PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
1.000
|
$640.000
|
$1,000.000
|
$1,500.000
|
$500.000
|
$2,500.000
|
$1,000.000
|
$1,000.000
|
$1,132.460
|
$2,000.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
1.000
|
$650.000
|
$1,600.000
|
$3,000.000
|
$650.000
|
$5,000.000
|
$3,000.000
|
$2,500.000
|
$1,874.730
|
$5,000.000
|
|
|
PREP ROW (TREE) (2" TO 12" DIA)
|
EA
|
21.000
|
$600.000
|
$500.000
|
$800.000
|
$350.000
|
$2,500.000
|
$100.000
|
$500.000
|
$576.850
|
$1,000.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
1,174.000
|
$10.000
|
$30.000
|
$25.000
|
$10.000
|
$20.000
|
$50.000
|
$20.000
|
$12.290
|
$0.010
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
54.000
|
$10.500
|
$22.000
|
$35.000
|
$10.000
|
$20.000
|
$25.000
|
$20.000
|
$12.290
|
$0.010
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
13,768.000
|
$18.000
|
$14.000
|
$25.000
|
$10.000
|
$17.500
|
$20.000
|
$20.000
|
$17.820
|
$0.010
|
|
|
REMOVE CONC (GUTTER)
|
LF
|
146.000
|
$10.000
|
$10.000
|
$10.000
|
$5.000
|
$20.000
|
$10.000
|
$20.000
|
$12.290
|
$0.010
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
10,793.000
|
$10.000
|
$8.000
|
$7.000
|
$3.000
|
$12.500
|
$10.000
|
$20.000
|
$9.830
|
$0.010
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
1,326.000
|
$29.000
|
$10.000
|
$9.000
|
$10.000
|
$20.000
|
$25.000
|
$20.000
|
$13.410
|
$0.010
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
10,191.000
|
$5.000
|
$10.000
|
$15.000
|
$10.000
|
$15.000
|
$10.000
|
$20.000
|
$8.590
|
$8.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
3,545.000
|
$10.000
|
$20.000
|
$17.000
|
$15.000
|
$20.000
|
$10.000
|
$20.000
|
$21.440
|
$21.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
306.000
|
$30.000
|
$15.000
|
$30.000
|
$20.000
|
$35.000
|
$180.000
|
$30.000
|
$43.020
|
$31.500
|
|
|
BLOCK SODDING
|
SY
|
22,015.000
|
$5.000
|
$6.250
|
$5.000
|
$6.000
|
$5.000
|
$5.000
|
$5.000
|
$3.610
|
$3.150
|
|
|
VEGETATIVE WATERING
|
MG
|
770.530
|
$15.000
|
$20.000
|
$1.000
|
$50.000
|
$50.000
|
$100.000
|
$5.000
|
$30.730
|
$10.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
278.000
|
$100.000
|
$100.000
|
$100.000
|
$75.000
|
$85.000
|
$250.000
|
$150.000
|
$86.030
|
$150.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (9")
|
SY
|
483.000
|
$125.000
|
$110.000
|
$115.000
|
$77.000
|
$95.000
|
$300.000
|
$160.000
|
$92.180
|
$160.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
413.000
|
$175.000
|
$125.000
|
$150.000
|
$95.000
|
$125.000
|
$350.000
|
$200.000
|
$98.320
|
$205.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
4.000
|
$200.000
|
$150.000
|
$1,000.000
|
$150.000
|
$350.000
|
$500.000
|
$600.000
|
$272.630
|
$630.000
|
|
|
CL A CONC (FLUME)
|
CY
|
2.000
|
$1,000.000
|
$780.000
|
$1,000.000
|
$450.000
|
$2,000.000
|
$1,000.000
|
$500.000
|
$493.340
|
$2,100.000
|
|
|
CL C CONC (MISC)
|
CY
|
4.000
|
$1,100.000
|
$450.000
|
$1,000.000
|
$1,500.000
|
$2,500.000
|
$3,000.000
|
$500.000
|
$935.180
|
$2,750.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
376.000
|
$95.000
|
$70.000
|
$52.000
|
$60.000
|
$85.000
|
$55.000
|
$80.000
|
$184.360
|
$52.500
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
34.000
|
$475.000
|
$700.000
|
$750.000
|
$450.000
|
$550.000
|
$500.000
|
$400.000
|
$491.620
|
$735.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
7.000
|
$550.000
|
$650.000
|
$750.000
|
$500.000
|
$650.000
|
$500.000
|
$600.000
|
$579.830
|
