PREPARING ROW
|
STA
|
22.000
|
$5,700.000
|
$1,000.000
|
$5,000.000
|
$4,000.000
|
$1,200.000
|
$5,600.000
|
$9,221.160
|
$2,164.000
|
$1,000.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
4,688.000
|
$10.000
|
$6.520
|
$8.000
|
$10.000
|
$7.000
|
$11.250
|
$8.000
|
$8.100
|
$5.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,074.000
|
$20.000
|
$10.000
|
$10.000
|
$20.000
|
$12.000
|
$12.000
|
$27.000
|
$33.500
|
$8.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
1,717.000
|
$18.000
|
$16.000
|
$18.000
|
$25.000
|
$26.000
|
$16.000
|
$45.000
|
$53.500
|
$32.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
5,536.000
|
$0.100
|
$0.490
|
$0.600
|
$0.500
|
$0.360
|
$0.650
|
$0.570
|
$1.300
|
$0.200
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
5,536.000
|
$0.100
|
$0.490
|
$0.600
|
$0.500
|
$0.370
|
$0.650
|
$0.570
|
$1.300
|
$0.200
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
5,536.000
|
$0.650
|
$0.920
|
$1.000
|
$1.500
|
$1.000
|
$2.350
|
$2.120
|
$2.550
|
$0.800
|
|
|
VEGETATIVE WATERING
|
MG
|
202.000
|
$29.000
|
$25.920
|
$80.000
|
$1.000
|
$30.000
|
$20.000
|
$50.000
|
$76.000
|
$24.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
5,536.000
|
$3.310
|
$2.160
|
$2.300
|
$3.000
|
$1.000
|
$5.250
|
$1.770
|
$4.800
|
$2.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
1,980.000
|
$50.000
|
$67.510
|
$55.000
|
$65.000
|
$77.000
|
$52.500
|
$90.000
|
$89.500
|
$87.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
1,017.000
|
$5.000
|
$6.370
|
$5.000
|
$8.000
|
$11.000
|
$14.000
|
$5.000
|
$9.500
|
$10.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
2,137.000
|
$4.000
|
$5.500
|
$5.000
|
$12.000
|
$9.000
|
$11.000
|
$4.000
|
$4.700
|
$6.300
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
41.000
|
$155.000
|
$127.370
|
$300.000
|
$700.000
|
$590.000
|
$700.000
|
$100.000
|
$609.000
|
$853.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
6,089.000
|
$2.000
|
$2.160
|
$4.000
|
$12.000
|
$2.000
|
$6.750
|
$2.370
|
$2.500
|
$3.000
|
|
|
CEM STABIL BKFL
|
CY
|
129.000
|
$220.000
|
$220.000
|
$200.000
|
$250.000
|
$360.000
|
$235.000
|
$201.080
|
$263.500
|
$400.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,026.000
|
$28.000
|
$25.000
|
$20.000
|
$40.000
|
$50.000
|
$46.000
|
$54.420
|
$70.000
|
$115.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
875.000
|
$250.000
|
$177.450
|
$210.000
|
$220.000
|
$238.000
|
$230.000
|
$214.460
|
$269.000
|
$500.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
280.000
|
$400.000
|
$236.250
|
$270.000
|
$285.000
|
$316.000
|
$295.000
|
$303.320
|
$372.000
|
$600.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
61.700
|
$2,000.000
|
$1,150.000
|
$1,500.000
|
$1,100.000
|
$1,525.000
|
$1,225.000
|
$2,647.150
|
$3,402.000
|
$2,400.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
144.100
|
$33.000
|
$1,150.000
|
$1,500.000
|
$1,000.000
|
$1,200.000
|
$1,350.000
|
$2,039.460
|
$2,930.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
170.500
|
$1,500.000
|
$1,250.000
|
$1,500.000
|
$800.000
|
$1,200.000
|
$1,475.000
|
$2,406.920
|
$2,778.000
|
$1,905.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
24,976.000
|
$33.000
|
$22.000
|
$23.000
|
$21.000
|
$25.000
|
$26.850
|
$38.430
|
$46.500
|
$42.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
115.600
|
$750.000
|
$600.000
|
$680.000
|
$700.000
|
$500.000
|
$650.000
|
$1,136.990
|
$1,249.000
|
$1,200.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
1,918.000
|
$220.000
|
$130.020
|
$150.000
|
$220.000
|
$226.000
|
$160.000
|
$185.810
|
$286.000
|
$315.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,183.000
|
$200.000
|
$133.480
|
$150.000
|
$220.000
|
$232.000
|
$165.000
|
$215.010
|
$241.500
|
$280.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
770.000
|
$20.000
|
$10.750
|
$12.000
|
$10.000
|
$32.000
|
$16.000
|
$23.750
|
$13.000
|
$16.000
|
|
|
RIPRAP (CONC)(CL B)(5 IN)
|
CY
|
129.000
|
$470.000
|
$500.000
|
$650.000
|
$550.000
|
