EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
58.000
|
$40.000
|
$200.000
|
$92.200
|
$35.000
|
$35.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
156.000
|
$6.000
|
$18.700
|
$10.750
|
$10.000
|
$10.000
|
|
|
ASPH (AC-10)
|
GAL
|
11,611.000
|
$4.000
|
$4.350
|
$8.820
|
$6.000
|
$6.500
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
269.600
|
$85.000
|
$169.400
|
$140.980
|
$110.000
|
$300.000
|
|
|
HMCL ACP TY-D SAC-A AC-1.5
|
TON
|
61.000
|
$500.000
|
$250.000
|
$521.900
|
$360.000
|
$140.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 3")
|
SY
|
770.000
|
$5.000
|
$25.030
|
$16.030
|
$15.000
|
$22.000
|
|
|
CEM STABIL BKFL
|
CY
|
110.000
|
$150.000
|
$325.000
|
$55.130
|
$225.000
|
$171.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
200.000
|
$15.000
|
$30.000
|
$87.400
|
$45.000
|
$45.000
|
|
|
CL B CONC (MISC)
|
CY
|
8.000
|
$400.000
|
$400.000
|
$504.320
|
$1,500.000
|
$1,500.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
2.800
|
$1,200.000
|
$6,500.000
|
$4,147.000
|
$7,500.000
|
$1,500.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
10.200
|
$1,500.000
|
$2,700.000
|
$1,520.000
|
$2,500.000
|
$1,500.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
7.500
|
$1,000.000
|
$4,620.000
|
$1,219.000
|
$2,800.000
|
$1,500.000
|
|
|
CL K CONC (PEDESTAL)
|
EA
|
8.000
|
$1,500.000
|
$2,000.000
|
$1,016.000
|
$2,750.000
|
$1,500.000
|
|
|
CL C CONC (CURB)
|
CY
|
0.400
|
$2,500.000
|
$2,500.000
|
$9,431.000
|
$7,500.000
|
$1,500.000
|
|
|
APPROACH SLAB
|
CY
|
50.000
|
$405.000
|
$1,325.000
|
$900.000
|
$1,000.000
|
$1,500.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
2,610.000
|
$5.000
|
$18.150
|
$23.150
|
$20.000
|
$25.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
519.000
|
$300.000
|
$135.000
|
$54.400
|
$190.000
|
$150.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
5,764.000
|
$200.000
|
$145.000
|
$115.550
|
$175.000
|
$350.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
30.000
|
$250.000
|
$200.000
|
$103.440
|
$200.000
|
$350.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
100.000
|
$160.000
|
$275.000
|
$225.210
|
$350.000
|
$185.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
200.000
|
$175.000
|
$231.000
|
$191.680
|
$400.000
|
$185.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
6.000
|
$800.000
|
$2,500.000
|
$650.000
|
$850.000
|
$650.000
|
|
|
ELASTOMERIC BEARING (PLAIN)
|
EA
|
44.000
|
$1,000.000
|
$31.000
|
$90.250
|
$750.000
|
$1,650.000
|
|
|
ELASTOMERIC BEARING (LAMINATED)
|
EA
|
48.000
|
$2,000.000
|
$220.000
|
$355.540
|
$1,250.000
|
$2,000.000
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
3,219.000
|
$35.000
|
$27.000
|
$82.360
|
$40.000
|
$25.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$200,000.000
|
$330,990.000
|
$567,151.000
|
$350,000.000
|
$425,000.000
|
|
|
RETROFIT RAIL (TY T221)
|
LF
|
172.300
|
$150.000
|
$570.000
|
$236.160
|
$250.000
|
$185.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
12.000
|
$350.000
|
$700.000
|
$456.670
|
$650.000
|
$2,000.000
|
|
|
PIPE (PVC) (SCH 40) (5 IN)
|
LF
|
528.000
|
$35.000
|
$107.000
|
$50.150
|
$12.000
|
$30.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$200,000.000
|
$260,000.000
|
$127,399.000
|
$500,000.000
|
$100,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,000.000
|
$1,500.000
|
$2,200.000
|
$5,500.000
|
$2,500.000
|
|
|
REMOV STR (ABUTMENT)
|
EA
|
2.000
|
$7,000.000
|
$7,000.000
|
$6,000.000
|
$10,000.000
|
$2,500.000
|
|
|
REMOV STR (CURB)
|
EA
|
4.000
|
$250.000
|
$250.000
