|
|
REMOVING STAB BASE AND ASPH PAV (13")
|
SY
|
76.000
|
$19.000
|
$22.250
|
$24.000
|
$40.000
|
|
|
OBLITERATING ABANDONED ROAD
|
STA
|
22.000
|
$600.000
|
$250.000
|
$974.860
|
$1,500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,458.000
|
$8.000
|
$9.400
|
$11.830
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
2,166.000
|
$9.000
|
$7.250
|
$9.350
|
$20.000
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$30.000
|
$55.500
|
$54.130
|
$20.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
25,000.000
|
$0.500
|
$0.400
|
$0.370
|
$0.500
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
25,000.000
|
$0.200
|
$0.400
|
$0.370
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
456.610
|
$20.000
|
$19.500
|
$30.310
|
$27.500
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
237.000
|
$4.000
|
$1.100
|
$30.850
|
$2.500
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
1,753.090
|
$25.000
|
$24.500
|
$35.550
|
$50.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
6,588.000
|
$2.500
|
$3.450
|
$4.930
|
$10.000
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
147.000
|
$160.000
|
$185.000
|
$259.390
|
$225.000
|
|
|
CEMENT
|
TON
|
60.000
|
$150.000
|
$171.000
|
$182.900
|
$180.000
|
|
|
CEMENT TREAT (NEW BASE) (10")
|
SY
|
6,312.000
|
$1.500
|
$3.450
|
$1.530
|
$10.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,391.000
|
$4.500
|
$5.200
|
$5.480
|
$6.000
|
|
|
ASPH (TIER II)
|
GAL
|
2,026.000
|
$4.000
|
$4.950
|
$8.360
|
$15.000
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
59.000
|
$50.000
|
$200.000
|
$114.530
|
$50.000
|
|
|
D-GR HMA TY-D SAC-A PG76-22
|
TON
|
1,143.000
|
$95.000
|
$98.000
|
$103.790
|
$100.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
2,223.000
|
$0.550
|
$3.350
|
$5.460
|
$3.000
|
|
|
RC PIPE (CL III)(24 IN)(SPL)
|
LF
|
100.000
|
$45.000
|
$57.500
|
$56.690
|
$60.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,000.000
|
$905.000
|
$1,270.390
|
$2,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$1,500.000
|
$3,050.000
|
$714.710
|
$5,000.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$360.000
|
$222.000
|
$328.550
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
180.000
|
$20.000
|
$16.000
|
$11.200
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$73,000.000
|
$185,000.000
|
$125,742.350
|
$130,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$3,500.000
|
$4,450.000
|
$3,342.760
|
$4,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
312.000
|
$10.000
|
$14.500
|
$34.400
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$5.000
|
$8.000
|
$15.970
|
$13.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,350.000
|
$3.000
|
$4.400
|
$5.950
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,350.000
|
$0.500
|
$1.000
|
$2.170
|
$0.500
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
6,600.000
|
$30.000
|
$57.000
|
$67.840
|
$50.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
6,600.000
|
$8.000
|
$11.000
|
$12.660
|
$17.500
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
1,000.000
|
$0.150
|
$7.000
|
$1.890
|
$15.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$4,000.000
|
$9,690.000
|
$16,644.220
|
$16,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$800.000
|
$667.000
|
$1,082.500
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$530.000
|
$638.000
|
$119.080
|
$875.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
8.000
|
$600.000
|
$954.000
|
$119.080
|
$1,000.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$500.000
|
$486.000
|
$135.310
|
$400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$70.000
|
$73.000
|
$125.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
4.000
|
$100.000
|
$91.000
|
$18.950
|
$90.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
4.000
|
$80.000
|
$85.000
|
$23.820
|
$92.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
4.000
|
$200.000
|
$12.250
|
$108.250
|
$27.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
9,570.000
|
$0.600
|
$0.700
|
$1.890
|
$0.620
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
539.000
|
$1.000
|
$2.900
|
$2.710
|
$0.960
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,603.000
|
$0.750
|
$1.950
|
$1.890
|
$0.920
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
40.000
|
$5.000
|
$12.000
|
$5.390
|
$16.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,410.000
|
$0.350
|
$0.400
|
$0.500
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
6,517.000
|
$0.300
|
$1.100
|
$0.640
|
$0.420
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
8.000
|
$200.000
|
$267.000
|
$378.880
|
$225.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
7.000
|
$250.000
|
$316.000
|
$324.750
|
$320.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
6.000
|
$2.750
|
$8.250
|
$4.330
|
$10.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
439.000
|
$3.000
|
$5.000
|
$4.330
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,393.000
|
$0.550
|
$1.450
|
$0.430
|
$0.550
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$3,000.000
|
$2,220.000
|
$5,953.750
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$4,000.000
|
$3,890.000
|
$5,746.120
|
$6,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
35.000
|
$125.000
|
$250.000
|
$974.250
|
$500.000
|
|
Totals: |
$759,390.100
|
$1,161,964.950
|
$1,323,603.769
|
$1,401,165.865
|