PREPARING ROW
|
STA
|
16.000
|
$2,800.000
|
$2,600.000
|
$800.000
|
$5,600.000
|
$3,500.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
CY
|
1,302.000
|
$10.000
|
$2.000
|
$6.250
|
$15.000
|
$25.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,860.000
|
$10.000
|
$8.700
|
$11.000
|
$9.000
|
$25.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
6.000
|
$500.000
|
$595.000
|
$2,000.000
|
$150.000
|
$1,000.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
11,347.000
|
$8.000
|
$11.800
|
$15.500
|
$15.000
|
$25.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
16,101.000
|
$1.500
|
$1.700
|
$3.500
|
$2.250
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
8,051.000
|
$0.150
|
$0.120
|
$0.250
|
$0.120
|
$0.500
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
8,051.000
|
$0.150
|
$0.120
|
$0.250
|
$0.120
|
$0.500
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
16,101.000
|
$0.350
|
$0.350
|
$0.480
|
$0.320
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
645.000
|
$12.500
|
$1.000
|
$14.000
|
$25.000
|
$1.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
645.000
|
$1.000
|
$2.200
|
$4.250
|
$2.050
|
$2.000
|
|
|
FL BS (RDWY DEL) (TY A GR 1-2)
|
TON
|
2,677.000
|
$45.000
|
$45.000
|
$52.500
|
$48.000
|
$55.000
|
|
|
CEMENT
|
TON
|
93.000
|
$180.000
|
$220.000
|
$200.000
|
$185.000
|
$225.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
804.000
|
$3.750
|
$2.500
|
$13.250
|
$5.000
|
$15.000
|
|
|
CEMENT TREAT (NEW BASE)(12")
|
SY
|
4,353.000
|
$4.000
|
$2.500
|
$12.750
|
$3.500
|
$15.000
|
|
|
PRIME COAT (RC-250)
|
GAL
|
1,290.000
|
$4.000
|
$0.010
|
$22.500
|
$0.010
|
$10.000
|
|
|
ASPH (RC-250)
|
TON
|
6.000
|
$900.000
|
$1,800.000
|
$625.000
|
$1,400.000
|
$2,500.000
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
45.000
|
$120.000
|
$246.000
|
$575.000
|
$335.000
|
$500.000
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
42.000
|
$115.000
|
$254.000
|
$575.000
|
$375.000
|
$500.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
39.000
|
$115.000
|
$214.000
|
$575.000
|
$365.000
|
$275.000
|
|
|
ASPH (AC-15P, AC-10-2TR, OR CRS-2P)
|
TON
|
20.000
|
$900.000
|
$970.000
|
$3,500.000
|
$935.000
|
$2,500.000
|
|
|
CEM STABIL BKFL
|
CY
|
101.500
|
$200.000
|
$210.000
|
$225.000
|
$185.000
|
$225.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
449.000
|
$270.000
|
$247.500
|
$235.000
|
$215.000
|
$185.000
|
|
|
CL C CONC (ABUT)
|
CY
|
37.800
|
$1,000.000
|
$1,000.000
|
$800.000
|
$900.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
30.000
|
$1,000.000
|
$1,000.000
|
$850.000
|
$930.000
|
$1,200.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
8.400
|
$1,000.000
|
$1,000.000
|
$1,600.000
|
$980.000
|
$1,200.000
|
|
|
REINF CONC SLAB
|
SF
|
5,100.000
|
$20.000
|
$25.000
|
$16.000
|
$17.500
|
$24.000
|
|
|
APPROACH SLAB
|
CY
|
51.400
|
$450.000
|
$660.000
|
$500.000
|
$515.000
|
$600.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
594.000
|
$150.000
|
$150.000
|
$155.000
|
$160.000
|
$200.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
71.000
|
$400.000
|
$425.000
|
$335.000
|
$412.000
|
$550.000
|
|
|
RAIL (TY T223)
|
LF
|
332.000
|
$90.000
|
$100.000
|
$110.000
|
$93.000
|
$120.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
60.000
|
$75.000
|
$110.000
|
$105.000
|
$100.000
|
$80.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
90.000
|
$50.000
|
$71.500
|
$55.000
|
$72.000
|
$75.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$700.000
|
$825.000
|
$900.000
|
$720.000
|
$2,000.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$15,000.000
|
$20,000.000
|
$19,999.000
|
$15,500.000
|
$25,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
1.000
|
$500.000
|
$540.000
|
$2,000.000
|
$412.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$110,000.000
|
$110,000.000
|
$50,000.000
|
$210,000.000
|
$170,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$2,500.000
|
$1,600.000
|
$1,100.000
|
$1,900.000
|
$2,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
100.000
|
$35.000
|
$41.250
|
$32.500
|
$39.000
|
$1.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$8.800
|
$10.000
|
$8.250
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$15.000
|
$20.000
|
$25.000
|
$33.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$10.000
|
$5.000
|
$12.000
|
$8.250
|
$1.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
400.000
|
$6.000
|
$4.400
|
$12.750
|
$4.100
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,474.000
|
$3.000
|
$3.150
|
$3.250
|
$3.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,474.000
|
$1.000
|
$0.850
|
$2.000
|
$0.800
|
$1.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
133.000
|
$30.000
|
$78.000
|
$52.500
|
$40.000
|
$60.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
575.000
|
$23.000
|
$25.300
|
$27.250
|
$24.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,625.000
|
$1,843.750
|
$2,500.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
950.000
|
$3.000
|
$2.750
|
$2.000
|
$2.600
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,600.000
|
$2,695.000
|
$3,250.000
|
$2,500.000
|
$2,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$275.000
|
$200.000
|
$200.000
|
$500.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
567.000
|
$15.000
|
$14.850
|
$13.500
|
$14.000
|
$20.000
|
|
|
GATE (TY 1)
|
EA
|
2.000
|
$2,000.000
|
$935.000
|
$1,000.000
|
$900.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
4.000
|
$400.000
|
$430.000
|
$575.000
|
$400.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$100.000
|
$82.000
|
$200.000
|
$100.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$20.000
|
$16.500
|
$18.750
|
$16.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
10.000
|
$30.000
|
$30.000
|
$31.250
|
$28.000
|
$30.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
3,320.000
|
$0.750
|
$3.300
|
$1.510
|
$2.050
|
$4.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
3,320.000
|
$0.750
|
$3.300
|
$1.510
|
$2.050
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
82.000
|
$3.000
|
$27.500
|
$7.540
|
$10.300
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
190.000
|
$0.200
|
$3.300
|
$1.510
|
$4.100
|
$5.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
30.000
|
$120.000
|
$225.000
|
$250.000
|
$345.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$15,000.000
|
$7,000.000
|
$10,300.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
20.000
|
$250.000
|
$150.000
|
$175.000
|
$250.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
20.000
|
$45.000
|
$150.000
|
$350.000
|
$100.000
|
$200.000
|
|
Totals: |
$1,222,602.650
|
$1,320,204.740
|
$1,436,880.310
|
$1,483,779.760
|
$1,858,544.500
|