|
$700.000
|
$2,500.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$318,000.000
|
$222,800.000
|
$305,000.000
|
$420,000.000
|
$590,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,500.000
|
$9,100.000
|
$9,426.000
|
$7,500.000
|
$8,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,200.000
|
$7.000
|
$2.000
|
$4.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,200.000
|
$1.300
|
$1.000
|
$1.200
|
$1.000
|
$2.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$6,100.000
|
$15,850.000
|
$6,315.000
|
$7,000.000
|
$5,500.000
|
|
|
PORT CTB (MOVE) (SAFETY SH) (TY 2)
|
LF
|
1,090.000
|
$10.000
|
$16.500
|
$22.220
|
$20.000
|
$20.000
|
|
|
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
|
LF
|
1,090.000
|
$20.000
|
$22.000
|
$29.630
|
$25.000
|
$25.000
|
|
|
PORT CTB (STKPL)(SAFETY SH)
|
LF
|
1,090.000
|
$20.000
|
$19.800
|
$26.670
|
$25.000
|
$20.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$25.000
|
$21.730
|
$29.260
|
$25.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$2,090.000
|
$2,815.000
|
$1,600.000
|
$1,850.000
|
|
|
MTL BM GD FEN TRANS (THRIE-BEAM)(OPT1)
|
EA
|
4.000
|
$1,500.000
|
$2,200.000
|
$2,963.000
|
$1,500.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
676.000
|
$3.000
|
$3.300
|
$4.440
|
$3.000
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,200.000
|
$2,750.000
|
$3,704.000
|
$2,300.000
|
$2,850.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$2,500.000
|
$1,650.000
|
$2,222.000
|
$3,000.000
|
$5,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,000.000
|
$825.000
|
$1,111.000
|
$1,000.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
6.000
|
$10,000.000
|
$8,800.000
|
$11,852.000
|
$9,500.000
|
$12,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
28.000
|
$60.000
|
$22.000
|
$29.630
|
$20.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$45.780
|
$38.500
|
$51.860
|
$30.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
17,724.000
|
$0.180
|
$0.760
|
$0.400
|
$0.600
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
48.000
|
$1.980
|
$4.400
|
$3.500
|
$7.000
|
$20.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
932.000
|
$0.190
|
$0.760
|
$0.320
|
$0.400
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
24.000
|
$7.000
|
$3.300
|
$4.000
|
$8.000
|
$34.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
490.000
|
$1.620
|
$5.000
|
$2.000
|
$4.000
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
9,796.000
|
$0.350
|
$0.580
|
$0.600
|
$0.600
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
70.000
|
$0.350
|
$0.580
|
$0.450
|
$0.600
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
9,513.000
|
$0.350
|
$0.580
|
$0.550
|
$0.600
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
124.000
|
$3.500
|
$6.050
|
$3.200
|
$6.000
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,864.000
|
$0.750
|
$3.850
|
$0.550
|
$3.000
|
$0.500
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
856.000
|
$50.000
|
$41.000
|
$21.990
|
$60.000
|
$125.000
|
|
|
CARBON FIBER REINF POLYMER STRENGTHNING
|
SF
|
5,280.000
|
$50.000
|
$32.500
|
$37.680
|
$52.000
|
$150.000
|
|
|
ASPHALT PLUG EXP JOINT
|
CF
|
876.000
|
$300.000
|
$381.000
|
$410.690
|
$350.000
|
$650.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
360.000
|
$100.000
|
$95.000
|
$90.540
|
$75.000
|
$150.000
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
640.000
|
$8.000
|
$20.000
|
$7.000
|
$20.000
|
$1.500
|
|
Totals: |
$3,480,792.250
|
$3,484,144.570
|
$3,518,094.026
|
$4,241,829.600
|
$5,940,295.500
|