|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
240.000
|
$17.000
|
$20.000
|
$40.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,500.000
|
$8.000
|
$20.000
|
$35.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
37.000
|
$265.000
|
$450.000
|
$1,000.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
1,500.000
|
$30.000
|
$50.000
|
$40.000
|
|
|
BACKFILL (TY A)
|
STA
|
4.000
|
$275.000
|
$250.000
|
$500.000
|
|
|
BLADING
|
STA
|
41.000
|
$200.000
|
$250.000
|
$200.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
2,081.000
|
$1.100
|
$8.000
|
$2.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
1,041.000
|
$0.250
|
$0.500
|
$2.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
2,081.000
|
$0.700
|
$0.500
|
$2.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
1,041.000
|
$0.700
|
$0.500
|
$2.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
1,041.000
|
$0.700
|
$0.500
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
23.000
|
$10.000
|
$50.000
|
$10.000
|
|
|
CEMENT
|
TON
|
56.000
|
$240.000
|
$300.000
|
$500.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
3,278.000
|
$4.500
|
$8.000
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
49.000
|
$9.000
|
$8.000
|
$25.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
18,703.000
|
$6.000
|
$8.000
|
$6.500
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
387.000
|
$200.000
|
$350.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,000.000
|
$70.000
|
$80.000
|
$150.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
622.000
|
$8.000
|
$10.000
|
$14.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,658.000
|
$4.000
|
$10.000
|
$14.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$95,000.000
|
$100,000.000
|
$100,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$5,500.000
|
$8,500.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$35.000
|
$30.000
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$8.000
|
$15.000
|
$50.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
325.000
|
$35.000
|
$50.000
|
$60.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
16.000
|
$100.000
|
$150.000
|
$60.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
400.000
|
$3.000
|
$4.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
400.000
|
$1.000
|
$2.000
|
$4.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
16.000
|
$100.000
|
$150.000
|
$200.000
|
|
|
TURNOUTS (ACP)
|
SY
|
16.000
|
$80.000
|
$45.000
|
$80.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
144.000
|
$100.000
|
$125.000
|
$125.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
5,232.000
|
$0.250
|
$0.500
|
$2.500
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$300.000
|
$950.000
|
$500.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$350.000
|
$950.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$650.000
|
$1,000.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$800.000
|
$1,000.000
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$120.000
|
$50.000
|
$500.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,146.000
|
$1.000
|
$6.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
297.000
|
$1.000
|
$6.000
|
$2.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
1,455.000
|
$1.250
|
$1.000
|
$4.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
1,334.000
|
$1.000
|
$1.000
|
$4.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
3,699.000
|
$0.900
|
$3.000
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
176.000
|
$6.000
|
$20.000
|
$7.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,280.000
|
$0.700
|
$2.000
|
$1.250
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
5,832.000
|
$0.700
|
$2.000
|
$1.250
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
5,930.000
|
$0.700
|
$2.000
|
$1.250
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
14.000
|
$203.000
|
$250.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
14.000
|
$267.250
|
$250.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
4.000
|
$35.000
|
$500.000
|
$150.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
39.000
|
$3.600
|
$5.000
|
$8.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
260.000
|
$3.500
|
$5.000
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
5.000
|
$3.500
|
$5.000
|
$7.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
110.000
|
$4.000
|
$5.000
|
$6.000
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
6.000
|
$215.000
|
$200.000
|
$400.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
2,059.000
|
$155.000
|
$120.000
|
$250.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
658.000
|
$155.000
|
$140.000
|
$250.000
|
|
|
TACK COAT
|
GAL
|
284.000
|
$4.000
|
$10.000
|
$9.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
180.000
|
$109.000
|
$150.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
34.000
|
$225.000
|
$250.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$300.000
|
$500.000
|
$200.000
|
|
Totals: |
$1,025,662.100
|
$1,235,384.000
|
$1,610,972.000
|