|
|
REMOVING CONC (MEDIANS)
|
SY
|
14.000
|
$20.000
|
$25.000
|
$500.000
|
$162.570
|
$275.000
|
$100.000
|
$535.270
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
21,816.000
|
$8.000
|
$11.000
|
$6.000
|
$9.450
|
$6.650
|
$8.500
|
$1.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
21,816.000
|
$14.000
|
$6.000
|
$2.500
|
$1.450
|
$2.750
|
$2.000
|
$1.370
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
SY
|
19,149.000
|
$15.000
|
$2.150
|
$5.000
|
$3.580
|
$7.500
|
$5.000
|
$14.860
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY D)
|
CY
|
2,671.000
|
$17.000
|
$15.000
|
$22.000
|
$16.060
|
$30.000
|
$13.000
|
$23.040
|
|
|
BACKFILL (TY B)
|
STA
|
80.120
|
$275.000
|
$150.000
|
$300.000
|
$153.780
|
$625.000
|
$300.000
|
$514.850
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
24,198.000
|
$0.330
|
$0.350
|
$0.450
|
$0.350
|
$0.500
|
$0.400
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
75.000
|
$19.910
|
$75.000
|
$25.000
|
$77.570
|
$165.000
|
$40.000
|
$209.230
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(11")
|
SY
|
13,332.000
|
$28.750
|
$24.000
|
$24.000
|
$17.200
|
$22.000
|
$17.000
|
$19.150
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(12")
|
SY
|
5,817.000
|
$28.750
|
$26.000
|
$28.000
|
$25.500
|
$30.000
|
$26.000
|
$29.770
|
|
|
PRIME COAT (MC-30)
|
GAL
|
5,515.000
|
$5.040
|
$3.150
|
$5.500
|
$5.540
|
$5.500
|
$4.500
|
$5.860
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
7,216.000
|
$4.600
|
$5.000
|
$5.000
|
$4.100
|
$5.500
|
$4.000
|
$4.900
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
145.000
|
$94.000
|
$150.000
|
$250.000
|
$348.700
|
$200.000
|
$230.000
|
$676.660
|
|
|
D-GR HMA(SQ) TY-B SAC-B PG64-22
|
TON
|
2,231.000
|
$75.000
|
$140.000
|
$130.000
|
$115.930
|
$141.000
|
$150.000
|
$160.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
68.000
|
$618.800
|
$600.000
|
$650.000
|
$474.150
|
$660.000
|
$850.000
|
$908.500
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
200.000
|
$208.000
|
$225.000
|
$250.000
|
$158.060
|
$250.000
|
$375.000
|
$431.250
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
14.500
|
$438.900
|
$800.000
|
$580.000
|
$925.050
|
$605.000
|
$1,000.000
|
$862.500
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
60.000
|
$505.000
|
$700.000
|
$680.000
|
$712.520
|
$715.000
|
$725.000
|
$690.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
24.000
|
$685.000
|
$1,000.000
|
$1,100.000
|
$1,144.440
|
$1,100.000
|
$1,100.000
|
$920.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
80.000
|
$60.600
|
$54.000
|
$57.000
|
$81.530
|
$60.000
|
$85.000
|
$172.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
84.000
|
$78.000
|
$125.000
|
$130.000
|
$154.220
|
$138.000
|
$95.000
|
$201.250
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
1.000
|
$5,340.000
|
$4,500.000
|
$4,800.000
|
$11,432.800
|
$5,500.000
|
$8,800.000
|
$8,625.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
2.000
|
$6,650.000
|
$6,500.000
|
$6,800.000
|
$12,930.210
|
$7,500.000
|
$20,000.000
|
$25,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,408.000
|
$850.000
|
$900.000
|
$1,252.090
|
$935.000
|
$2,500.000
|
$1,725.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,050.000
|
$950.000
|
$1,000.000
|
$1,502.090
|
$1,045.000
|
$2,700.000
|
$1,840.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$584.000
|
$550.000
|
$650.000
|
$1,215.210
|
$605.000
|
$1,500.000
|
$1,150.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$298,000.000
|
$300,000.000
|
$300,000.000
|
$470,238.530
|
$400,000.000
|
$510,000.000
|
$490,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$5,500.000
|
$2,000.000
|
$15,000.000
|
$3,618.680
|
$7,755.000
|
$3,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
40.000
|
$22.750
|
$15.000
|
$110.000
|
$29.060
|
$44.000
|
$25.000
|
$165.630
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$9.300
|
$10.000
|
$50.000
|
$13.310
|
$16.500
|
$15.000
|
$112.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
340.000
|
$4.750
|
$5.000
|
$8.000
|
$12.930
|
$5.500
|
$6.000
|
