PREPARING ROW
|
STA
|
22.560
|
$1,000.000
|
$1,100.000
|
$1,500.000
|
$1,000.000
|
$1,000.000
|
$7,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
311.000
|
$12.000
|
$16.500
|
$12.000
|
$20.000
|
$16.000
|
$50.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,697.000
|
$8.000
|
$10.000
|
$10.000
|
$25.000
|
$15.000
|
$15.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
1,012.000
|
$25.000
|
$13.500
|
$16.000
|
$25.000
|
$24.000
|
$26.000
|
|
|
BACKFILL (TY A)
|
STA
|
72.050
|
$300.000
|
$225.000
|
$130.000
|
$350.000
|
$300.000
|
$400.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
7,539.000
|
$2.000
|
$2.150
|
$1.350
|
$1.000
|
$1.750
|
$2.500
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
8,581.000
|
$0.200
|
$0.200
|
$0.160
|
$0.500
|
$0.160
|
$0.200
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
17,142.000
|
$0.850
|
$0.820
|
$0.700
|
$0.750
|
$0.700
|
$0.750
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
8,581.000
|
$0.650
|
$0.720
|
$0.580
|
$0.500
|
$0.700
|
$0.630
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
8,581.000
|
$0.650
|
$0.700
|
$0.540
|
$0.500
|
$0.700
|
$0.630
|
|
|
VEGETATIVE WATERING
|
MG
|
402.000
|
$11.500
|
$1.000
|
$5.000
|
$1.000
|
$30.000
|
$22.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
17.000
|
$175.000
|
$260.000
|
$250.000
|
$250.000
|
$200.000
|
$250.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
959.000
|
$3.400
|
$4.250
|
$11.000
|
$4.500
|
$13.000
|
$20.000
|
|
|
CEMENT
|
TON
|
17.000
|
$152.000
|
$205.000
|
$200.000
|
$200.000
|
$375.000
|
$250.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
959.000
|
$3.150
|
$3.250
|
$8.000
|
$4.500
|
$15.000
|
$20.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
150.000
|
$3.700
|
$9.500
|
$12.000
|
$5.000
|
$8.000
|
$15.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
8,125.000
|
$3.050
|
$4.250
|
$5.000
|
$5.000
|
$4.250
|
$5.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
193.000
|
$111.000
|
$210.000
|
$160.000
|
$250.000
|
$200.000
|
$250.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,000.000
|
$55.000
|
$48.000
|
$50.000
|
$100.000
|
$70.000
|
$80.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,758.000
|
$66.000
|
$60.000
|
$65.000
|
$125.000
|
$72.000
|
$85.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,911.000
|
$2.200
|
$3.850
|
$4.000
|
$2.500
|
$2.750
|
$2.500
|
|
|
PLANE ASPH CONC PAV (2 1/2")
|
SY
|
5,726.000
|
$3.200
|
$3.950
|
$4.250
|
$3.500
|
$7.500
|
$2.500
|
|
|
PLANE ASPH CONC PAV (0"- 2 1/2")
|
SY
|
3,667.000
|
$5.000
|
$4.100
|
$4.250
|
$3.500
|
$7.500
|
$2.500
|
|
|
CL C CONC (COLLAR)
|
EA
|
4.000
|
$720.000
|
$1,500.000
|
$700.000
|
$900.000
|
$2,500.000
|
$2,500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
60.000
|
$480.000
|
$490.000
|
$450.000
|
$800.000
|
$700.000
|
$770.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
127.000
|
$480.000
|
$510.000
|
$450.000
|
$600.000
|
$825.000
|
$830.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
616.000
|
$162.000
|
$265.000
|
$160.000
|
$300.000
|
$180.000
|
$220.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
6.000
|
$55.000
|
$75.000
|
$75.000
|
$70.000
|
$165.000
|
$190.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
12.000
|
$98.000
|
$100.000
|
$125.000
|
$90.000
|
$255.000
|
$290.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
16.000
|
$101.000
|
$120.000
|
$200.000
|
$125.000
|
$300.000
|
$340.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$1,100.000
|
$900.000
|
$1,200.000
|
$1,350.000
|
$1,500.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,800.000
|
$2,000.000
|
$2,000.000
|
$2,400.000
|
$2,800.000
|
$3,200.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$4,000.000
|
$4,500.000
|
$5,000.000
|
$6,000.000
|
$3,900.000
|
$4,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$33,000.000
|
$90,000.000
|
$70,000.000
|
$140,000.000
|
$211,298.000
|
$220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$20,000.000
|
$5,500.000
|
$30,000.000
|
$5,000.000
|
$47,073.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
240.000
|
$28.000
|
$27.500
|
$30.000
|
$30.000
|
$30.000
|
$32.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
120.000
|
$32.000
|
$32.000
|
$35.000
|
$30.000
|
$35.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
360.000
|
$10.500
|
$10.000
|
$9.000
|
$10.000
|
$10.000
|
$10.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
100.000
|
$20.000
|
$25.000
|
$25.000
