|
|
REMOVING CONC (RIPRAP)
|
SY
|
507.000
|
$15.000
|
$15.000
|
$25.000
|
$12.000
|
$20.000
|
$19.070
|
$42.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
20.000
|
$25.000
|
$15.000
|
$25.000
|
$12.000
|
$20.000
|
$23.880
|
$42.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
1.000
|
$100.000
|
$100.000
|
$800.000
|
$1,000.000
|
$1,100.000
|
$1,317.600
|
$630.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,319.000
|
$20.000
|
$15.000
|
$20.000
|
$15.000
|
$20.000
|
$17.730
|
$42.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
3,688.000
|
$10.000
|
$5.000
|
$5.000
|
$8.000
|
$20.000
|
$11.020
|
$21.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
320.000
|
$15.000
|
$15.000
|
$25.000
|
$12.000
|
$20.000
|
$20.800
|
$42.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
545.000
|
$12.000
|
$15.000
|
$15.000
|
$12.000
|
$20.000
|
$10.420
|
$31.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
655.000
|
$2.500
|
$2.000
|
$5.000
|
$3.000
|
$5.500
|
$1.750
|
$10.500
|
|
|
BLOCK SODDING
|
SY
|
7,379.000
|
$6.000
|
$5.000
|
$6.000
|
$4.000
|
$5.000
|
$6.250
|
$10.500
|
|
|
VEGETATIVE WATERING
|
MG
|
115.110
|
$30.000
|
$20.000
|
$100.000
|
$110.000
|
$60.000
|
$52.700
|
$63.000
|
|
|
D-GR HMA(SQ) TY-D PG70-22
|
TON
|
28.500
|
$200.000
|
$500.000
|
$250.000
|
$300.000
|
$200.000
|
$194.400
|
$420.000
|
|
|
CL C CONC (MISC)
|
CY
|
1.800
|
$600.000
|
$1,000.000
|
$1,000.000
|
$1,000.000
|
$1,100.000
|
$671.560
|
$5,250.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
702.000
|
$100.000
|
$50.000
|
$45.000
|
$50.000
|
$45.000
|
$77.760
|
$105.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
96.700
|
$450.000
|
$800.000
|
$500.000
|
$750.000
|
$650.000
|
$770.800
|
$630.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
15.000
|
$150.000
|
$200.000
|
$180.000
|
$150.000
|
$185.000
|
$171.020
|
$136.500
|
|
|
GRATE & FRAME
|
EA
|
6.000
|
$1,200.000
|
$1,500.000
|
$1,000.000
|
$500.000
|
$5,000.000
|
$3,588.260
|
$3,150.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
8.000
|
$600.000
|
$500.000
|
$500.000
|
$300.000
|
$1,500.000
|
$1,719.610
|
$1,680.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
2.000
|
$300.000
|
$200.000
|
$1,000.000
|
$300.000
|
$500.000
|
$437.440
|
$257.500
|
|
|
REMOV STR (DRAINAGE FLUME)
|
EA
|
1.000
|
$300.000
|
$1,000.000
|
$500.000
|
$300.000
|
$1,500.000
|
$6,588.000
|
$2,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$105,000.000
|
$250,000.000
|
$160,000.000
|
$400,000.000
|
$210,000.000
|
$217,404.000
|
$272,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$2,200.000
|
$5,000.000
|
$5,000.000
|
$2,000.000
|
$8,500.000
|
$9,882.000
|
$31,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,000.000
|
$5.000
|
$10.000
|
$5.000
|
$0.100
|
$15.000
|
$9.440
|
$10.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$1.000
|
$1.000
|
$0.100
|
$8.000
|
$1.680
|
$2.100
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
6.000
|
$70.000
|
$200.000
|
$150.000
|
$150.000
|
$2,000.000
|
$103.120
|
$94.500
|
|
|
CONC CURB (TY I)
|
LF
|
111.000
|
$20.000
|
$10.000
|
$20.000
|
$30.000
|
$30.000
|
$10.250
|
$11.550
|
|
|
CONC CURB (TY II)
|
LF
|
1,445.000
|
$25.000
|
$15.000
|
$20.000
|
$30.000
|
$35.000
|
$33.620
|
$13.650
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,994.000
|
$35.000
|
$30.000
|
$25.000
|
$35.000
|
$42.000
|
$35.650
|
$31.500
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,678.000
|
$75.000
|
$70.000
|
$65.000
|
$75.000
|
$85.000
|
$89.770
|
$73.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
280.000
|
$65.000
|
$50.000
|
$60.000
|
$50.000
|
$42.000
|
$54.130
|
$210.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
6,016.000
|
$55.000
|
$45.000
|
$55.000
|
$70.000
|
$62.000
|
$67.490
|
$63.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
43.000
|
$1,400.000
|
$1,500.000
|
$1,100.000
|
$1,400.000
|
$1,850.000
|
$1,895.700
|
$2,550.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
33.000
|
$1,600.000
|
$1,500.000
|
$1,800.000
|
$1,400.000
|
$1,850.000
|
$1,525.420
|
