
$135.000
|
$420.000
|
$350.000
|
$255.000
|
$123.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
3.000
|
$1,000.000
|
$600.000
|
$500.000
|
$2,135.000
|
$2,600.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
320.000
|
$200.000
|
$150.000
|
$100.000
|
$230.000
|
$242.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
455.000
|
$35.000
|
$50.000
|
$80.000
|
$50.000
|
$70.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
88.000
|
$20.000
|
$25.000
|
$80.000
|
$22.000
|
$50.000
|
|
|
RESIZING AND SEALING JOINTS
|
LF
|
237.000
|
$5.000
|
$32.000
|
$80.000
|
$27.000
|
$58.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
1,179.000
|
$45.000
|
$65.000
|
$55.000
|
$50.000
|
$65.000
|
|
|
CLEAN & PAINT EXIST PILING (SYSTEM I-B)
|
LS
|
1.000
|
$6,000.000
|
$35,000.000
|
$50,000.000
|
$33,500.000
|
$27,000.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
187.000
|
$200.000
|
$200.000
|
$400.000
|
$260.000
|
$488.000
|
|
|
SHOT BLASTING
|
SY
|
1,179.000
|
$6.000
|
$5.000
|
$8.000
|
$20.000
|
$10.600
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$20,000.000
|
$50,000.000
|
$50,000.000
|
$123,000.000
|
$26,550.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$3,000.000
|
$17,500.000
|
$10,000.000
|
$12,500.000
|
$12,950.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$76,000.000
|
$95,000.000
|
$120,000.000
|
$335,000.000
|
$158,700.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$10,000.000
|
$300.000
|
$8,000.000
|
$5,100.000
|
$3,600.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
468.000
|
$25.000
|
$33.000
|
$25.000
|
$35.000
|
$33.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
468.000
|
$9.000
|
$12.000
|
$5.000
|
$11.500
|
$11.200
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
900.000
|
$4.000
|
$4.000
|
$5.000
|
$3.750
|
$3.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
900.000
|
$2.000
|
$1.500
|
$1.000
|
$1.250
|
$1.150
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
370.000
|
$60.000
|
$72.000
|
$100.000
|
$78.000
|
$64.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
370.000
|
$10.000
|
$62.000
|
$25.000
|
$40.000
|
$64.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
370.000
|
$7.000
|
$10.000
|
$25.000
|
$30.000
|
$64.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,750.000
|
$23.000
|
$23.000
|
$25.000
|
$25.750
|
$26.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,800.000
|
$1,700.000
|
$2,500.000
|
$1,850.000
|
$2,045.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
800.000
|
$3.000
|
$3.500
|
$10.000
|
$1.150
|
$3.500
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
8.000
|
$170.000
|
$150.000
|
$500.000
|
$210.000
|
$140.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,000.000
|
$2,700.000
|
$2,500.000
|
$3,225.000
|
$2,900.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
4.000
|
$2,000.000
|
$500.000
|
$2,500.000
|
$1,690.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$2,000.000
|
$200.000
|
$2,500.000
|
$845.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$9,000.000
|
$22,000.000
|
$10,250.000
|
$8,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
4.000
|
$25.000
|
$26.000
|
$25.000
|
$25.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
11.000
|
$30.000
|
$26.000
|
$20.000
|
$36.000
|
$30.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
3,200.000
|
$2.000
|
$3.500
|
$1.000
|
$3.750
|
$3.350
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
LF
|
3,200.000
|
$2.000
|
$3.500
|
$1.000
|
$3.750
|
$3.350
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
96.000
|
$10.000
|
$11.000
|
$10.000
|
$12.000
|
$11.200
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
68.000
|
$2.000
|
$6.000
|
$1.000
|
$4.000
|
$3.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
68.000
|
$2.000
|
$6.000
|
$1.000
|
$4.000
|
$3.350
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
570.000
|
$1.000
|
$6.000
|
$1.000
|
$6.000
|
$5.600
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
70.000
|
$1.000
|
$21.000
|
$1.000
|
$6.000
|
$5.600
|
|
|
PAVEMENT SEALER 4"
|
LF
|
640.000
|
$1.000
|
$6.000
|
$1.000
|
$6.000
|
$4.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4.000
|
$3.000
|
$2.000
|
$3.000
|
$25.000
|
$22.350
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
96.000
|
$1.000
|
$6.000
|
$1.000
|
$6.000
|
$5.600
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
640.000
|
$1.000
|
$6.000
|
$1.000
|
$6.000
|
$5.600
|
|
|
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
|
LF
|
37.000
|
$60.000
|
$20.000
|
$100.000
|
$10.850
|
$22.000
|
|
|
CONC RAIL REPAIR(REMOVE AND REPL RAIL)
|
LF
|
32.800
|
$600.000
|
$135.000
|
$1,000.000
|
$375.000
|
$960.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
847.000
|
$120.000
|
$300.000
|
$60.000
|
$125.000
|
$555.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$2,650.000
|
$10,000.000
|
$2,500.000
|
$10,300.000
|
|
|
TMA (STATIONARY)
|
DAY
|
34.000
|
$500.000
|
$230.000
|
$500.000
|
$270.000
|
$360.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$1,000.000
|
$32.750
|
$500.000
|
$750.000
|
$1,022.000
|
|
Totals: |
$931,926.000
|
$1,095,146.500
|
$1,358,422.000
|
$1,447,045.450
|
$1,635,118.600
|