$600.000
|
$495.000
|
$1,418.250
|
$874.000
|
$940.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
38.000
|
$505.000
|
$475.000
|
$650.000
|
$550.000
|
$800.000
|
$485.000
|
$1,504.930
|
$717.000
|
$1,100.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
928.000
|
$175.000
|
$125.000
|
$100.000
|
$125.000
|
$165.000
|
$130.000
|
$332.720
|
$270.000
|
$265.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
156.000
|
$100.000
|
$82.920
|
$95.000
|
$75.000
|
$98.000
|
$85.000
|
$466.540
|
$199.500
|
$190.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$125,000.000
|
$174,960.000
|
$350,000.000
|
$175,000.000
|
$269,000.000
|
$265,000.000
|
$150,000.000
|
$344,576.000
|
$1,150,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
52.000
|
$3.000
|
$4.750
|
$3.000
|
$10.000
|
$12.000
|
$25.000
|
$31.820
|
$27.500
|
$13.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$407,880.000
|
$364,624.220
|
$450,000.000
|
$395,000.000
|
$450,000.000
|
$550,000.000
|
$610,000.000
|
$1,112,926.000
|
$840,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$10,000.000
|
$5,694.300
|
$1,200.000
|
$7,000.000
|
$1,371.000
|
$4,500.000
|
$9,376.890
|
$2,633.000
|
$7,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
140.000
|
$32.000
|
$42.010
|
$70.000
|
$1.000
|
$30.000
|
$45.000
|
$43.960
|
$64.500
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$12.000
|
$17.720
|
$5.000
|
$1.000
|
$12.000
|
$15.000
|
$18.550
|
$15.000
|
$11.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$30.000
|
$40.070
|
$45.000
|
$1.000
|
$30.000
|
$40.000
|
$41.930
|
$64.000
|
$38.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$9.000
|
$15.720
|
$5.000
|
$1.000
|
$12.000
|
$15.000
|
$16.450
|
$14.500
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,650.000
|
$3.000
|
$5.030
|
$3.200
|
$1.000
|
$2.500
|
$3.000
|
$5.260
|
$3.850
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,650.000
|
$1.000
|
$1.410
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.470
|
$1.300
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
470.000
|
$6.500
|
$11.610
|
$3.000
|
$8.000
|
$4.500
|
$8.750
|
$12.150
|
$6.900
|
$8.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
20.000
|
$5,000.000
|
$1,998.000
|
$4,000.000
|
$5,000.000
|
$3,500.000
|
$5,600.000
|
$2,825.000
|
$3,628.000
|
$4,900.000
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
4,560.000
|
$10.000
|
$26.380
|
$30.000
|
$30.000
|
$27.000
|
$88.000
|
$15.000
|
$34.500
|
$32.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
4,560.000
|
$10.000
|
$15.340
|
$10.000
|
$30.000
|
$16.000
|
$16.000
|
$10.000
|
$23.000
|
$21.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
4,220.000
|
$0.150
|
$1.080
|
$3.000
|
$4.000
|
$3.000
|
$4.500
|
$0.500
|
$1.200
|
$1.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
2,110.000
|
$0.190
|
$1.080
|
$3.000
|
$2.000
|
$5.000
|
$4.500
|
$0.500
|
$1.800
|
$2.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
287.500
|
$23.000
|
$21.000
|
$25.000
|
$26.000
|
$23.000
|
$26.000
|
$20.000
|
$33.500
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,443.750
|
$1,500.000
|
$1,200.000
|
$2,100.000
|
$1,600.000
|
$1,375.000
|
$2,568.000
|
$2,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
750.000
|
$3.000
|
$2.630
|
$3.000
|
$2.000
|
$2.500
|
$3.000
|
$2.500
|
$391.500
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$300.000
|
$210.000
|
$250.000
|
$500.000
|
$225.000
|
$500.000
|
$200.000
|
$449.500
|
$400.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$275.000
|
$157.500
|
$250.000
|
$200.000
|
$150.000
|
$500.000
|
$150.000
|
$449.500
|
$400.000
|
|
|
CABLE BARRIER SYSTEM (TL-3)
|
LF
|
26.000
|
$11.000
|
$18.000
|
$25.000
|
$50.000
|
$225.000
|
$125.000
|
$10.190
|
$38.500
|
$32.000
|
|
|
CABLE BARRIER TERMINAL SECTION (TL-3)
|
EA
|
2.000
|
$3,000.000
|
$5,275.000
|
$5,500.000
|
$5,000.000
|
$6,200.000
|
$1,500.000
|
$2,900.000
|
$5,137.000
|
$4,100.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,700.000
|
$2,625.000
