PREPARING ROW
|
STA
|
6.660
|
$1,600.000
|
$1,150.000
|
$1,850.000
|
$1,400.000
|
$2,400.000
|
$2,500.000
|
$2,600.000
|
$250.000
|
$600.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
182.000
|
$50.000
|
$9.000
|
$15.000
|
$12.500
|
$15.000
|
$25.000
|
$30.000
|
$42.000
|
$15.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
58.000
|
$50.000
|
$11.000
|
$30.000
|
$19.500
|
$15.000
|
$25.000
|
$30.000
|
$62.000
|
$31.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
835.000
|
$7.500
|
$6.000
|
$3.500
|
$7.500
|
$7.000
|
$5.000
|
$20.000
|
$8.500
|
$3.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
211.000
|
$15.000
|
$11.000
|
$19.000
|
$14.500
|
$25.000
|
$15.000
|
$10.000
|
$6.000
|
$10.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
366.000
|
$40.000
|
$22.000
|
$14.000
|
$18.500
|
$7.000
|
$30.000
|
$30.000
|
$24.500
|
$21.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
529.000
|
$16.500
|
$17.000
|
$15.000
|
$18.750
|
$7.000
|
$15.000
|
$30.000
|
$32.000
|
$20.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
977.000
|
$16.000
|
$14.000
|
$20.000
|
$21.500
|
$9.000
|
$17.000
|
$30.000
|
$37.000
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
1,424.000
|
$2.000
|
$4.250
|
$2.500
|
$5.500
|
$1.500
|
$3.000
|
$6.000
|
$5.000
|
$10.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
3,742.000
|
$1.350
|
$1.200
|
$0.760
|
$1.250
|
$1.250
|
$0.690
|
$1.000
|
$0.750
|
$1.250
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
1,871.000
|
$1.500
|
$0.150
|
$0.880
|
$1.500
|
$1.500
|
$0.790
|
$1.000
|
$0.850
|
$1.500
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
1,871.000
|
$1.500
|
$1.400
|
$0.880
|
$1.450
|
$1.500
|
$0.790
|
$1.000
|
$0.850
|
$1.500
|
|
|
VEGETATIVE WATERING
|
MG
|
82.000
|
$22.000
|
$25.000
|
$20.000
|
$15.000
|
$8.000
|
$10.000
|
$1.000
|
$50.000
|
$20.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
200.000
|
$2.000
|
$2.250
|
$1.350
|
$2.350
|
$2.350
|
$10.000
|
$1.000
|
$1.500
|
$2.350
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
1,082.000
|
$4.000
|
$9.000
|
$4.400
|
$5.500
|
$9.600
|
$10.000
|
$9.000
|
$3.000
|
$2.750
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
26.000
|
$120.000
|
$550.000
|
$229.000
|
$267.000
|
$385.000
|
$500.000
|
$400.000
|
$125.000
|
$132.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
282.000
|
$150.000
|
$135.000
|
$132.000
|
$120.000
|
$126.000
|
$180.000
|
$140.000
|
$145.000
|
$150.000
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
661.000
|
$115.000
|
$125.000
|
$180.000
|
$120.000
|
$124.000
|
$180.000
|
$140.000
|
$136.000
|
$145.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-A PG70-22
|
TON
|
213.000
|
$125.000
|
$130.000
|
$146.000
|
$130.000
|
$125.000
|
$180.000
|
$140.000
|
$165.000
|
$175.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
100.000
|
$60.000
|
$58.000
|
$100.000
|
$110.000
|
$50.000
|
$95.000
|
$110.000
|
$55.000
|
$43.150
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
1,073.000
|
$3.000
|
$9.000
|
$6.000
|
$6.600
|
$5.000
|
$15.000
|
$4.000
|
$6.000
|
$7.450
|
|
|
CEM STABIL BKFL
|
CY
|
42.000
|
$150.000
|
$325.000
|
$200.000
|
$280.000
|
$200.000
|
$180.000
|
$250.000
|
$245.000
|
$200.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
681.000
|
$135.000
|
$124.000
|
$131.000
|
$140.000
|
$125.000
|
$160.000
|
$130.000
|
$142.500
|
$195.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
10.000
|
$250.000
|
$265.000
|
$270.000
|
$270.000
|
$270.000
|
$245.000
|
$260.000
|
$275.000
|
$280.000
|
|
|
CL C CONC (ABUT)
|
CY
|
27.800
|
$1,000.000
|
$930.000
|
$1,100.000
|
$835.000
|
$1,000.000
|
$850.000
|
$1,200.000
|
$825.000
|
$940.000
|
|
|
CL C CONC (CAP)
|
CY
|
22.600
|
$785.000
|
$1,085.000
|
$1,300.000
|
$895.000
|
$1,000.000
|
$1,000.000
|
$1,200.000
|
$850.000
|
$1,900.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
13.100
|
$935.000
|
$1,400.000
|
$1,150.000
|
$895.000
|
$1,200.000
|
$1,200.000
|
$1,200.000
|
$925.000
|
$2,000.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
1.000
|
$1,500.000
|
$1,500.000
|
$1,000.000
|
$1,500.000
|
$800.000
|
$1,500.000
|
$1,000.000
|
$1,050.000
|
$850.000
|
|
|