|
$90.000
|
$18.250
|
$25.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
100.000
|
$75.000
|
$75.000
|
$85.000
|
$100.000
|
$96.000
|
$70.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,650.000
|
$3.000
|
$2.600
|
$3.500
|
$2.500
|
$3.150
|
$3.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,650.000
|
$1.500
|
$0.800
|
$1.000
|
$1.000
|
$1.100
|
$1.700
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
100.000
|
$95.000
|
$100.000
|
$125.000
|
$100.000
|
$101.000
|
$95.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
375.000
|
$20.000
|
$23.000
|
$20.000
|
$21.000
|
$24.000
|
$21.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,528.000
|
$1,700.000
|
$1,600.000
|
$1,700.000
|
$1,800.000
|
$1,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$2.450
|
$4.400
|
$3.000
|
$6.000
|
$3.200
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$150.000
|
$165.000
|
$150.000
|
$200.000
|
$160.000
|
$150.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,642.000
|
$2,725.000
|
$2,600.000
|
$2,700.000
|
$3,200.000
|
$3,000.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
1.000
|
$410.000
|
$825.000
|
$525.000
|
$1,000.000
|
$900.000
|
$850.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
1.000
|
$52.000
|
$415.000
|
$525.000
|
$600.000
|
$500.000
|
$530.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$115.000
|
$85.000
|
$200.000
|
$100.000
|
$200.000
|
$420.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
2.000
|
$55.000
|
$72.000
|
$135.000
|
$75.000
|
$150.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
16.000
|
$26.000
|
$50.000
|
$35.000
|
$75.000
|
$38.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
8.000
|
$30.000
|
$50.000
|
$35.000
|
$75.000
|
$38.000
|
$35.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
88.000
|
$0.820
|
$1.200
|
$2.000
|
$1.000
|
$1.250
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
540.000
|
$0.550
|
$1.200
|
$2.000
|
$1.000
|
$1.250
|
$0.600
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
584.000
|
$1.450
|
$1.400
|
$2.000
|
$4.000
|
$1.750
|
$0.700
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
2,425.000
|
$1.300
|
$1.400
|
$2.000
|
$4.000
|
$1.650
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,372.000
|
$0.880
|
$1.100
|
$1.000
|
$1.500
|
$1.200
|
$1.300
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
2.000
|
$270.000
|
$330.000
|
$500.000
|
$400.000
|
$525.000
|
$700.000
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
632.000
|
$0.100
|
$0.720
|
$0.300
|
$1.000
|
$0.350
|
$0.420
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
632.000
|
$0.100
|
$0.720
|
$0.300
|
$1.000
|
$0.350
|
$0.420
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,264.000
|
$0.200
|
$0.720
|
$0.220
|
$1.000
|
$0.300
|
$0.320
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
14,356.000
|
$0.350
|
$0.550
|
$0.380
|
$0.600
|
$0.450
|
$0.600
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,336.000
|
$0.650
|
$0.880
|
$0.440
|
$1.000
|
$0.550
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
9,292.000
|
$0.400
|
$0.550
|
$0.400
|
$0.600
|
$0.430
|
$0.600
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
86.000
|
$12.000
|
$16.500
|
$15.000
|
$20.000
|
$16.000
|
$20.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
12.000
|
$33.000
|
$66.000
|
$55.000
|
$70.000
|
$59.000
|
$75.000
|
|
REFL PAV MRKR TY I-R
|
EA
|
28.000
|
$7.500
|
$5.500
|
$4.000
|
$5.000
|
$5.000
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
270.000
|
$3.150
|
$4.400
|
$4.000
|
$5.000
|
$4.000
|
$5.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
120.000
|
$3.720
|
$4.400
|
$4.000
|
$5.000
|
$4.000
|
$5.500
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
855.000
|
$100.000
|
$116.000
|
$115.000
|
$150.000
|
$142.000
|
$165.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
3,213.000
|
$108.000
|
$107.000
|
$125.000
|
$150.000
|
$162.000
|
$155.000
|
|
|
TACK COAT
|
GAL
|
173.000
|
$3.600
|
$3.500
|
$5.000
|
$5.000
|
$3.150
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
280.000
|
$102.000
|
$100.000
|
$150.000
|
$150.000
|
$85.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
120.000
|
$200.000
|
$200.000
|
$200.000
|
$189.000
|
$326.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
60.000
|
$100.000
|
$200.000
|
$1.000
|
$148.000
|
$326.000
|
$20.000
|
|
Totals: |
$1,375,049.820
|
$1,495,511.900
|
$1,553,066.680
|
$2,095,150.300
|
$2,113,433.270
|
$2,366,966.520
|