$735.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
396.000
|
$160.000
|
$90.000
|
$100.000
|
$300.000
|
$150.000
|
$150.000
|
$120.000
|
$86.030
|
$75.000
|
|
|
RAIL (TY PR11)
|
LF
|
90.000
|
$100.000
|
$110.000
|
$115.000
|
$280.000
|
$150.000
|
$120.000
|
$120.000
|
$104.470
|
$90.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
4.000
|
$1,050.000
|
$1,100.000
|
$1,000.000
|
$1,700.000
|
$2,000.000
|
$800.000
|
$1,000.000
|
$1,843.560
|
$2,100.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
1.000
|
$24,400.000
|
$26,000.000
|
$20,000.000
|
$35,000.000
|
$30,000.000
|
$1,600.000
|
$39,899.000
|
$30,726.050
|
$31,500.000
|
|
|
GRATE & FRAME
|
EA
|
53.000
|
$1,400.000
|
$500.000
|
$1,000.000
|
$2,500.000
|
$3,500.000
|
$3,000.000
|
$2,000.000
|
$1,229.040
|
$1,365.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
3.000
|
$1,180.000
|
$1,350.000
|
$1,000.000
|
$1,200.000
|
$2,500.000
|
$300.000
|
$1,200.000
|
$1,514.670
|
$2,100.000
|
|
|
ADJUSTING INLETS
|
EA
|
4.000
|
$1,500.000
|
$1,000.000
|
$750.000
|
$1,100.000
|
$2,500.000
|
$300.000
|
$1,400.000
|
$2,184.600
|
$1,575.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
39.000
|
$1,180.000
|
$1,100.000
|
$750.000
|
$850.000
|
$2,500.000
|
$300.000
|
$1,000.000
|
$1,546.550
|
$2,100.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
30.000
|
$910.000
|
$600.000
|
$200.000
|
$300.000
|
$750.000
|
$200.000
|
$800.000
|
$874.220
|
$525.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
80.000
|
$360.000
|
$500.000
|
$100.000
|
$300.000
|
$850.000
|
$200.000
|
$500.000
|
$697.090
|
$735.000
|
|
|
ADJUSTING MANHOLES (TELEPHONE BOX)
|
EA
|
4.000
|
$810.000
|
$1,350.000
|
$1,000.000
|
$500.000
|
$250.000
|
$1,000.000
|
$1,000.000
|
$1,813.230
|
$735.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
12.000
|
$200.000
|
$200.000
|
$250.000
|
$2,000.000
|
$150.000
|
$100.000
|
$500.000
|
$558.670
|
$120.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$425,000.000
|
$560,000.000
|
$400,000.000
|
$580,000.000
|
$550,000.000
|
$600,000.000
|
$400,000.000
|
$712,844.360
|
$770,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$8,000.000
|
$20,000.000
|
$1,000.000
|
$10,000.000
|
$8,500.000
|
$5,000.000
|
$8,999.000
|
$29,240.960
|
$52,500.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
224.000
|
$7.000
|
$7.500
|
$0.010
|
$30.000
|
$5.000
|
$5.000
|
$5.000
|
$6.010
|
$7.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,976.000
|
$3.000
|
$1.700
|
$0.010
|
$6.000
|
$4.000
|
$1.000
|
$5.000
|
$2.090
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,976.000
|
$1.000
|
$0.500
|
$0.010
|
$1.000
|
$2.000
|
$1.000
|
$1.000
|
$0.610
|
$0.150
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,688.000
|
$4.000
|
$2.800
|
$0.010
|
$7.000
|
$18.000
|
$5.000
|
$5.000
|
$3.440
|
$2.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,688.000
|
$1.000
|
$0.600
|
$0.010
|
$1.000
|
$9.000
|
$1.000
|
$1.000
|
$0.740
|
$1.000
|
|
|
CONC CURB (TY II)
|
LF
|
40.000
|
$18.000
|
$10.000
|
$36.000
|
$12.000
|
$50.000
|
$3.000
|
$20.000
|
$11.110
|
$31.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
9,685.000
|
$30.000
|
$20.000
|
$34.000
|
$7.500
|
$35.000
|
$30.000
|
$30.000
|
$29.820
|
$31.500
|
|
|
CONC CURB (TY IV)
|
LF
|
36.000
|
$13.000
|
$10.000
|
$45.000
|
$20.000
|
$50.000
|
$50.000
|
$100.000
|
$61.450
|
$31.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
22,872.000
|
$80.000
|
$75.000
|
$76.000
|
$80.000
|
