|
|
RIPRAP (CONC)(6 IN)
|
CY
|
9.000
|
$1,122.000
|
$1,200.000
|
$900.000
|
$1,290.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$59,085.550
|
$80,000.000
|
$70,000.000
|
$83,000.000
|
$88,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$6,320.720
|
$4,500.000
|
$4,000.000
|
$4,700.000
|
$10,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
160.000
|
$10.550
|
$10.000
|
$12.000
|
$6.000
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
160.000
|
$4.260
|
$2.000
|
$8.000
|
$3.000
|
$1.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
50.000
|
$50.000
|
$100.000
|
$42.000
|
$55.000
|
$500.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
163.000
|
$165.000
|
$100.000
|
$189.000
|
$235.000
|
$500.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
5.000
|
$5,000.400
|
$3,500.000
|
$3,000.000
|
$5,000.000
|
$4,500.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
3.000
|
$5,000.400
|
$4,200.000
|
$3,000.000
|
$5,000.000
|
$4,500.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
17.000
|
$3,717.000
|
$3,200.000
|
$2,000.000
|
$5,000.000
|
$4,500.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
180.000
|
$15.120
|
$10.000
|
$89.000
|
$10.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
30.000
|
$30.850
|
$27.500
|
$32.000
|
$29.000
|
$30.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
360.000
|
$20.860
|
$15.000
|
$18.000
|
$15.000
|
$25.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
985.000
|
$54.000
|
$47.500
|
$55.000
|
$49.000
|
$50.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,395.000
|
$2.470
|
$3.250
|
$5.000
|
$3.000
|
$4.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
4.000
|
$2,100.000
|
$1,250.000
|
$1,400.000
|
$1,350.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$770.320
|
$1,250.000
|
$500.000
|
$1,410.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$96.900
|
$750.000
|
$450.000
|
$250.000
|
$500.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
80.000
|
$1.400
|
$2.500
|
$2.500
|
$2.500
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,060.000
|
$1.500
|
$1.250
|
$1.500
|
$1.300
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,265.000
|
$8.400
|
$6.250
|
$5.500
|
$6.500
|
$10.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
5,320.000
|
$0.190
|
$0.250
|
$0.400
|
$0.250
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
2,060.000
|
$0.540
|
$0.750
|
$0.600
|
$0.650
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
2,265.000
|
$2.440
|
$4.250
|
$4.100
|
$4.250
|
$3.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
20.000
|
$54.000
|
$90.000
|
$79.000
|
$92.000
|
$40.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
18.000
|
$60.000
|
$105.000
|
$90.000
|
$112.000
|
$40.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
2.000
|
$86.660
|
$350.000
|
$130.000
|
$165.000
|
$40.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
2.000
|
$72.040
|
$250.000
|
$110.000
|
$132.000
|
$40.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,070.000
|
$1.200
|
$1.250
|
$1.300
|
$1.300
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
200.000
|
$0.410
|
$2.500
|
$2.200
|
$2.600
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
4,250.000
|
$1.200
|
$1.250
|
$1.100
|
$1.300
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
20.000
|
$318.000
|
$250.000
|
$225.000
|
$269.000
|
$300.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$630.000
|
$400.000
|
$340.000
|
$416.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
2.000
|
$396.000
|
$350.000
|
$310.000
|
$370.000
|
$500.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
18.000
|
$462.000
|
$310.000
|
$300.000
|
$324.000
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
17.000
|
$42.540
|
$85.000
|
$75.000
|
$85.000
|
$40.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
465.000
|
$7.200
|
$5.000
|
$5.000
|
$5.250
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
85.000
|
$3.860
|
$5.000
|
$5.000
|
$5.250
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
325.000
|
$3.890
|
$5.000
|
$5.000
|
$5.250
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,590.000
|
$0.780
|
$1.000
|
$0.800
|
$0.750
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
80.000
|
$1.200
|
$1.250
|
$1.200
|
$1.250
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,225.000
|
$1.200
|
$1.750
|
$1.500
|
$1.500
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
500.000
|
$4.200
|
$3.250
|
$3.000
|
$3.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
610.000
|
$4.800
|
$4.000
|
$3.250
|
$4.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
21.000
|
$66.000
|
$80.000
|
$70.000
|
$85.000
|
$80.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
2.000
|
$120.000
|
$125.000
|
$200.000
|
$130.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
14.000
|
$90.000
|
$100.000
|
$85.000
|
$100.000
|
$150.000
|
|
|
ELIM EXT PAV MRK & MRKS (UTURN ARROW)
|
EA
|
3.000
|
$118.970
|
$155.000
|
$132.000
|
$165.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
5,320.000
|
$0.240
|
$0.250
|
$0.200
|
$0.150
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
80.000
|
$0.070
|
$1.250
|
$1.500
|
$1.300
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,060.000
|
$0.600
|
$0.700
|
$0.600
|
$0.550
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
2,265.000
|
$2.400
|
$1.000
|
$0.900
|
$1.000
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
20.000
|
$60.000
|
$70.000
|
$75.000
|
$70.000
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$90.000
|
$70.000
|
$75.000
|
$70.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
2.000
|
$43.180
|
$70.000
|
$75.000
|
$70.000
|
$50.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
18.000
|
$78.000
|
$70.000
|
$75.000
|
$70.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
875.000
|
$0.290
|
$1.250
|
$1.200
|
$1.300
|
$0.500
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
3.000
|
$20,000.000
|
$23,000.000
|
$21,000.000
|
$25,000.000
|
$20,000.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
17.000
|
$1,200.000
|
$1,100.000
|
$950.000
|
$1,150.000
|
$1,000.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
170.000
|
$2.690
|
$15.000
|
$15.000
|
$15.000
|
$5.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
1,870.000
|
$5.460
|
$18.000
|
$19.000
|
$18.000
|
$5.000
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
2,745.000
|
$2.400
|
$3.750
|
$5.000
|
$4.000
|
$5.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
14.000
|
$4,000.800
|
$3,500.000
|
$3,000.000
|
$3,700.000
|
$5,000.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
20.000
|
$1,744.670
|
$2,600.000
|
$2,300.000
|
$2,800.000
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
20.000
|
$240.000
|
$250.000
|
$300.000
|
$100.000
|
$500.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
185.000
|
$6.000
|
$3.000
|
$4.000
|
$3.250
|
$5.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
8.000
|
$357.430
|
$250.000
|
$300.000
|
$265.000
|
$500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
28.000
|
$250.190
|
$350.000
|
$1,500.000
|
$125.000
|
$800.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
8.000
|
$253.930
|
$500.000
|
$1,500.000
|
$150.000
|
$500.000
|
|
|
VIVDS PROSR SYS
|
EA
|
3.000
|
$9,951.430
|
$1,650.000
|
$15,000.000
|
$17,000.000
|
$15,000.000
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
11.000
|
$5,400.000
|
$8,750.000
|
$8,000.000
|
$9,300.000
|
$8,000.000
|
|
|
VIVDS CNTRL SOFTWARE
|
EA
|
3.000
|
$1,200.000
|
$625.000
|
$700.000
|
$660.000
|
$2,000.000
|
|
|
VIVDS CABLING
|
LF
|
2,140.000
|
$5.080
|
$5.000
|
$5.000
|
$5.000
|
$10.000
|
|
Totals: |
$703,910.800
|
$739,937.000
|
$785,048.500
|
$859,398.250
|
$921,817.500
|