|
$2,500.000
|
$2,600.000
|
$2,800.000
|
$2,850.000
|
$2,500.000
|
$3,853.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$290.000
|
$210.000
|
$250.000
|
$500.000
|
$225.000
|
$500.000
|
$200.000
|
$449.500
|
$400.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,300.000
|
$2,625.000
|
$2,000.000
|
$5,000.000
|
$2,900.000
|
$2,000.000
|
$2,500.000
|
$3,210.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,500.000
|
$2,625.000
|
$2,000.000
|
$2,000.000
|
$2,900.000
|
$2,000.000
|
$2,500.000
|
$1,605.000
|
$450.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$9,791.250
|
$9,000.000
|
$15,000.000
|
$11,000.000
|
$11,500.000
|
$9,325.000
|
$9,631.000
|
$15,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$600.000
|
$945.000
|
$450.000
|
$800.000
|
$1,000.000
|
$1,000.000
|
$451.500
|
$995.000
|
$780.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$790.000
|
$1,155.000
|
$650.000
|
$800.000
|
$1,300.000
|
$900.000
|
$616.750
|
$1,284.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$1,365.000
|
$1,000.000
|
$800.000
|
$1,600.000
|
$1,000.000
|
$913.100
|
$1,669.000
|
$1,350.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$90.000
|
$136.500
|
$100.000
|
$100.000
|
$150.000
|
$250.000
|
$78.450
|
$128.500
|
$80.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
10.000
|
$22.000
|
$36.750
|
$30.000
|
$50.000
|
$42.000
|
$45.000
|
$50.000
|
$46.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$30.000
|
$26.250
|
$15.000
|
$50.000
|
$30.000
|
$45.000
|
$25.000
|
$58.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
4,214.000
|
$0.400
|
$1.080
|
$1.200
|
$1.500
|
$1.200
|
$1.250
|
$0.120
|
$1.300
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,037.000
|
$1.000
|
$1.780
|
$1.200
|
$2.000
|
$1.200
|
$1.250
|
$1.280
|
$1.300
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$7.000
|
$21.600
|
$25.000
|
$20.000
|
$23.000
|
$25.000
|
$5.000
|
$25.500
|
$22.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,200.000
|
$1.000
|
$1.080
|
$1.200
|
$2.000
|
$1.200
|
$1.250
|
$1.280
|
$1.300
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
4,220.000
|
$0.350
|
$0.970
|
$1.100
|
$1.500
|
$1.000
|
$1.250
|
$0.900
|
$1.150
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
595.000
|
$0.350
|
$0.970
|
$1.100
|
$1.500
|
$1.000
|
$1.250
|
$0.980
|
$1.150
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
3,475.000
|
$0.350
|
$0.970
|
$1.100
|
$1.500
|
$1.000
|
$1.250
|
$0.920
|
$1.150
|
$1.100
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
54.000
|
$3.000
|
$10.080
|
$14.000
|
$15.000
|
$10.000
|
$15.000
|
$5.000
|
$13.000
|
$12.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
8,858.000
|
$1.000
|
$0.970
|
$1.100
|
$1.200
|
$1.000
|
$1.250
|
$0.980
|
$2.350
|
$1.100
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
840.000
|
$120.000
|
$120.370
|
$120.000
|
$180.000
|
$139.000
|
$185.000
|
$100.000
|
$146.500
|
$120.000
|
|
|
SP MIXES SP-D SAC-B PG70-22
|
TON
|
1,229.000
|
$100.000
|
$130.000
|
$125.000
|
$180.000
|
$139.000
|
$175.000
|
$100.000
|
$133.500
|
$130.000
|
|
|
TACK COAT
|
GAL
|
1,118.000
|
$4.000
|
$4.500
|
$6.000
|
$6.000
|
$4.000
|
$8.000
|
$4.000
|
$11.500
|
$15.000
|
|
|
TEMP CONSTRUCTION ACCESS
|
LS
|
1.000
|
$200,000.000
|
$389,160.510
|
$175,000.000
|
$190,000.000
|
$247,000.000
|
$625,850.000
|
$425,692.680
|
$179,606.000
|
$1,000,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$15,000.000
|
$15,750.000
|
$15,000.000
|
$2,500.000
|
$7,200.000
|
$15,000.000
|
$11,000.000
|
$24,674.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
10.000
|
$200.000
|
$166.280
|
$250.000
|
$200.000
|
$475.000
|
$450.000
|
$142.000
|
$1,755.000
|
$230.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$200.000
|
$366.280
|
$300.000
|
$200.000
|
$700.000
|
$950.000
|
$1,535.070
|
$940.000
|
$1,000.000
|
|
Totals: |
$4,519,026.560
|
$4,007,232.000
|
$4,334,790.500
|
$4,534,985.600
|
$4,672,631.480
|
$5,574,018.000
|
$6,101,096.145
|
$7,552,619.050
|
$8,492,666.200
|