$10.030
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
340.000
|
$1.160
|
$1.000
|
$1.100
|
$2.430
|
$2.200
|
$2.000
|
$2.880
|
|
|
CONSTRUCTING DETOURS
|
SY
|
967.000
|
$60.000
|
$90.000
|
$75.000
|
$77.370
|
$132.000
|
$90.000
|
$148.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
275.000
|
$42.000
|
$25.000
|
$55.000
|
$54.650
|
$78.500
|
$40.000
|
$172.500
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
16,283.000
|
$0.200
|
$0.100
|
$0.400
|
$0.380
|
$0.330
|
$0.300
|
$0.300
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
8,193.000
|
$0.200
|
$0.100
|
$0.500
|
$0.380
|
$0.500
|
$0.300
|
$0.600
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,150.000
|
$25.000
|
$15.000
|
$28.000
|
$27.400
|
$28.500
|
$30.000
|
$29.900
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
925.000
|
$3.000
|
$2.000
|
$3.200
|
$3.270
|
$3.300
|
$3.000
|
$3.450
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$280.000
|
$115.000
|
$320.000
|
$343.130
|
$330.000
|
$500.000
|
$345.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$290.000
|
$115.000
|
$320.000
|
$371.270
|
$330.000
|
$500.000
|
$345.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$2,800.000
|
$2,400.000
|
$3,400.000
|
$3,352.510
|
$3,500.000
|
$3,000.000
|
$3,651.250
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
7.000
|
$809.000
|
$1,300.000
|
$1,400.000
|
$1,801.080
|
$1,430.000
|
$175.000
|
$172.500
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
25.000
|
$3,245.000
|
$3,300.000
|
$3,500.000
|
$3,490.500
|
$3,630.000
|
$5,000.000
|
$5,175.000
|
|
|
HI MST IL POLE (125 FT)(100 MPH)
|
EA
|
2.000
|
$40,480.000
|
$35,000.000
|
$37,000.000
|
$33,656.270
|
$38,500.000
|
$55,000.000
|
$58,650.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
6,607.000
|
$9.340
|
$12.000
|
$13.000
|
$11.420
|
$13.200
|
$10.500
|
$11.500
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
559.000
|
$36.600
|
$30.000
|
$32.000
|
$79.150
|
$33.000
|
$35.500
|
$40.250
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
7,178.000
|
$1.100
|
$1.250
|
$1.300
|
$2.130
|
$1.400
|
$1.750
|
$1.730
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
14,356.000
|
$1.000
|
$1.500
|
$1.600
|
$2.120
|
$1.650
|
$2.000
|
$2.010
|
|
|
GROUND BOX TY A (122311)
|
EA
|
2.000
|
$735.000
|
$750.000
|
$800.000
|
$896.270
|
$825.000
|
$1,000.000
|
$977.500
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
12.000
|
$986.000
|
$1,000.000
|
$1,100.000
|
$1,059.380
|
$1,100.000
|
$1,700.000
|
$1,725.000
|
|
|
GROUND BOX TY BATTERY (162915)W/APRON
|
EA
|
4.000
|
$1,924.000
|
$1,600.000
|
$1,700.000
|
$1,760.630
|
$2,035.000
|
$3,500.000
|
$3,450.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
1.000
|
$576.000
|
$500.000
|
$530.000
|
$900.040
|
$550.000
|
$300.000
|
$287.500
|
|
|
ELC SRV TY A 240/480 100(SS)AL(E)SP(O)
|
EA
|
2.000
|
$5,470.000
|
$5,500.000
|
$5,800.000
|
$7,931.270
|
$6,050.000
|
$12,000.000
|
$9,775.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
68.000
|
$71.610
|
$30.000
|
$32.000
|
$30.000
|
$29.750
|
$35.000
|
$34.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
23.000
|
$682.000
|
$550.000
|
$580.000
|
$825.000
|
$852.000
|
$700.000
|
$718.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$782.000
|
$630.000
|
$660.000
|
$956.250
|
$990.000
|
$850.000
|
$879.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
5.000
|
$1,030.000
|
$1,025.000
|
$1,100.000
|
$746.250
|
$1,540.000
|
$1,150.000
|
$1,167.250
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
7.000
|
$800.000
|
$745.000
|
$800.000
|
$1,113.750
|
$1,155.000
|
$1,050.000
|
$1,058.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$1,100.000
|
$1,025.000
|
$1,100.000
|
$1,166.250
|
$1,210.000
|
$1,050.000
|
$1,055.700
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$1,200.000
|
$912.000
|
$960.000
|
$1,297.500
|
$1,350.000
|
$1,100.000
|
$1,129.300
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$500.000
|
$420.000
|
$450.000
|
$746.250
|
$770.000
|
$700.000
|
$713.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
41.000
|
$114.920
|
$60.000
