|
|
PREPARING ROW
|
STA
|
25.500
|
$4,200.000
|
$2,400.000
|
$3,000.000
|
$2,500.000
|
$2,000.000
|
$1,500.000
|
$2,500.000
|
$4,500.000
|
|
|
REM STAB BASE & ASPH (6"-12")
|
SY
|
7,950.000
|
$7.000
|
$6.000
|
$6.000
|
$7.850
|
$7.000
|
$10.000
|
$8.000
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,410.000
|
$6.000
|
$6.000
|
$10.000
|
$9.600
|
$7.500
|
$15.000
|
$12.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
14,350.000
|
$8.500
|
$10.000
|
$12.000
|
$12.650
|
$12.000
|
$18.000
|
$15.000
|
$20.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
34,091.000
|
$2.000
|
$1.600
|
$2.000
|
$3.350
|
$3.000
|
$3.000
|
$3.250
|
$1.100
|
|
|
BLOCK SODDING
|
SY
|
148.000
|
$4.500
|
$5.000
|
$10.000
|
$5.250
|
$6.000
|
$5.000
|
$6.000
|
$6.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
34,091.000
|
$0.250
|
$0.300
|
$0.400
|
$0.300
|
$0.340
|
$0.500
|
$0.350
|
$0.360
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
17,048.000
|
$0.250
|
$0.240
|
$0.400
|
$0.250
|
$0.320
|
$0.500
|
$0.330
|
$0.330
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
17,048.000
|
$0.250
|
$0.240
|
$0.400
|
$0.250
|
$0.320
|
$0.500
|
$0.330
|
$0.340
|
|
|
VEGETATIVE WATERING
|
MG
|
341.000
|
$20.000
|
$30.000
|
$1.000
|
$23.000
|
$36.000
|
$10.000
|
$12.000
|
$20.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
2,381.000
|
$3.000
|
$1.200
|
$2.000
|
$1.000
|
$1.350
|
$5.000
|
$1.500
|
$1.500
|
|
|
FL BS (RDWY DEL) (TY A GR 1-2)
|
TON
|
3,260.000
|
$40.000
|
$40.000
|
$50.000
|
$48.500
|
$50.000
|
$40.000
|
$65.000
|
$98.000
|
|
|
CEMENT
|
TON
|
210.000
|
$170.000
|
$150.000
|
$160.000
|
$159.000
|
$245.000
|
$160.000
|
$155.000
|
$160.000
|
|
|
CEMENT TREAT (NEW BASE 14")
|
SY
|
4,851.000
|
$4.000
|
$2.300
|
$10.000
|
$3.840
|
$6.000
|
$10.000
|
$6.000
|
$3.150
|
|
|
CEMENT TREAT (SUBGRADE)(12")
|
SY
|
8,092.000
|
$4.500
|
$1.500
|
$8.000
|
$3.750
|
$5.000
|
$5.000
|
$5.000
|
$3.150
|
|
|
ASPH (RC-250)
|
GAL
|
1,991.000
|
$8.000
|
$3.500
|
$6.000
|
$5.500
|
$9.100
|
$8.000
|
$10.000
|
$3.750
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
4,194.000
|
$5.000
|
$3.000
|
$6.000
|
$3.300
|
$9.400
|
$7.000
|
$8.000
|
$3.000
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
53.000
|
$160.000
|
$160.000
|
$300.000
|
$150.000
|
$245.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
44.000
|
$175.000
|
$190.000
|
$300.000
|
$150.000
|
$245.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
61.000
|
$195.000
|
$140.000
|
$300.000
|
$150.000
|
$235.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIP
|
SY
|
248.000
|
$40.000
|
$35.000
|
$56.000
|
$53.000
|
$56.500
|
$35.000
|
$50.000
|
$51.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
4,795.000
|
$95.000
|
$100.000
|
$110.000
|
$112.000
|
$115.000
|
$130.000
|
$130.000
|
$140.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
1,178.000
|
$110.000
|
$110.000
|
$120.000
|
$112.000
|
$113.000
|
$130.000
|
$130.000
|
$140.000
|
|
|
CEM STABIL BKFL
|
CY
|
211.000
|
$225.000
|
$180.000
|
$180.000
|
$155.000
|
$200.000
|
$200.000
|
$245.000
|
$110.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
164.000
|
$50.000
|
$50.000
|
$105.000
|
$117.000
|
$45.000
|
$80.000
|
$50.000
|
$100.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
745.000
|
$160.000
|
$170.000
|
$135.000
|
$160.000
|
$148.000
|
$190.000
|
$150.000
|
$210.000
|
|
|
CL C CONC (ABUT)
