|
|
REMOVING CONC (CURB)
|
LF
|
56.000
|
$16.140
|
$45.000
|
$25.000
|
$50.000
|
$14.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
10.000
|
$22.690
|
$55.000
|
$52.000
|
$50.000
|
$80.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
430.000
|
$3.650
|
$15.000
|
$9.000
|
$10.000
|
$9.000
|
|
|
BLOCK SODDING
|
SY
|
430.000
|
$4.960
|
$12.000
|
$9.000
|
$10.000
|
$11.000
|
|
|
VEGETATIVE WATERING
|
MG
|
4.600
|
$5.430
|
$240.000
|
$300.000
|
$250.000
|
$1.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
287.000
|
$61.950
|
$125.000
|
$350.000
|
$65.000
|
$110.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
16.100
|
$253.700
|
$500.000
|
$500.000
|
$350.000
|
$695.000
|
|
|
CL A CONC (MISC)
|
CY
|
15.500
|
$760.190
|
$1,150.000
|
$850.000
|
$1,500.000
|
$1,149.000
|
|
|
CL A CONC (MEDIAN)
|
CY
|
48.300
|
$357.000
|
$1,150.000
|
$850.000
|
$1,500.000
|
$1,149.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$59,154.170
|
$97,000.000
|
$68,000.000
|
$80,000.000
|
$69,225.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$9,891.300
|
$5,000.000
|
$5,900.000
|
$8,500.000
|
$1,100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
100.000
|
$3.740
|
$4.000
|
$5.000
|
$4.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
100.000
|
$1.400
|
$1.000
|
$5.000
|
$2.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
70.000
|
$4.900
|
$8.000
|
$35.000
|
$18.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
70.000
|
$1.270
|
$1.000
|
$25.000
|
$9.000
|
$54.000
|
|
|
CONC CURB (TY II)
|
LF
|
814.000
|
$17.640
|
$40.000
|
$29.000
|
$55.000
|
$199.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
224.000
|
$113.070
|
$180.000
|
$189.000
|
$125.000
|
$132.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
557.000
|
$78.360
|
$110.000
|
$125.000
|
$65.000
|
$2,542.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
19.000
|
$1,995.000
|
$3,500.000
|
$1,800.000
|
$3,000.000
|
$2,542.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
7.000
|
$3,465.000
|
$3,900.000
|
$1,822.000
|
$3,000.000
|
$2,542.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$2,821.370
|
$5,000.000
|
$2,500.000
|
$3,000.000
|
$2,542.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
2.000
|
$1,824.970
|
$4,000.000
|
$2,256.000
|
$3,000.000
|
$2,542.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
3.000
|
$2,472.520
|
$4,000.000
|
$2,514.000
|
$3,000.000
|
$2,542.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
394.000
|
$35.240
|
$19.000
|
$25.000
|
$20.000
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
401.000
|
$38.000
|
$50.000
|
$65.000
|
$55.000
|
$46.000
|
|
|
CONDT (RM) (1 1/2")
|
LF
|
20.000
|
$47.250
|
$50.000
|
$29.000
|
$85.000
|
$50.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
795.000
|
$2.630
|
$3.500
|
$8.000
|
$3.500
|
$3.000
|
|
|
GROUND BOX TY A (122311)
|
EA
|
1.000
|
$708.750
|
$625.000
|
$1,599.000
|
$1,000.000
|
$594.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$1,252.400
|
$1,200.000
|
$2,500.000
|
$1,500.000
|
$1,155.000
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$420.000
|
$500.000
|
$250.000
|
$550.000
|
$462.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
1.000
|
$640.500
|
$1,400.000
|
$900.000
|
$1,500.000
|
$495.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$111.050
|
$275.000
|
$500.000
|
$250.000
|
$165.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
494.000
|
$0.990
|
$1.100
|
$5.000
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,737.000
|
$7.480
|
$6.750
|
$8.000
|
$10.000
|
$7.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$137.640
|
$160.000
|
$175.000
|
$250.000
|
$154.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
1.000
|
$210.000
|
$225.000
|
$225.000
|
$250.000
|
$220.000
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
494.000
|
$0.550
|
$1.100
|
$3.000
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
1,737.000
|
$6.300
|
$3.500
|
$5.000
|
$5.000
|
$3.000
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
4.000
|
$78.750
|
$60.000
|
$150.000
|
$250.000
|
$61.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
1.000
|
$91.600
|
$110.000
|
$200.000
|
$250.000
|
$110.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,167.000
|
$0.130
|
$1.100
|
$3.000
|
$2.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
1,167.000
|
$0.110
|
$2.200
|
$4.000
|
$3.000
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
48.000
|
$3.300
|
$5.500
|
$17.000
|
$6.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
159.000
|
$0.470
|
$1.000
|
$7.000
|
$2.000
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
141.000
|
$2.100
|
$2.000
|
$12.000
|
$3.000
|
$2.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
449.000
|
$3.660
|
$3.000
|
$12.000
|
$4.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
3.000
|
$60.250
|
$115.000
|
$250.000
|
$250.000
|
$110.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,167.000
|
$0.110
|
$1.100
|
$2.000
|
$2.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
494.000
|
$0.210
|
$1.100
|
$2.000
|
$2.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,737.000
|
$2.360
|
$1.100
|
$4.000
|
$2.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$24.070
|
$55.000
|
$100.000
|
$250.000
|
$55.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
1.000
|
$19.010
|
$110.000
|
$200.000
|
$250.000
|
$110.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
3.000
|
$29,230.620
|
$6,500.000
|
$30,333.000
|
$15,000.000
|
$6,050.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
22.000
|
$682.500
|
$1,100.000
|
$600.000
|
$1,250.000
|
$1,018.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
2,627.000
|
$1.840
|
$3.000
|
$2.000
|
$4.000
|
$3.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
|
LF
|
2,715.000
|
$3.150
|
$4.500
|
$2.000
|
$4.000
|
$4.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
22.000
|
$2,625.000
|
$3,500.000
|
$900.000
|
$4,000.000
|
$3,553.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
22.000
|
$1,680.000
|
$1,500.000
|
$650.000
|
$1,850.000
|
$1,540.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
3.000
|
$2,984.280
|
$2,750.000
|
$4,500.000
|
$4,000.000
|
$2,750.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,280.000
|
$7,500.000
|
$1,256.000
|
$12,500.000
|
$1.000
|
|
|
TMA (STATIONARY)
|
DAY
|
80.000
|
$196.000
|
$90.000
|
$500.000
|
$250.000
|
$1.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$215.030
|
$90.000
|
$2,000.000
|
$850.000
|
$1.000
|
|
Totals: |
$653,255.083
|
$783,827.950
|
$815,700.000
|
$844,477.500
|
$2,137,940.300
|