|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
2,503.000
|
$20.000
|
$12.000
|
$79.670
|
$25.000
|
$18.000
|
|
|
|
BACKFILL (TY B)
|
STA
|
961.000
|
$120.000
|
$240.000
|
$255.000
|
$170.000
|
$125.100
|
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
10,750.000
|
$3.000
|
$3.535
|
$7.370
|
$7.200
|
$3.940
|
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
217,690.000
|
$3.250
|
$4.338
|
$4.600
|
$4.270
|
$5.020
|
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
5,110.000
|
$100.000
|
$125.007
|
$144.270
|
$155.000
|
$145.800
|
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
2,800.000
|
$95.000
|
$91.116
|
$130.940
|
$123.000
|
$124.150
|
|
|
|
PLANE ASPH CONC PAV(0" TO 1")
|
SY
|
10,834.000
|
$3.000
|
$0.813
|
$7.860
|
$1.700
|
$1.850
|
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,290.000
|
$6.580
|
$1.539
|
$13.110
|
$3.900
|
$1.850
|
|
|
|
PLANE ASPH CONC PAV (1")
|
SY
|
246,742.000
|
$1.300
|
$1.638
|
$1.340
|
$1.290
|
$1.640
|
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,664.000
|
$1.450
|
$1.363
|
$6.140
|
$2.600
|
$2.390
|
|
|
|
PLANE ASPH CONC PAV (3")
|
SY
|
141,738.000
|
$2.000
|
$0.890
|
$2.480
|
$2.550
|
$2.390
|
|
|
|
PLANE ASPH CONC PAV (4")
|
SY
|
624.000
|
$2.800
|
$4.674
|
$17.580
|
$4.950
|
$3.470
|
|
|
|
PLANE ASPH CONC PAV (2"-3")
|
SY
|
4,992.000
|
$4.250
|
$0.857
|
$6.870
|
$3.090
|
$2.390
|
|
|
|
PLANE ASPH CONC PAV (1/2")
|
SY
|
20,586.000
|
$4.250
|
$0.835
|
$2.920
|
$1.450
|
$1.850
|
|
|
|
PLANE ASPH CONC PAV(1" TO 2")
|
SY
|
3,826.000
|
$5.250
|
$1.033
|
$4.290
|
$2.400
|
$1.960
|
|
|
|
PLANE ASPH CONC PAV (3" TO 4")
|
SY
|
1,248.000
|
$5.250
|
$2.474
|
$19.880
|
$5.100
|
$6.710
|
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,273.000
|
$550.000
|
$770.000
|
$825.000
|
$660.000
|
$788.110
|
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
2,612.000
|
$18.000
|
$3.300
|
$10.730
|
$7.500
|
$10.280
|
|
|
|
HEADER TYPE EXPANSION JOINT
|
LF
|
2,612.000
|
$135.000
|
$88.000
|
$73.940
|
$190.000
|
$70.870
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,525,355.290
|
$1,026,344.000
|
$869,755.670
|
$2,000,000.000
|
$2,494,364.940
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$10,000.000
|
$22,837.800
|
$13,865.470
|
$40,000.000
|
$6,500.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
213,167.000
|
$0.150
|
$0.099
|
$0.100
|
$0.250
|
$0.170
|
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
20,645.000
|
$35.000
|
$32.505
|
$33.610
|
$36.000
|
$38.000
|
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
28.000
|
$1,815.000
|
$1,457.500
|
$1,625.980
|
$1,600.000
|
$1,550.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
18,695.000
|
$3.000
|
$1.650
|
$3.300
|
$2.000
|
$2.500
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
28.000
|
$250.000
|
$192.500
|
$302.390
|
$210.000
|
$250.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
28.000
|
$3,000.000
|
$3,580.500
|
$3,552.140
|
$4,000.000
|
$3,500.000
|
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
28.000
|
$300.000
|
$247.500
|
$302.390
|
$270.000
|
$375.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
226.000
|
$35.000
|
$7.700
|
$13.230
|
$14.500
|
$35.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
9.000
|
$30.000
|
$7.700
|
$13.230
|
$14.500
|
$45.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
38.000
|
$100.000
|
$170.500
|
$60.820
|
$70.000
|
$100.000
|
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND
|
EA
|
32.000
|
$142.000
|
$170.500
|
$63.930
|
$70.000
|
$85.000
|
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
29.000
|
$60.000
|
$170.500
|
$65.490
|
$72.000
|
$95.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
219,647.000
|
$0.400
|
$0.220
|
$0.200
|
$0.250