$70.000
|
$75.000
|
$80.000
|
$104.370
|
$125.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,399.000
|
$40.000
|
$50.000
|
$55.000
|
$30.000
|
$45.000
|
$55.000
|
$80.000
|
$61.450
|
$63.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
23,963.000
|
$50.000
|
$50.000
|
$60.000
|
$60.000
|
$50.000
|
$61.000
|
$77.000
|
$52.630
|
$75.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
298.000
|
$200.000
|
$110.000
|
$85.000
|
$120.000
|
$200.000
|
$180.000
|
$150.000
|
$215.790
|
$110.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
562.000
|
$180.000
|
$110.000
|
$85.000
|
$125.000
|
$200.000
|
$180.000
|
$150.000
|
$180.210
|
$110.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
202.000
|
$200.000
|
$110.000
|
$85.000
|
$120.000
|
$200.000
|
$180.000
|
$150.000
|
$155.210
|
$112.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
39.000
|
$200.000
|
$125.000
|
$85.000
|
$130.000
|
$200.000
|
$180.000
|
$150.000
|
$205.650
|
$205.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
247.000
|
$130.000
|
$110.000
|
$85.000
|
$120.000
|
$200.000
|
$180.000
|
$150.000
|
$226.050
|
$110.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
933.000
|
$150.000
|
$125.000
|
$85.000
|
$120.000
|
$200.000
|
$180.000
|
$150.000
|
$194.970
|
$110.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
244.000
|
$240.000
|
$100.000
|
$85.000
|
$120.000
|
$200.000
|
$180.000
|
$150.000
|
$291.780
|
$111.000
|
|
|
CURB RAMPS (TY 21)
|
SY
|
87.000
|
$190.000
|
$150.000
|
$85.000
|
$130.000
|
$200.000
|
$180.000
|
$150.000
|
$212.830
|
$140.000
|
|
|
CURB RAMPS (TY 22)
|
SY
|
26.000
|
$260.000
|
$110.000
|
$85.000
|
$130.000
|
$200.000
|
$180.000
|
$150.000
|
$248.830
|
$180.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
52.000
|
$170.000
|
$80.000
|
$200.000
|
$95.000
|
$85.000
|
$350.000
|
$200.000
|
$151.320
|
$400.000
|
|
|
CONCRETE SIDEWALK (STEPS)
|
SY
|
1.000
|
$500.000
|
$1,000.000
|
$200.000
|
$500.000
|
$2,000.000
|
$2,000.000
|
$1,000.000
|
$441.030
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
100.000
|
$3.000
|
$2.500
|
$10.000
|
$10.000
|
$3.000
|
$10.000
|
$5.000
|
$3.170
|
$5.320
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$204.000
|
$225.000
|
$150.000
|
$500.000
|
$500.000
|
$500.000
|
$1,000.000
|
$267.630
|
$318.990
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
28.000
|
$181.000
|
$200.000
|
$500.000
|
$150.000
|
$850.000
|
$500.000
|
$400.000
|
$241.860
|
$239.240
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
40.000
|
$18.000
|
$18.750
|
$35.000
|
$40.000
|
$20.000
|
$35.000
|
$20.000
|
$23.040
|
$34.490
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
30.000
|
$2.000
|
$2.000
|
$5.000
|
$10.000
|
$3.000
|
$4.000
|
$5.000
|
$2.460
|
$3.420
|
|
|
GROUND BOX TY D (162922)
|
EA
|
48.000
|
$1,050.000
|
$985.490
|
$3,200.000
|
$4,000.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$1,211.210
|
$1,060.800
|
|
|
REMOVE GROUND BOX
|
EA
|
48.000
|
$310.000
|
$355.000
|
$350.000
|
$500.000
|
$250.000
|
$355.000
|
$200.000
|
$436.310
|
$349.290
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
108.000
|
$490.000
|
$551.890
|
$275.000
|
$450.000
|
$650.000
|
$385.000
|
$300.000
|
$678.300
|
$409.600
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
4.000
|
$100.000
|
$155.000
|
$55.000
|
$350.000
|
$650.000
|
$274.000
|
$300.000
|
$190.500
|
$291.080
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
6.000
|
$100.000
|
$75.000
|
