BACKFILL (TY A)
|
STA
|
368.000
|
$220.000
|
$315.000
|
$450.000
|
|
|
BACKFILL (TY A)
|
LF
|
19,749.000
|
$1.100
|
$1.660
|
$4.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
35,808.000
|
$0.130
|
$0.120
|
$0.110
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
71,617.000
|
$0.700
|
$0.630
|
$0.750
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
35,808.000
|
$0.680
|
$0.680
|
$0.660
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
35,808.000
|
$0.680
|
$0.630
|
$0.650
|
|
|
VEGETATIVE WATERING
|
MG
|
1,970.000
|
$12.000
|
$0.010
|
$25.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
57,497.000
|
$2.850
|
$0.010
|
$5.000
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
796.000
|
$160.000
|
$192.000
|
$185.000
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
12,472.000
|
$160.000
|
$192.000
|
$185.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
11,200.000
|
$54.000
|
$59.000
|
$65.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
10,000.000
|
$31.000
|
$42.000
|
$40.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
1,476.000
|
$2.000
|
$7.000
|
$10.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
17,736.000
|
$2.250
|
$4.500
|
$5.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
28,433.000
|
$3.000
|
$2.500
|
$3.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL3)
|
LF
|
516.000
|
$25.000
|
$40.000
|
$45.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$450,355.000
|
$602,265.000
|
$670,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$20,000.000
|
$43,000.000
|
$50,000.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
89,078.000
|
$0.180
|
$0.110
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
711.000
|
$1.200
|
$1.250
|
$2.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
16,800.000
|
$1.400
|
$1.500
|
$2.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
15,221.000
|
$1.450
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
7,110.000
|
$0.850
|
$0.920
|
$0.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
150.000
|
$5.500
|
$7.450
|
$6.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
10,957.000
|
$0.350
|
$0.460
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
12,449.000
|
$0.600
|
$0.640
|
$0.700
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
50,376.000
|
$0.550
|
$0.640
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
17,851.000
|
$0.350
|
$0.450
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
49,796.000
|
$0.570
|
$0.630
|
$0.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
1.000
|
$200.000
|
$250.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$300.000
|
$390.000
|
$400.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
54.000
|
$3.500
|
$3.750
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
50.000
|
$3.050
|
$3.750
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,009.000
|
$3.150
|
$3.750
|
$5.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
8,331.000
|
$3.100
|
$3.550
|
$5.000
|
|
|
FRICTIONAL ASPH SURF PRESERV TRTMT
|
SY
|
36,189.000
|
$1.700
|
$2.250
|
$5.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
1,950.000
|
$110.000
|
$188.500
|
$150.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
1,973.000
|
$107.000
|
$183.000
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
5.000
|
$90.000
|
$75.000
|
$1,800.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
14.000
|
$15,000.000
|
$5,300.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
97.000
|
$175.000
|
$395.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$150.000
|
$360.000
|
$300.000
|
|
Totals: |
$5,034,660.330
|
$6,035,177.890
|
$6,999,799.310
|