|
$0.200
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
219,647.000
|
$0.270
|
$0.220
|
$0.200
|
$0.250
|
$0.200
|
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD W/MRKR)
|
LF
|
5,760.000
|
$1.200
|
$1.650
|
$1.080
|
$1.800
|
$1.500
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
250.000
|
$1.000
|
$5.500
|
$9.540
|
$1.790
|
$1.490
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
562.000
|
$0.450
|
$5.500
|
$8.550
|
$1.790
|
$1.490
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
2,600.000
|
$1.000
|
$1.100
|
$1.160
|
$1.200
|
$1.000
|
|
|
|
REFL PAV MRK TY II (W) 4" (BRK)
|
LF
|
28,970.000
|
$0.150
|
$0.275
|
$0.170
|
$0.300
|
$0.250
|
|
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
115,965.000
|
$0.150
|
$0.198
|
$0.170
|
$0.220
|
$0.180
|
|
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
2,600.000
|
$0.350
|
$0.550
|
$0.350
|
$0.600
|
$0.500
|
|
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
116,240.000
|
$0.150
|
$0.198
|
$0.170
|
$0.220
|
$0.180
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
28,970.000
|
$0.400
|
$0.495
|
$0.610
|
$0.500
|
$0.450
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
115,965.000
|
$0.400
|
$0.440
|
$0.560
|
$0.480
|
$0.400
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
116,240.000
|
$0.400
|
$0.440
|
$0.560
|
$0.480
|
$0.400
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
41.000
|
$25.000
|
$27.500
|
$27.500
|
$0.300
|
$25.000
|
|
|
|
PREFAB PAV MRK TY C (W) (NUMBER)
|
EA
|
2.000
|
$220.000
|
$550.000
|
$275.000
|
$600.000
|
$500.000
|
|
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
6.000
|
$40.000
|
$110.000
|
$27.500
|
$120.000
|
$100.000
|
|
|
|
PREFAB PAV MRK TY C (Y) (12") (SLD)
|
LF
|
610.000
|
$6.500
|
$8.800
|
$7.700
|
$9.600
|
$8.000
|
|
|
|
REFL PAV MRKR TY I-R
|
EA
|
56.000
|
$5.000
|
$4.950
|
$6.600
|
$5.400
|
$4.500
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
73.000
|
$5.000
|
$4.950
|
$6.600
|
$5.400
|
$4.500
|
|
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,398.000
|
$5.000
|
$4.950
|
$4.950
|
$5.400
|
$4.500
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
445,055.000
|
$0.500
|
$0.385
|
$0.460
|
$0.240
|
$0.200
|
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
16,989.000
|
$115.000
|
$100.899
|
$148.810
|
$135.000
|
$120.600
|
|
|
|
TACK COAT
|
GAL
|
9,110.000
|
$3.500
|
$3.480
|
$5.340
|
$6.340
|
$4.340
|
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
55,920.000
|
$155.000
|
$152.389
|
$172.090
|
$180.000
|
$172.440
|
|
|
|
TACK COAT
|
GAL
|
28,870.000
|
$3.500
|
$3.480
|
$5.180
|
$6.350
|
$4.340
|
|
|
|
CEMENT
|
TON
|
707.000
|
$259.210
|
$281.600
|
$0.000
|
$366.000
|
$291.600
|
|
|
|
EMULSION
|
GAL
|
644,111.000
|
$3.850
|
$3.388
|
$0.000
|
$4.100
|
$3.910
|
|
|
|
EMUL TRTMNT (MX EXST MTRL) 9"
|
SY
|
150,198.000
|
$2.890
|
$5.436
|
$0.000
|
$3.200
|
$3.510
|
|
|
|
FILLING MILLED ASPHALT RUMBLE STRIPS
|
LF
|
213,167.000
|
$4.000
|
$4.852
|
$1.260
|
$0.750
|
$5.040
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
200.000
|
$100.000
|
$93.500
|
$118.730
|
$190.000
|
$450.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
194.000
|
$150.000
|
$275.000
|
$412.940
|
$200.000
|
$750.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
90.000
|
$200.000
|
$275.000
|
$583.590
|
$1,600.000
|
$1,250.000
|
|
1
|
|
CEMENT
|
TON
|
707.000
|
$260.030
|
$0.000
|
$466.560
|
$0.000
|
$0.000
|
|
1
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
1,671.000
|
$1,249.990
|
$0.000
|
$1,000.000
|
$0.000
|
$0.000
|
|
1
|
|
FOAMED ASPHALT TREAT (9")(DC)
|
SY
|
150,198.000
|
$5.490
|
$0.000
|
$4.680
|
$0.000
|
$0.000
|
|
Totals: |
$24,605,071.340
|
$21,298,153.654
|
$22,839,592.650
|
$24,793,848.440
|
$24,957,468.270
|