REINF CONC SLAB (SLAB BEAM)
|
SF
|
4,600.000
|
$15.000
|
$18.500
|
$12.000
|
$12.750
|
$16.000
|
$15.000
|
$18.000
|
$11.000
|
$14.000
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$500.000
|
$675.000
|
$525.000
|
$500.000
|
$475.000
|
$500.000
|
$550.000
|
$625.000
|
$515.000
|
|
|
PRESTR CONC SLAB BEAM (5SB12)
|
LF
|
886.500
|
$180.000
|
$140.000
|
$147.000
|
$170.000
|
$170.000
|
$162.000
|
$140.000
|
$195.000
|
$210.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
32.500
|
$950.000
|
$475.000
|
$525.000
|
$480.000
|
$425.000
|
$500.000
|
$500.000
|
$675.000
|
$450.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
11.000
|
$170.000
|
$275.000
|
$160.000
|
$345.000
|
$175.000
|
$180.000
|
$150.000
|
$185.000
|
$190.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
14.000
|
$250.000
|
$300.000
|
$230.000
|
$400.000
|
$350.000
|
$250.000
|
$150.000
|
$475.000
|
$275.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
684.400
|
$155.000
|
$125.000
|
$150.000
|
$165.000
|
$175.000
|
$180.000
|
$140.000
|
$170.000
|
$145.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
39.600
|
$525.000
|
$425.000
|
$400.000
|
$510.000
|
$450.000
|
$450.000
|
$500.000
|
$650.000
|
$520.000
|
|
|
RAIL (TY T223)
|
LF
|
224.000
|
$92.000
|
$115.000
|
$125.000
|
$97.000
|
$100.000
|
$110.000
|
$120.000
|
$120.000
|
$130.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
84.000
|
$90.000
|
$85.000
|
$90.000
|
$60.000
|
$75.000
|
$100.000
|
$100.000
|
$100.000
|
$70.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
4.000
|
$75.000
|
$100.000
|
$130.000
|
$195.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$90.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (P)
|
EA
|
1.000
|
$1,200.000
|
$1,000.000
|
$900.000
|
$850.000
|
$600.000
|
$1,000.000
|
$2,600.000
|
$775.000
|
$770.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$60,000.000
|
$17,500.000
|
$20,000.000
|
$20,000.000
|
$15,000.000
|
$20,000.000
|
$35,000.000
|
$30,000.000
|
$105,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$102,000.000
|
$100,000.000
|
$105,000.000
|
$75,000.000
|
$115,000.000
|
$100,000.000
|
$90,000.000
|
$100,000.000
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$6,000.000
|
$2,500.000
|
$2,350.000
|
$3,000.000
|
$2,300.000
|
$1,500.000
|
$3,000.000
|
$2,500.000
|
$3,270.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
75.000
|
$35.000
|
$25.000
|
$25.000
|
$38.000
|
$26.000
|
$24.000
|
$50.000
|
$40.000
|
$25.400
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
75.000
|
$8.250
|
$9.000
|
$9.800
|
$16.000
|
$5.000
|
$10.000
|
$20.000
|
$10.000
|
$9.250
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
20.000
|
$20.000
|
$50.000
|
$20.000
|
$65.000
|
$40.000
|
$50.000
|
$60.000
|
$40.000
|
$20.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
40.000
|
$110.000
|
$45.000
|
$150.000
|
$255.000
|
$150.000
|
$50.000
|
$60.000
|
$90.000
|
$62.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
785.000
|
$3.250
|
$3.000
|
$3.000
|
$3.250
|
$3.000
|
$3.000
|
$3.000
|
$4.000
|
$2.900
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
785.000
|
$1.000
|
$1.500
|
$1.250
|
$1.100
|
$0.500
|
$1.110
|
$1.000
|
$1.500
|
$1.200
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
24.000
|
$150.000
|
$75.000
|
$175.000
|
$255.000
|
$150.000
|
$100.000
|
$60.000
|
$150.000
|
$93.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$20.000
|
$18.500
|
$19.000
|
$21.500
|
$20.000
|
$18.250
|
$22.000
|
$20.000
|
$18.650
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$1,450.000
|
$1,350.000
|
$1,515.000
|
$1,550.000
|
$1,275.000
|
$1,400.000
|
$1,300.000
|
$1,485.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,000.000
|
$900.000
|
$1,240.000
|
$990.000
|
$1,200.000
|
$1,100.000
|
$1,000.000
|
$1,200.000
|
$970.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
443.750
|
$3.250
|
$2.500
|
$2.200
|
$5.500
|
$2.500
|
$2.000
|
$6.000
|
$2.500
|
$5.400
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$225.000
|
$450.000
|
$270.000
|
$440.000
|
$230.000
|
$200.000
|
$500.000
|
$250.000
|
$435.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$200.000
|
$150.000
|
$175.000
