Show Job Controls
Bid Cobra

SMITH IH0020 (6503-71-001)

Items: 36

County: SMITH
Length: 0.0100 MILES
Highway: IH0020
District: TYLER
Control Number: 6503-71-001
DBE Goal: 0.0%
Project: BPM - A00222462
Guaranty: $10,000.00
Time: 115 WORKING DAYS
Engineer's Estimate: $621,455.00
Date: 07/21/2026 10:00 AM CDT (2 months ago) Changed
Contract Number: 7261003
Type: BRIDGE PREVENTATIVE MAINTENANCE
Project ID: A00222462
Project Description: FOR THE PURPOSE OF PERFORMING PREVENTATIVE MAINTENANCE ON VARIOUS BRIDGES IN THE TYLER DISTRICT.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
2709 W FRONT ST, TYLER, TX 75702
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (5)
E
Engineer's Estimate
$621,455.00
Over/Under Est: -10.97% -$68,156.00
Over/Under Est: 7.05% $43,816.20
Amt Left: 20.24% $111,972.20
Over/Under Est: 16.55% $102,844.40
Amt Left: 30.91% $171,000.40
Delta: -8.87% -$59,028.20
Over/Under Est: 24.16% $150,150.00
Amt Left: 39.46% $218,306.00
Delta: -6.53% -$47,305.60
$960,711.00
Over/Under Est: 54.59% $339,256.00
Amt Left: 73.63% $407,412.00
Delta: -24.51% -$189,106.00

Bid Items & Bid Tabulations

36 Total 0 of 36
SMITH  |  IH0020  |  TYLER  |  6503-71-001  |  07/21/2026 10:00 AM CDT  |  $621,455.00  |  BPM - A00222462  |  BRIDGE PREVENT MAINT  |  115 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RED BARON BUILDING COMPANY MUNICIPAL PROJECTS DIVISION LLC
ICOS MANAGEMENT, LLC
SHALOM SERVICES CORPORATION
GHB EQUIPMENT COMPANY, L.L.C.
ODUM SERVICES, LLC
PREPARING ROW(OPT 1)
STA 13.500 $2,000.000 $800.000 $2,100.000 $1,500.000 $2,000.000 $1,500.000
REMOV CONC (RIPRAP)
SY 65.000 $40.000 $45.000 $21.000 $35.000 $50.000 $25.000
REMOV CONC (CURB)
LF 15.000 $15.000 $45.000 $52.500 $25.000 $30.000 $10.000
EXCAV (CHANNEL)
CY 10.000 $35.000 $100.000 $73.500 $60.000 $200.000 $1,000.000
EMBANK (VEH)(OC)(TY C)
CY 160.000 $37.000 $50.000 $42.000 $50.000 $100.000 $30.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 3,400.000 $3.000 $2.000 $1.100 $1.000 $1.500 $2.000
VEGETATIVE WATERING
TGL 37.400 $50.000 $10.000 $21.000 $1.000 $100.000 $15.000
CUT & RESTORING PAV
SY 3.000 $225.000 $600.000 $525.000 $1,000.000 $400.000 $1,500.000
CEM STABIL BKFL
CY 80.000 $275.000 $300.000 $315.000 $500.000 $275.000 $300.000
FLOWABLE BACKFILL
CY 41.000 $350.000 $315.000 $315.000 $500.000 $400.000 $500.000
TEMPORARY SPL SHORING
SF 360.000 $50.000 $115.000 $10.500 $1.000 $85.000 $150.000
CL B CONC (MISC)
CY 1.000 $1,800.000 $800.000 $1,575.000 $1,500.000 $1,500.000 $1,000.000
CL C CONC (PILE ENCASEMENT)
CY 9.000 $2,600.000 $1,800.000 $3,675.000 $2,000.000 $2,500.000 $2,000.000
BRIDGE CURB
SF 7.500 $200.000 $100.000 $420.000 $250.000 $100.000 $850.000
RIPRAP (CONC)(5 IN)
CY 12.000 $650.000 $675.000 $840.000 $1,000.000 $610.000 $1,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 52.000 $685.000 $675.000 $682.500 $750.000 $600.000 $750.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 232.000 $250.000 $250.000 $189.000 $350.000 $275.000 $300.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 451.000 $260.000 $250.000 $189.000 $350.000 $295.000 $350.000
RIPRAP (SPECIAL)
CY 3.500 $750.000 $700.000 $840.000 $1,500.000 $300.000 $1,500.000
CLEANING AND SEALING EXISTING JOINTS
LF 210.000 $40.000 $36.000 $52.500 $55.000 $40.000 $75.000
CLEANING EXISTING JOINTS
LF 1,050.000 $20.000 $19.000 $29.400 $45.000 $10.000 $50.000
WINGWALL (FW - 0) (HW=12 FT)
EA 1.000 $22,000.000 $20,000.000 $26,250.000 $40,000.000 $20,000.000 $20,000.000
CLEAN EXIST CULVERTS
EA 1.000 $5,000.000 $10,000.000 $6,300.000 $10,000.000 $4,000.000 $5,000.000
REMOV STR (WINGWALL)
EA 1.000 $1,250.000 $2,500.000 $4,200.000 $3,000.000 $4,000.000 $3,500.000
MOBILIZATION
LS 1.000 $56,500.000 $30,000.000 $48,000.000 $5.000 $50,000.000 $60,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $1,750.000 $1,800.000 $1.100 $1.000 $4,000.000 $7,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 56.000 $250.000 $125.000 $262.500 $1.000 $150.000 $200.000
TMA (STATIONARY)
DAY 53.000 $250.000 $100.000 $262.500 $1.000 $300.000 $300.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $4.000 $4.000 $2.100 $5.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $1.500 $2.000 $1.100 $1.000 $2.500 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 700.000 $28.500 $32.000 $42.000 $40.000 $45.000 $31.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 2.000 $380.000 $1,400.000 $4,200.000 $1,500.000 $6,000.000 $1,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,050.000 $3,500.000 $5,250.000 $4,000.000 $6,000.000 $3,800.000
BRIDGE JOINT REPAIR (HEADER)
LF 475.000 $150.000 $90.000 $294.000 $300.000 $300.000 $400.000
STONE MASONRY REPAIR
SF 40.000 $150.000 $85.000 $210.000 $125.000 $400.000 $500.000
MAINTENANCE SPEED LIMIT SIGNING
EA 5.000 $500.000 $800.000 $105.000 $1.000 $100.000 $500.000
Totals: $621,455.000 $553,299.000 $665,271.200 $724,299.400 $771,605.000 $960,711.000