|
|
EXCAVATION (CHANNEL)
|
CY
|
278.000
|
$17.000
|
$20.000
|
$12.000
|
$15.800
|
$35.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
158.000
|
$33.000
|
$50.000
|
$15.000
|
$29.000
|
$35.000
|
|
|
BACKFILL (TY A)
|
STA
|
110.000
|
$300.000
|
$265.000
|
$375.000
|
$295.000
|
$165.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
7,088.000
|
$1.000
|
$0.950
|
$0.900
|
$0.790
|
$0.800
|
|
|
VEGETATIVE WATERING
|
MG
|
78.000
|
$15.000
|
$20.000
|
$8.000
|
$8.000
|
$25.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
31.000
|
$120.000
|
$150.000
|
$170.000
|
$172.000
|
$250.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
60,418.000
|
$2.400
|
$3.000
|
$3.500
|
$2.000
|
$2.850
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
488.000
|
$135.000
|
$0.010
|
$144.000
|
$160.000
|
$152.000
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
6,483.000
|
$135.000
|
$147.000
|
$144.000
|
$160.000
|
$152.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,000.000
|
$50.000
|
$49.000
|
$45.000
|
$68.000
|
$60.000
|
|
|
PLANE ASPH CONC PAV (0" TO 3/4")
|
SY
|
967.000
|
$4.000
|
$10.000
|
$5.000
|
$10.000
|
$10.200
|
|
|
CL C CONC (RAC-R)
|
CY
|
36.000
|
$1,500.000
|
$1,250.000
|
$700.000
|
$575.000
|
$1,200.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
9.000
|
$500.000
|
$875.000
|
$500.000
|
$400.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
112.000
|
$150.000
|
$250.000
|
$150.000
|
$125.000
|
$230.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
54.000
|
$500.000
|
$500.000
|
$450.000
|
$440.000
|
$700.000
|
|
|
RAIL (TY T223)
|
LF
|
136.000
|
$100.000
|
$185.000
|
$90.000
|
$160.000
|
$130.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,600.000
|
$3,200.000
|
$2,800.000
|
$7,600.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$170,000.000
|
$90,000.000
|
$144,000.000
|
$132,000.000
|
$222,339.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$4,000.000
|
$5,500.000
|
$5,000.000
|
$2,337.500
|
$20,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
120.000
|
$30.000
|
$25.000
|
$24.000
|
$21.000
|
$21.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
120.000
|
$10.000
|
$8.500
|
$10.000
|
$10.000
|
$10.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
10.000
|
$80.000
|
$135.000
|
$150.000
|
$125.000
|
$95.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
800.000
|
$3.000
|
$3.500
|
$2.650
|
$2.350
|
$2.350
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
800.000
|
$1.000
|
$1.000
|
$0.750
|
$1.000
|
$1.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$75.000
|
$85.000
|
$90.000
|
$88.000
|
$80.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$20.000
|
$13.500
|
$10.000
|
$16.500
|
$15.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
360.000
|
$15.000
|
$15.750
|
$20.000
|
$20.000
|
$15.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
375.000
|
$24.000
|
$20.500
|
$23.000
|
$21.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,600.000
|
$1,500.000
|
$1,600.000
|
$1,460.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$3.500
|
$10.500
|
$3.000
|
$2.500
|
$4.800
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,400.000
|
$2,400.000
|
$2,650.000
|
$2,400.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$600.000
|
$210.000
|
$300.000
|
$250.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$11,000.000
|
$6,300.000
|
$10,000.000
|
$8,750.000
|
$13,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$3,000.000
|
$2,300.000
|
$2,600.000
|
$2,350.000
|
$4,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$525.000
|
$900.000
|
$800.000
|
$1,085.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$30.000
|
$15.750
|
$26.000
|
$24.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$35.000
|
$21.000
|
$35.000
|
$29.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
910.000
|
$0.300
|
$0.110
|
$2.500
|
$2.290
|
$3.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
2,916.000
|
$0.800
|
$0.820
|
$1.500
|
$1.400
|
$1.500
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
16,587.000
|
$0.800
|
$0.720
|
$1.500
|
$1.400
|
$1.500
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,575.000
|
$1.000
|
$1.050
|
$1.450
|
$1.300
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
470.000
|
$0.850
|
$0.780
|
$1.100
|
$1.000
|
$2.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
6,000.000
|
$0.350
|
$0.340
|
$0.440
|
$0.400
|
$0.800
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
70.000
|
$0.350
|
$1.050
|
$1.100
|
$1.000
|
$3.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,912.000
|
$0.350
|
$0.340
|
$0.330
|
$0.300
|
$1.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
67,440.000
|
$1.000
|
$0.890
|
$0.600
|
$0.540
|
$1.250
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
58,802.000
|
$1.000
|
$1.050
|
$0.600
|
$0.540
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
3.000
|
$200.000
|
$178.500
|
$220.000
|
$200.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
10.000
|
$400.000
|
$341.250
|
$500.000
|
$450.000
|
$700.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
3.000
|
$225.000
|
$215.250
|
$330.000
|
$300.000
|
$450.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
326.000
|
$3.000
|
$3.500
|
$3.300
|
$3.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,976.000
|
$3.000
|
$3.500
|
$3.300
|
$3.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
910.000
|
$0.450
|
$2.000
|
$1.100
|
$1.000
|
$1.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
120.000
|
$105.000
|
$100.000
|
$100.000
|
$115.000
|
$86.000
|
|
|
TMA (STATIONARY)
|
DAY
|
74.000
|
$250.000
|
$130.000
|
$200.000
|
$210.000
|
$225.000
|
|
Totals: |
$1,858,650.300
|
$1,834,284.720
|
$1,894,653.210
|
$1,925,456.300
|
$2,242,213.100
|