|
$275.000
|
$175.000
|
$150.000
|
$300.000
|
$175.000
|
$270.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,500.000
|
$2,500.000
|
$2,300.000
|
$2,400.000
|
$2,400.000
|
$1,150.000
|
$2,300.000
|
$2,200.000
|
$2,350.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$375.000
|
$100.000
|
$225.000
|
$275.000
|
$225.000
|
$200.000
|
$300.000
|
$210.000
|
$265.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
300.000
|
$11.500
|
$11.000
|
$12.000
|
$16.500
|
$30.000
|
$17.000
|
$20.000
|
$15.000
|
$11.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$2,500.000
|
$2,150.000
|
$2,025.000
|
$2,000.000
|
$2,000.000
|
$350.000
|
$2,000.000
|
$2,000.000
|
$1,970.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
13.000
|
$10.000
|
$11.000
|
$15.000
|
$11.000
|
$11.000
|
$10.000
|
$12.000
|
$12.000
|
$10.800
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
100.000
|
$2.000
|
$1.120
|
$1.700
|
$1.200
|
$1.200
|
$10.000
|
$1.500
|
$2.000
|
$1.200
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
200.000
|
$2.000
|
$2.200
|
$2.400
|
$2.200
|
$2.200
|
$1.100
|
$2.500
|
$2.500
|
$2.100
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$550.000
|
$1,000.000
|
$1,000.000
|
$1,600.000
|
$1,600.000
|
$1,452.000
|
$1,000.000
|
$1,500.000
|
$1,525.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,000.000
|
$1,000.000
|
$1,500.000
|
$2,055.000
|
$2,050.000
|
$1,870.000
|
$1,000.000
|
$2,000.000
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
2.000
|
$115.000
|
$200.000
|
$250.000
|
$130.000
|
$75.000
|
$117.000
|
$100.000
|
$120.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$28.000
|
$25.000
|
$28.000
|
$26.500
|
$20.000
|
$18.000
|
$50.000
|
$55.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$36.000
|
$30.000
|
$26.000
|
$32.000
|
$22.000
|
$20.000
|
$80.000
|
$25.000
|
$31.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
432.000
|
$0.180
|
$3.300
|
$3.300
|
$3.300
|
$3.300
|
$3.000
|
$3.500
|
$3.250
|
$3.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
37.000
|
$3.500
|
$8.800
|
$10.000
|
$8.800
|
$8.800
|
$8.000
|
$10.000
|
$8.500
|
$8.650
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
432.000
|
$0.200
|
$3.300
|
$3.300
|
$3.300
|
$3.300
|
$3.000
|
$4.000
|
$3.250
|
$3.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
74.000
|
$1.000
|
$3.000
|
$2.200
|
$1.500
|
$2.000
|
$1.000
|
$5.000
|
$2.000
|
$1.600
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
329.000
|
$3.000
|
$3.000
|
$2.200
|
$1.750
|
$2.000
|
$3.000
|
$4.000
|
$2.500
|
$2.150
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
25.000
|
$5.250
|
$6.750
|
$8.600
|
$6.600
|
$6.600
|
$6.000
|
$8.000
|
$6.500
|
$6.500
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
280.000
|
$0.550
|
$2.250
|
$2.300
|
$2.200
|
$2.200
|
$2.000
|
$3.000
|
$2.500
|
$2.150
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
40.000
|
$0.550
|
$2.250
|
$3.550
|
$2.200
|
$2.200
|
$2.000
|
$3.000
|
$2.500
|
$2.150
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
140.000
|
$0.550
|
$2.250
|
$2.500
|
$2.200
|
$2.200
|
$2.000
|
$3.000
|
$2.500
|
$2.150
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
1,232.000
|
$0.450
|
$2.000
|
$1.650
|
$1.650
|
$1.650
|
$1.500
|
$2.000
|
$2.000
|
$1.650
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
170.000
|
$0.450
|
$2.000
|
$1.900
|
$1.650
|
$1.650
|
$1.500
|
$2.000
|
$2.000
|
$1.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
676.000
|
$0.400
|
$2.000
|
$1.700
|
$1.650
|
$1.650
|
$1.500
|
$2.000
|
$2.000
|
$1.650
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
18.000
|
$3.550
|
$12.000
|
$14.000
|
$11.000
|
$11.000
|
$10.000
|
$10.000
|
$12.000
|
$10.800
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
460.000
|
$1.000
|
$1.250
|
$1.200
|
$1.100
|
$1.100
|
$1.000
|
$1.000
|
$1.500
|
$1.100
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$15,000.000
|
$9,000.000
|
$6,000.000
|
$16,500.000
|
$18,000.000
|
$5,000.000
|
$10,000.000
|
$18,000.000
|
$13,600.000
|
|
Totals: |
$1,206,583.498
|
$1,077,661.375
|
$1,094,547.480
|
$1,126,610.125
|
$1,149,476.575
|
$1,171,873.010
|
$1,177,662.500
|
$1,231,288.075
|
$1,363,263.650
|