PREPARING ROW
|
STA
|
27.060
|
$1,500.000
|
$1,000.000
|
$1,850.000
|
$3,500.000
|
$2,000.000
|
$1,500.000
|
$2,800.000
|
$3,500.000
|
|
|
REMOVING STAB BASE & ASPH PAV (7"-12")
|
SY
|
6,143.000
|
$6.000
|
$3.250
|
$4.000
|
$2.800
|
$5.000
|
$10.000
|
$4.000
|
$13.800
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,691.000
|
$4.000
|
$9.000
|
$7.000
|
$7.250
|
$7.500
|
$15.000
|
$10.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
6.060
|
$200.000
|
$750.000
|
$400.000
|
$700.000
|
$2,000.000
|
$500.000
|
$650.000
|
$250.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
19,581.000
|
$11.000
|
$9.250
|
$7.150
|
$7.250
|
$12.000
|
$10.000
|
$16.000
|
$7.500
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
11,391.000
|
$2.500
|
$2.500
|
$1.850
|
$2.000
|
$1.900
|
$2.500
|
$3.000
|
$2.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
5,697.000
|
$0.150
|
$0.200
|
$0.200
|
$0.200
|
$0.210
|
$0.300
|
$0.500
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
5,697.000
|
$0.150
|
$0.200
|
$0.200
|
$0.200
|
$0.230
|
$0.300
|
$0.500
|
$1.000
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
11,391.000
|
$0.250
|
$0.300
|
$0.310
|
$0.400
|
$0.300
|
$0.300
|
$0.500
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
250.800
|
$12.000
|
$15.000
|
$8.000
|
$8.000
|
$25.000
|
$10.000
|
$1.000
|
$80.000
|
|
|
CEMENT
|
TON
|
128.000
|
$180.000
|
$145.000
|
$150.000
|
$180.000
|
$192.000
|
$180.000
|
$200.000
|
$150.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
9,611.000
|
$3.000
|
$5.650
|
$2.250
|
$1.750
|
$5.500
|
$2.150
|
$6.000
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
663.000
|
$6.000
|
$5.000
|
$5.000
|
$3.300
|
$12.000
|
$10.000
|
$8.000
|
$6.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
4,828.000
|
$4.000
|
$3.820
|
$6.000
|
$3.550
|
$3.720
|
$4.500
|
$6.000
|
$6.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
116.000
|
$130.000
|
$162.000
|
$245.000
|
$165.000
|
$162.330
|
$350.000
|
$200.000
|
$225.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
58.000
|
$150.000
|
$171.000
|
$150.000
|
$200.000
|
$175.160
|
$217.000
|
$180.000
|
$200.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
4,054.000
|
$110.000
|
$79.100
|
$100.000
|
$100.000
|
$83.170
|
$106.000
|
$90.000
|
$120.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
1,323.000
|
$110.000
|
$84.400
|
$104.000
|
$100.000
|
$83.330
|
$115.750
|
$95.000
|
$100.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,302.000
|
$4.000
|
$5.750
|
$3.000
|
$5.000
|
$10.000
|
$10.000
|
$4.000
|
$4.500
|
|
|
CEM STABIL BKFL
|
CY
|
99.900
|
$160.000
|
$180.000
|
$200.000
|
$225.000
|
$197.000
|
$180.000
|
$200.000
|
$220.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
5.600
|
$350.000
|
$500.000
|
$250.000
|
$350.000
|
$450.000
|
$250.000
|
$200.000
|
$220.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,199.000
|
$35.000
|
$17.950
|
$20.000
|
$35.000
|
$24.000
|
$35.000
|
$30.000
|
$12.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
678.000
|
$200.000
|
$189.000
|
$185.000
|
$195.000
|
$193.000
|
$255.000
|
$170.000
|
$200.000
|
|
|
CL A CONC (PLUG)
|
EA
|
2.000
|
$450.000
|
$1,000.000
|
$1,000.000
|
$750.000
|
$500.000
|
$1,000.000
|
$600.000
|
$450.000
|
|
|
CL C CONC (ABUT)
|
CY
|
50.800
|
$1,000.000
|
$725.000
|
$800.000
|
$840.000
|
$925.000
|
$900.000
|
$1,000.000
|
$1,300.000
|
|
|
CL C CONC (BENT)
|
CY
|
57.200
|
$650.000
|
$985.000
|
$800.000
|
$850.000
|
$825.000
|
$817.000
|
$1,000.000
|
$1,000.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$925.000
|
$1,000.000
|
$800.000
|
$1,400.000
|
$1,000.000
|
$1,500.000
|
$500.000
|
$500.000
|
|
|
REINF CONC SLAB
|
SF
|
8,280.000
|
$20.000
|
$16.250
|
$20.000
|
$17.000
|
$19.000
|
$17.000
|
$24.000
|
$19.000
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$500.000
|
$510.000
|
$575.000
|
$475.000
|
$475.000
|
$450.000
|
$600.000
|
$500.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,071.000
