|
|
EXCAVATION (ROADWAY)
|
CY
|
174,469.000
|
$20.000
|
$16.800
|
$18.560
|
$30.000
|
$28.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
986.000
|
$40.000
|
$30.000
|
$25.000
|
$22.000
|
$25.000
|
|
|
BACKFILL (TY A)
|
STA
|
391.000
|
$230.000
|
$200.000
|
$575.000
|
$375.000
|
$250.000
|
|
|
BLADING
|
HR
|
8.000
|
$150.000
|
$135.000
|
$150.000
|
$165.000
|
$200.000
|
|
|
SPEC EXCAV WORK (ORIGINAL)
|
CY
|
1,100.000
|
$20.000
|
$20.000
|
$25.000
|
$35.000
|
$30.000
|
|
|
FURNISHING AND PLACING TOPSOIL (6")
|
SY
|
52,286.000
|
$2.000
|
$1.500
|
$5.000
|
$7.750
|
$5.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
52,286.000
|
$0.300
|
$0.060
|
$0.100
|
$0.150
|
$0.100
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
52,286.000
|
$2.000
|
$0.330
|
$0.400
|
$0.400
|
$0.400
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
39,387.000
|
$5.000
|
$0.950
|
$1.650
|
$1.100
|
$1.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
723.000
|
$6.000
|
$7.000
|
$6.000
|
$7.500
|
$4.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
2,305.000
|
$50.000
|
$50.000
|
$42.000
|
$46.000
|
$35.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
12,815.000
|
$5.000
|
$2.000
|
$2.400
|
$3.000
|
$4.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
14.000
|
$490.000
|
$510.000
|
$750.000
|
$1,000.000
|
$1,100.000
|
|
|
CONC BOX CULV (9 FT X 5 FT)(EXTEND)
|
LF
|
8.000
|
$505.000
|
$1,580.000
|
$900.000
|
$2,000.000
|
$2,100.000
|
|
|
SET (TY I)(S= 9 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
4.000
|
$11,800.000
|
$11,200.000
|
$8,000.000
|
$27,000.000
|
$12,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,095.000
|
$700.000
|
$1,100.000
|
$3,500.000
|
$1,800.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,147,113.000
|
$930,000.000
|
$700,000.000
|
$910,000.000
|
$1,600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$10,000.000
|
$8,650.000
|
$3,000.000
|
$2,800.000
|
$17,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
420.000
|
$32.000
|
$32.000
|
$35.000
|
$44.000
|
$40.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
420.000
|
$10.000
|
$11.000
|
$5.000
|
$13.000
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
220.000
|
$10.000
|
$5.300
|
$6.000
|
$8.750
|
$12.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
220.000
|
$5.000
|
$1.100
|
$1.000
|
$3.500
|
$5.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
2,950.000
|
$110.000
|
$87.000
|
$105.000
|
$105.000
|
$100.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
2,450.000
|
$13.000
|
$12.300
|
$14.000
|
$6.500
|
$14.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
2,950.000
|
$15.000
|
$18.000
|
$17.000
|
$9.250
|
$18.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
4,120.000
|
$11.000
|
$13.000
|
$17.000
|
$11.000
|
$20.000
|
|
|
INTRSCT, DRVWAYS, & TURNOUT (ACP)
|
SY
|
2,089.000
|
$36.000
|
$20.000
|
$20.000
|
$50.000
|
$45.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
70,800.000
|
$0.140
|
$0.140
|
$0.160
|
$0.250
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
35,400.000
|
$0.150
|
$0.170
|
$0.160
|
$0.350
|
$0.400
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
21,650.000
|
$23.000
|
$25.700
|
$25.600
|
$33.000
|
$30.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
9.000
|
$1,800.000
|
$1,155.000
|
$1,540.000
|
$3,700.000
|
$1,250.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
21,650.000
|
$2.850
|
$3.350
|
$2.500
|
$4.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
35.000
|
$245.000
|
$250.000
|
$220.000
|
$1,200.000
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
35.000
|
$2,800.000
|
$2,700.000
|
$3,080.000
|
$4,500.000
|
$2,750.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$360.000
|
$250.000
|
$220.000
|
$500.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
4.000
|
$10,800.000
|
$8,100.000
|
$9,740.000
|
$10,500.000
|
$13,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$1,085.000
|
$720.000
|
$1,400.000
|
$1,200.000
|
$3,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
$1,800.000
|
$1,750.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$125.000
|
$110.000
|
$110.000
|
$350.000
|
$200.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$65.000
|
$90.000
|
$94.000
|
$250.000
|
$300.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
38.000
|
$37.000
|
$40.000
|
$33.000
|
$80.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
181.000
|
$41.000
|
$40.000
|
$33.000
|
$36.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
41.000
|
$23.000
|
$40.000
|
$40.000
|
$60.000
|
$30.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,323.000
|
$1.000
|
$2.100
|
$1.100
|
$1.000
|
$2.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
182.000
|
$8.500
|
$15.750
|
$13.200
|
$22.000
|
$17.000
|
|
REFL PAV MRK TY II (W) 36" (YLD TRI)
|
EA
|
15.000
|
$60.000
|
$42.000
|
$24.200
|
$27.000
|
$50.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
18,344.000
|
$1.000
|
$0.110
|
$0.330
|
$0.500
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
79,858.000
|
$0.400
|
$0.390
|
$0.330
|
$0.500
|
$0.450
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
27,824.000
|
$1.000
|
$0.110
|
$0.330
|
$0.500
|
$0.150
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
48,073.000
|
$0.750
|
$0.390
|
$0.330
|
$0.500
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$227.000
|
$362.000
|
$330.000
|
$400.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$288.000
|
$430.000
|
$330.000
|
$550.000
|
$500.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
124.000
|
$4.500
|
$5.250
|
$4.400
|
$3.750
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
951.000
|
$4.500
|
$4.350
|
$4.400
|
$3.750
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
120.000
|
$4.500
|
$5.250
|
$4.400
|
$3.750
|
$6.000
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
25,356.000
|
$125.000
|
$95.250
|
$96.300
|
$104.000
|
$125.000
|
|
|
SP MIXES SP-D SAC-B PG70-22 (LEVEL-UP)
|
TON
|
17,960.000
|
$125.000
|
$95.250
|
$96.300
|
$104.000
|
$128.000
|
|
|
TACK COAT
|
GAL
|
45,051.000
|
$4.000
|
$2.000
|
$2.000
|
$5.000
|
$3.550
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$12,000.000
|
$5,000.000
|
$20,000.000
|
$21,000.000
|
$14,000.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$9,400.000
|
$7,000.000
|
$10,000.000
|
$9,500.000
|
$17,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
250.000
|
$198.000
|
$100.000
|
$250.000
|
$500.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
90.000
|
$178.000
|
$10.000
|
$250.000
|
$650.000
|
$300.000
|
|
Totals: |
$12,774,848.750
|
$10,086,760.110
|
$10,674,159.360
|
$13,975,559.250
|
$14,892,365.050
|