|
$65.000
|
$115.980
|
$110.000
|
$150.000
|
$88.980
|
|
|
ISRSA TY10BWG(1)SA(T) (EXCLUDING SIGN)
|
EA
|
1.000
|
$640.000
|
$500.000
|
$530.000
|
$774.040
|
$695.000
|
$1,500.000
|
$1,150.000
|
|
|
INSTL OM ASSM (OM-3L)(WFLX)GND)GND
|
EA
|
13.000
|
$28.130
|
$35.000
|
$37.000
|
$586.160
|
$605.000
|
$500.000
|
$644.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,150.000
|
$0.710
|
$2.000
|
$2.200
|
$2.200
|
$2.200
|
$2.250
|
$2.300
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
100.000
|
$1.210
|
$4.000
|
$4.200
|
$5.330
|
$4.400
|
$4.500
|
$4.600
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
57.000
|
$7.010
|
$25.000
|
$26.000
|
$28.220
|
$28.000
|
$14.000
|
$28.750
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
3.000
|
$163.000
|
$600.000
|
$640.000
|
$667.510
|
$660.000
|
$175.000
|
$690.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,670.000
|
$0.710
|
$2.000
|
$2.200
|
$2.170
|
$2.200
|
$2.250
|
$2.300
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
5,483.000
|
$0.850
|
$1.100
|
$1.200
|
$1.180
|
$1.250
|
$1.250
|
$1.270
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
3,461.000
|
$3.390
|
$3.350
|
$3.600
|
$3.550
|
$3.700
|
$1.250
|
$3.850
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
16,931.000
|
$0.580
|
$0.550
|
$0.600
|
$0.590
|
$0.650
|
$1.250
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
32,578.000
|
$0.550
|
$0.550
|
$0.600
|
$0.590
|
$0.650
|
$1.250
|
$0.630
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
78.000
|
$13.800
|
$18.900
|
$20.000
|
$21.290
|
$20.000
|
$23.000
|
$21.740
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
13.000
|
$225.000
|
$298.000
|
$320.000
|
$321.560
|
$325.000
|
$375.000
|
$342.700
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
9.000
|
$260.000
|
$425.000
|
$450.000
|
$458.750
|
$465.000
|
$425.000
|
$488.750
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
8.000
|
$57.560
|
$36.500
|
$38.000
|
$52.390
|
$40.000
|
$125.000
|
$41.980
|
|
REFL PAV MRKR TY I-C
|
EA
|
167.000
|
$3.250
|
$3.250
|
$3.500
|
$4.090
|
$3.600
|
$6.000
|
$3.740
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,158.000
|
$3.030
|
$3.250
|
$3.500
|
$3.510
|
$3.600
|
$6.000
|
$3.740
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
260.000
|
$0.380
|
$5.000
|
$5.500
|
$10.930
|
$5.500
|
$12.000
|
$5.750
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
120.000
|
$3.650
|
$10.000
|
$11.000
|
$32.440
|
$11.000
|
$17.000
|
$11.500
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$238.400
|
$250.000
|
$260.000
|
$343.130
|
$270.000
|
$350.000
|
$345.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
4.000
|
$250.000
|
$245.000
|
$260.000
|
$343.130
|
$270.000
|
$350.000
|
$345.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
4.000
|
$6,758.000
|
$6,650.000
|
$7,000.000
|
$7,903.130
|
$7,350.000
|
$12,000.000
|
$10,925.000
|
|
|
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
3.000
|
$550.000
|
$500.000
|
$530.000
|
$720.010
|
$550.000
|
$175.000
|
$172.500
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
7,394.000
|
$120.000
|
$145.000
|
$126.000
|
$124.380
|
$128.000
|
$140.000
|
$150.000
|
|
|
TACK COAT
|
GAL
|
5,376.000
|
$3.520
|
$2.000
|
$3.600
|
$4.970
|
$5.500
|
$5.500
|
$7.790
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$6,000.000
|
$100.000
|
$5,000.000
|
$20,025.390
|
$16,500.000
|
$6,000.000
|
$21,584.660
|
|
|
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
|
LF
|
160.000
|
$3.300
|
$30.000
|
$32.000
|
$11.200
|
$33.000
|
$25.000
|
$34.500
|
|
|
LED HI MST IL AM(6 FIXT)ASYM(TY A)SHLD
|
EA
|
2.000
|
$25,360.000
|
$23,000.000
|
$25,000.000
|
$1,347.770
|
$25,300.000
|
$40,000.000
|
$41,400.000
|
|
|
TMA (STATIONARY)
|
DAY
|
95.000
|
$150.000
|
$1.000
|
$260.000
|
$334.390
|
$250.000
|
$375.000
|
$401.640
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
95.000
|
$150.000
|
$1.000
|
$5.000
|
$1,031.820
|
$350.000
|
$100.000
|
$519.160
|
|
Totals: |
$3,752,489.340
|
$3,582,033.050
|
$3,632,100.000
|
$3,749,956.589
|
$4,018,804.090
|
$4,065,979.250
|
$4,845,157.472
|