|
$140.000
|
$145.000
|
$140.000
|
$126.000
|
$133.000
|
$151.000
|
$180.000
|
$136.610
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
230.200
|
$122.000
|
$105.000
|
$125.000
|
$160.000
|
$128.000
|
$150.000
|
$150.000
|
$99.570
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
35.000
|
$600.000
|
$450.000
|
$400.000
|
$460.000
|
$425.000
|
$400.000
|
$450.000
|
$450.000
|
|
|
RAIL (TY T223)
|
LF
|
396.000
|
$90.000
|
$95.000
|
$90.000
|
$76.000
|
$100.000
|
$100.000
|
$100.000
|
$120.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
91.000
|
$75.000
|
$95.000
|
$80.000
|
$70.000
|
$90.000
|
$110.000
|
$80.000
|
$60.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
217.000
|
$45.000
|
$35.000
|
$42.000
|
$38.000
|
$37.500
|
$35.000
|
$60.000
|
$40.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
28.000
|
$60.000
|
$60.000
|
$55.000
|
$65.000
|
$66.000
|
$45.000
|
$70.000
|
$60.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
20.000
|
$90.000
|
$78.000
|
$100.000
|
$114.000
|
$113.000
|
$80.000
|
$90.000
|
$112.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$720.000
|
$600.000
|
$545.000
|
$615.000
|
$550.000
|
$525.000
|
$625.000
|
$710.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$800.000
|
$950.000
|
$700.000
|
$745.000
|
$680.000
|
$925.000
|
$800.000
|
$1,160.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,700.000
|
$1,100.000
|
$2,500.000
|
$1,650.000
|
$1,400.000
|
$1,625.000
|
$1,800.000
|
$3,000.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
88.000
|
$50.000
|
$17.000
|
$60.000
|
$26.000
|
$45.000
|
$10.000
|
$40.000
|
$10.000
|
|
|
REMOV STR (PIPE)
|
LF
|
174.000
|
$10.000
|
$9.000
|
$10.000
|
$16.500
|
$14.000
|
$10.000
|
$20.000
|
$15.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$70,000.000
|
$40,000.000
|
$35,000.000
|
$15,000.000
|
$35,000.000
|
$50,000.000
|
$75,000.000
|
$150,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$226,000.000
|
$175,000.000
|
$150,000.000
|
$145,000.000
|
$217,000.000
|
$100,000.000
|
$175,000.000
|
$259,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$5,000.000
|
$1,750.000
|
$1,000.000
|
$1,700.000
|
$1,700.000
|
$1,000.000
|
$4,000.000
|
$5,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
356.000
|
$40.000
|
$28.000
|
$29.000
|
$27.500
|
$27.750
|
$25.000
|
$40.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
356.000
|
$6.000
|
$10.000
|
$5.000
|
$9.850
|
$10.500
|
$10.000
|
$20.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$22.000
|
$28.000
|
$22.000
|
$28.800
|
$21.000
|
$25.000
|
$10.000
|
$6.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$6.000
|
$10.000
|
$5.000
|
$9.800
|
$10.600
|
$5.000
|
$5.000
|
$1.500
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
75.000
|
$35.000
|
$35.000
|
$40.000
|
$34.000
|
$50.000
|
$50.000
|
$20.000
|
$99.900
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
180.000
|
$180.000
|
$45.000
|
$45.000
|
$100.000
|
$50.000
|
$10.000
|
$20.000
|
$75.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,337.000
|
$3.000
|
$2.750
|
$2.650
|
$2.900
|
$2.500
|
$3.000
|
$4.000
|
$4.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,337.000
|
$1.100
|
$1.000
|
$0.500
|
$1.200
|
$1.050
|
$1.000
|
$2.000
|
$1.500
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
2,700.000
|
$20.000
|
$12.000
|
$12.000
|
$12.000
|
$6.500
|
$17.000
|
$16.000
|
$12.000
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$25.000
|
$12.000
|
$12.000
|
$20.000
|
$6.500
|
$35.000
|
$16.000
|
$10.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,850.000
|
$15.000
|
$6.000
|
$4.000
|
$5.000
|
$3.250
|
$10.000
|
$6.000
|
$12.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
180.000
|
$20.000
|
$6.000
|
$4.000
|
$5.000
|
$3.250
|
$35.000
|
$6.000
|
$10.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
2,700.000
|
$20.000
|
$12.000
|
$12.000
|
$12.000
|
$6.500
|