|
CY
|
61.800
|
$1,000.000
|
$900.000
|
$900.000
|
$1,000.000
|
$1,200.000
|
$1,000.000
|
$950.000
|
$900.000
|
|
|
CL C CONC (BENT)
|
CY
|
50.300
|
$1,000.000
|
$900.000
|
$900.000
|
$1,100.000
|
$1,300.000
|
$1,250.000
|
$1,000.000
|
$1,300.000
|
|
|
REINF CONC SLAB
|
SF
|
11,500.000
|
$20.000
|
$16.000
|
$20.000
|
$18.200
|
$16.000
|
$19.000
|
$20.000
|
$19.000
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$500.000
|
$450.000
|
$500.000
|
$540.000
|
$525.000
|
$500.000
|
$535.000
|
$500.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,491.000
|
$150.000
|
$146.000
|
$140.000
|
$127.000
|
$136.500
|
$138.000
|
$130.000
|
$220.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
92.000
|
$110.000
|
$525.000
|
$500.000
|
$525.000
|
$445.000
|
$500.000
|
$450.000
|
$400.000
|
|
|
RAIL (TY T223)
|
LF
|
560.000
|
$100.000
|
$80.000
|
$110.000
|
$120.000
|
$110.000
|
$110.000
|
$95.000
|
$115.000
|
|
|
ARMOR JOINT
|
LF
|
84.000
|
$80.000
|
$60.000
|
$80.000
|
$62.000
|
$85.000
|
$120.000
|
$100.000
|
$55.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
64.000
|
$60.000
|
$45.000
|
$50.000
|
$47.000
|
$52.000
|
$50.000
|
$65.000
|
$74.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$800.000
|
$500.000
|
$1,000.000
|
$630.000
|
$880.000
|
$700.000
|
$800.000
|
$1,600.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$85,000.000
|
$18,000.000
|
$65,000.000
|
$110,000.000
|
$52,000.000
|
$100,000.000
|
$150,000.000
|
$100,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
2.000
|
$400.000
|
$380.000
|
$500.000
|
$310.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$150.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
1,265.000
|
$5.000
|
$2.800
|
$4.000
|
$1.000
|
$3.700
|
$5.000
|
$6.000
|
$5.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$240,000.000
|
$250,000.000
|
$195,000.000
|
$290,000.000
|
$297,500.000
|
$300,000.000
|
$275,000.000
|
$320,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$2,500.000
|
$1,000.000
|
$3,000.000
|
$2,000.000
|
$2,000.000
|
$1,500.000
|
$4,000.000
|
$1,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
545.000
|
$30.000
|
$31.000
|
$40.000
|
$32.550
|
$33.500
|
$35.000
|
$35.000
|
$70.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
545.000
|
$6.000
|
$10.000
|
$10.000
|
$10.500
|
$8.200
|
$10.000
|
$10.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
400.000
|
$25.000
|
$10.000
|
$20.000
|
$31.500
|
$39.950
|
$75.000
|
$30.000
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
400.000
|
$10.000
|
$5.000
|
$10.000
|
$10.500
|
$7.700
|
$10.000
|
$10.000
|
$12.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,385.000
|
$2.500
|
$3.000
|
$3.000
|
$2.800
|
$3.100
|
$3.000
|
$3.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,385.000
|
$1.000
|
$1.000
|
$1.000
|
$1.050
|
$0.620
|
$1.000
|
$1.000
|
$1.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
230.000
|
$40.000
|
$40.000
|
$50.000
|
$33.000
|
$80.000
|
$55.000
|
$65.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$20.000
|
$25.000
|
$24.000
|
$23.000
|
$25.000
|
$19.000
|
$25.000
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,650.000
|
$1,500.000
|
$1,800.000
|
$2,700.000
|
$1,525.000
|
$1,650.000
|
$1,800.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
600.000
|
$4.000
|
$3.000
|
$10.000
|
$3.000
|
$3.850
|
$6.000
|
$3.000
|