$125.000
|
$20.000
|
$100.000
|
$75.000
|
$65.000
|
$73.440
|
$132.910
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
2.000
|
$100.000
|
$100.000
|
$275.000
|
$600.000
|
$100.000
|
$75.000
|
$100.000
|
$97.620
|
$212.660
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
1.000
|
$250.000
|
$300.000
|
$385.000
|
$600.000
|
$100.000
|
$75.000
|
$300.000
|
$290.520
|
$212.660
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
1.000
|
$250.000
|
$250.000
|
$500.000
|
$650.000
|
$100.000
|
$75.000
|
$300.000
|
$261.050
|
$212.660
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
6.000
|
$25.000
|
$20.000
|
$60.000
|
$50.000
|
$50.000
|
$50.000
|
$40.000
|
$31.280
|
$79.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
4,476.000
|
$7.000
|
$4.940
|
$5.500
|
$15.000
|
$13.000
|
$11.000
|
$8.000
|
$6.070
|
$5.250
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
4,476.000
|
$3.000
|
$0.460
|
$0.500
|
$10.000
|
$7.000
|
$11.000
|
$5.000
|
$0.570
|
$0.490
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
1,745.000
|
$2.000
|
$1.000
|
$1.000
|
$10.000
|
$7.000
|
$6.000
|
$3.000
|
$1.230
|
$1.060
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,626.000
|
$3.000
|
$1.750
|
$2.000
|
$15.000
|
$12.000
|
$11.000
|
$5.000
|
$2.150
|
$1.860
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
4,476.000
|
$1.000
|
$0.250
|
$0.300
|
$10.000
|
$7.000
|
$6.000
|
$2.000
|
$0.310
|
$0.270
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
5.000
|
$600.000
|
$735.330
|
$2,000.000
|
$2,500.000
|
$1,000.000
|
$500.000
|
$600.000
|
$903.750
|
$506.270
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
910.000
|
$2.000
|
$1.280
|
$4.500
|
$6.000
|
$3.000
|
$1.250
|
$3.000
|
$1.570
|
$1.310
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
920.000
|
$2.000
|
$3.000
|
$4.500
|
$6.000
|
$3.000
|
$2.000
|
$3.000
|
$3.690
|
$1.550
|
|
|
PED POLE ASSEMBLY
|
EA
|
3.000
|
$2,270.000
|
$2,280.000
|
$6,500.000
|
$8,000.000
|
$200.000
|
$1,601.000
|
$3,000.000
|
$2,802.410
|
$1,702.340
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
30.000
|
$820.000
|
$643.890
|
$1,500.000
|
$1,600.000
|
$1,200.000
|
$1,600.000
|
$800.000
|
$791.370
|
$1,247.620
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
8.000
|
$3,500.000
|
$3,745.320
|
$6,000.000
|
$6,750.000
|
$4,000.000
|
$4,038.000
|
$3,500.000
|
$4,603.160
|
$4,293.710
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
1.000
|
$220.000
|
$145.150
|
$200.000
|
$250.000
|
$250.000
|
$220.000
|
$100.000
|
$178.400
|
$232.860
|
|
|
INSTALL OF SIGNAL HEAD ASSM
|
EA
|
1.000
|
$340.000
|
$358.290
|
$2,000.000
|
$2,500.000
|
$350.000
|
$600.000
|
$600.000
|
$440.350
|
$582.160
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
25.000
|
$90.000
|
$197.440
|
$60.000
|
$120.000
|
$250.000
|
$110.000
|
$200.000
|
$242.660
|
$116.430
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
274.000
|
$75.000
|
$55.780
|
$60.000
|
$150.000
|
$100.000
|
$100.000
|
$300.000
|
$61.450
|
$157.500
|
|
|
TMA (STATIONARY)
|
DAY
|
195.000
|
$125.000
|
$100.000
|
$60.000
|
$300.000
|
$250.000
|
$300.000
|
$300.000
|
$245.810
|
$157.500
|
|
|
GAS VALVE BOX ADJUSTMENT
|
EA
|
13.000
|
$1,000.000
|
$1,000.000
|
$115.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$2,000.000
|
$1,843.560
|
$475.000
|
|
Totals: |
$5,865,065.950
|
$5,671,661.160
|
$5,857,230.850
|
$6,310,270.000
|
$6,525,630.000
|
$6,751,570.500
|
$6,987,974.650
|
$7,234,940.347
|
$7,979,813.820
|