$15.000
|
$16.000
|
$7.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$25.000
|
$12.000
|
$12.000
|
$20.000
|
$6.500
|
$25.000
|
$16.000
|
$8.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
406.000
|
$45.000
|
$34.550
|
$25.000
|
$35.000
|
$58.000
|
$35.000
|
$60.000
|
$50.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
625.000
|
$25.000
|
$24.000
|
$20.000
|
$25.000
|
$20.600
|
$17.700
|
$19.000
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,700.000
|
$1,600.000
|
$1,500.000
|
$1,650.000
|
$1,009.000
|
$1,325.000
|
$1,400.000
|
$1,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
875.000
|
$4.000
|
$2.000
|
$3.500
|
$4.400
|
$3.120
|
$3.000
|
$4.000
|
$10.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,700.000
|
$2,350.000
|
$2,300.000
|
$2,475.000
|
$1,987.000
|
$2,400.000
|
$2,600.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$250.000
|
$200.000
|
$360.000
|
$275.000
|
$234.000
|
$200.000
|
$400.000
|
$300.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
226.000
|
$10.000
|
$15.000
|
$14.000
|
$14.000
|
$13.000
|
$17.000
|
$15.000
|
$15.000
|
|
|
GATE (TY 1)
|
EA
|
2.000
|
$600.000
|
$1,000.000
|
$850.000
|
$900.000
|
$832.000
|
$1,000.000
|
$200.000
|
$600.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
16.000
|
$500.000
|
$425.000
|
$450.000
|
$450.000
|
$368.000
|
$570.000
|
$400.000
|
$100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$90.000
|
$150.000
|
$85.000
|
$135.000
|
$100.000
|
$100.000
|
$150.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$40.000
|
$30.000
|
$23.000
|
$70.000
|
$13.500
|
$24.000
|
$30.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
4.000
|
$75.000
|
$70.000
|
$55.000
|
$98.000
|
$56.250
|
$50.000
|
$55.000
|
$70.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
20.000
|
$15.000
|
$10.000
|
$10.000
|
$76.000
|
$6.000
|
$10.000
|
$10.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
14.000
|
$50.000
|
$49.000
|
$36.000
|
$84.000
|
$21.500
|
$29.000
|
$30.000
|
$25.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
4,972.000
|
$0.150
|
$0.800
|
$0.830
|
$0.820
|
$0.570
|
$0.750
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
5,172.000
|
$0.150
|
$0.800
|
$0.830
|
$0.820
|
$0.570
|
$0.750
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
440.000
|
$0.500
|
$1.100
|
$1.100
|
$1.100
|
$3.120
|
$1.000
|
$4.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
440.000
|
$0.500
|
$1.100
|
$1.100
|
$1.100
|
$3.120
|
$1.000
|
$4.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
249.000
|
$2.000
|
$2.000
|
$2.000
|
$1.200
|
$4.000
|
$1.000
|
$2.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
249.000
|
$2.000
|
$2.000
|
$2.000
|
$1.200
|
$4.000
|
$1.000
|
$2.000
|
$0.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
12.000
|
$5.750
|
$6.600
|
$6.500
|
$6.600
|
$26.000
|
$6.000
|
$26.000
|
$3.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
440.000
|
$0.250
|
$1.100
|
$1.100
|
$1.100
|
$2.080
|
$1.000
|
$3.000
|
$1.500
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
440.000
|
$0.250
|
$1.100
|
$1.100
|
$1.100
|
$2.080
|
$1.000
|
$3.000
|
$1.200
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
5,348.000
|
$0.500
|
$1.750
|
$1.750
|
$1.750
|
$1.400
|
$1.600
|
$2.000
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
70.000
|
$0.600
|
$1.750
|
$1.750
|
$1.750
|
$1.600
|
$1.600
|
$2.000
|
$1.000
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
5,008.000
|
$0.700
|
$1.750
|
$1.750
|
$1.750
|
$1.400
|
$1.600
|
$2.000
|
$1.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$125.000
|
$85.000
|
$90.000
|
$100.000
|
$101.000
|
$100.000
|
$100.000
|
$100.000
|
|
|
REFL PAV MRKR TY II A-A
|
EA
|
67.000
|
$4.000
|
$5.500
|
$5.500
|
$5.500
|
$10.500
|
$5.000
|
$12.000
|
$35.000
|
|
Totals: |
$2,475,603.250
|
$2,029,446.310
|
$2,070,954.230
|
$2,108,686.430
|
$2,183,188.800
|
$2,330,410.400
|
$2,558,077.300
|
$2,662,838.224
|