$5.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,000.000
|
$2,500.000
|
$2,600.000
|
$2,150.000
|
$2,325.000
|
$2,400.000
|
$2,400.000
|
$2,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$150.000
|
$600.000
|
$400.000
|
$220.000
|
$229.000
|
$300.000
|
$220.000
|
$200.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
2,236.000
|
$15.000
|
$10.000
|
$16.000
|
$9.000
|
$12.000
|
$17.000
|
$20.000
|
$9.000
|
|
|
GATE (TY 1)
|
EA
|
1.000
|
$1,000.000
|
$500.000
|
$1,000.000
|
$400.000
|
$500.000
|
$2,500.000
|
$550.000
|
$900.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$200.000
|
$300.000
|
$500.000
|
$235.000
|
$335.000
|
$130.000
|
$300.000
|
$490.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$500.000
|
$500.000
|
$600.000
|
$500.000
|
$800.000
|
$650.000
|
$815.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
1.000
|
$700.000
|
$400.000
|
$600.000
|
$330.000
|
$475.000
|
$350.000
|
$425.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$350.000
|
$350.000
|
$600.000
|
$330.000
|
$540.000
|
$500.000
|
$575.000
|
$650.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$175.000
|
$100.000
|
$100.000
|
$75.000
|
$200.010
|
$50.000
|
$100.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$15.000
|
$50.000
|
$50.000
|
$47.250
|
$56.010
|
$20.000
|
$30.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
4,435.000
|
$0.500
|
$0.550
|
$0.300
|
$0.550
|
$0.550
|
$0.500
|
$0.600
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
3,770.000
|
$0.500
|
$0.550
|
$0.300
|
$0.550
|
$0.550
|
$0.500
|
$0.600
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
260.000
|
$5.250
|
$5.000
|
$6.000
|
$4.200
|
$4.530
|
$4.000
|
$4.500
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
260.000
|
$5.250
|
$5.000
|
$6.000
|
$4.200
|
$4.530
|
$4.000
|
$4.500
|
$6.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
665.000
|
$0.600
|
$1.100
|
$1.000
|
$1.050
|
$1.160
|
$1.000
|
$1.100
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,330.000
|
$0.600
|
$1.100
|
$1.000
|
$1.050
|
$1.120
|
$1.000
|
$1.100
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
260.000
|
$1.500
|
$1.500
|
$4.000
|
$1.700
|
$2.000
|
$1.000
|
$2.000
|
$2.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
5,100.000
|
$0.750
|
$1.000
|
$0.500
|
$0.800
|
$0.820
|
$0.750
|
$1.000
|
$0.600
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
5,100.000
|
$0.750
|
$1.000
|
$0.500
|
$0.800
|
$0.820
|
$0.750
|
$1.000
|
$0.600
|
|
RE PM W/RET REQ TY II (W) 4" (SLD)
|
LF
|
580.000
|
$0.200
|
$1.250
|
$0.500
|
$1.050
|
$1.170
|
$1.000
|
$1.100
|
$0.600
|
|
RE PM W/RET REQ TY II (Y) 4" (SLD)
|
LF
|
580.000
|
$0.200
|
$1.250
|
$1.000
|
$1.050
|
$1.170
|
$1.000
|
$1.100
|
$0.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
66.000
|
$8.000
|
$9.000
|
$16.000
|
$7.350
|
$9.000
|
$7.000
|
$8.000
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,330.000
|
$0.500
|
$0.550
|
$2.000
|
$0.550
|
$0.590
|
$0.500
|
$0.550
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
10,200.000
|
$0.150
|
$0.250
|
$0.500
|
$0.200
|
$0.220
|
$0.200
|
$0.250
|
$0.050
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$5,000.000
|
$12,000.000
|
$21,000.000
|
$17,500.000
|
$10,000.000
|
$35,000.000
|
$20,000.000
|
|
Totals: |
$2,699,285.750
|
$2,474,844.690
|
$2,909,847.300
|
$2,964,576.790
|
$2,977,777.770
|
$3,317,097.000
|
$3,371,587.780
|
$3,596,208.220
|