$2,450.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
19.000
|
$1,500.000
|
$1,500.000
|
$1,800.000
|
$1,400.000
|
$1,850.000
|
$2,293.360
|
$2,700.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
99.000
|
$1,400.000
|
$1,500.000
|
$1,100.000
|
$1,400.000
|
$1,850.000
|
$1,700.200
|
$2,050.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
9.000
|
$1,300.000
|
$1,500.000
|
$1,100.000
|
$1,400.000
|
$1,850.000
|
$2,182.060
|
$2,350.000
|
|
|
CURB RAMPS (TY 20)
|
EA
|
1.000
|
$2,000.000
|
$1,500.000
|
$2,500.000
|
$2,500.000
|
$1,850.000
|
$3,060.820
|
$1,650.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
7.000
|
$2,200.000
|
$1,500.000
|
$2,000.000
|
$2,500.000
|
$1,850.000
|
$2,416.390
|
$3,100.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
238.000
|
$100.000
|
$100.000
|
$100.000
|
$100.000
|
$65.000
|
$72.200
|
$420.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
210.000
|
$10.000
|
$15.000
|
$30.000
|
$12.000
|
$15.000
|
$23.920
|
$35.580
|
|
|
GROUND BOX TY D (162922)
|
EA
|
70.000
|
$600.000
|
$200.000
|
$1,100.000
|
$450.000
|
$650.000
|
$911.610
|
$1,500.990
|
|
|
REMOVE GROUND BOX
|
EA
|
57.000
|
$200.000
|
$100.000
|
$500.000
|
$50.000
|
$150.000
|
$212.600
|
$459.130
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$1,200.000
|
$500.000
|
$1,000.000
|
$150.000
|
$650.000
|
$998.300
|
$993.290
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
55.000
|
$300.000
|
$200.000
|
$700.000
|
$350.000
|
$500.000
|
$410.120
|
$548.480
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$100.000
|
$100.000
|
$500.000
|
$150.000
|
$50.000
|
$116.230
|
$167.560
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
1.000
|
$200.000
|
$1,000.000
|
$100.000
|
$150.000
|
$100.000
|
$128.120
|
$92.300
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
2.000
|
$200.000
|
$1,000.000
|
$100.000
|
$150.000
|
$100.000
|
$143.290
|
$107.360
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
3.000
|
$25.000
|
$10.000
|
$700.000
|
$150.000
|
$100.000
|
$50.830
|
$32.910
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
45.000
|
$3.000
|
$5.000
|
$2.000
|
$2.000
|
$5.000
|
$1.550
|
$3.530
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
3,536.000
|
$5.000
|
$10.000
|
$4.000
|
$3.300
|
$5.000
|
$3.510
|
$5.830
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,059.000
|
$7.000
|
$15.000
|
$6.000
|
$5.500
|
$12.000
|
$7.270
|
$9.710
|
|
|
PAVEMENT SEALER 4"
|
LF
|
107.000
|
$0.750
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$0.630
|
$1.770
|
|
|
PAVEMENT SEALER 8"
|
LF
|
45.000
|
$0.850
|
$2.000
|
$2.000
|
$2.000
|
$1.000
|
$1.100
|
$3.530
|
|
|
PAVEMENT SEALER 12"
|
LF
|
3,536.000
|
$1.000
|
$1.000
|
$3.000
|
$2.250
|
$1.000
|
$3.290
|
$3.970
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,059.000
|
$1.250
|
$1.000
|
$3.000
|
$3.000
|
$1.000
|
$5.090
|
$5.300
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
27.000
|
$2.000
|
$10.000
|
$2.000
|
$2.000
|
$2.000
|
$0.360
|
$3.530
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
80.000
|
$2.000
|
$10.000
|
$2.000
|
$2.000
|
$2.000
|
$0.380
|
$3.530
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
232.000
|
$1.250
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
$0.790
|
$1.770
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
210.000
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
$1.900
|
$1.770
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
3,997.000
|
$2.500
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
$3.130
|
$1.770
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,090.000
|
$3.000
|
$1.000
|
$1.000
|
$1.500
|
$12.000
|
$5.820
|
$2.650
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
107.000
|
$0.250
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$0.820
|
$1.770
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
45.000
|
$0.300
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$4.940
|
$1.770
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
3,536.000
|
$0.400
|
$1.000
|
$1.000
|
$1.000
|
$5.000
|
$3.370
|
$1.770
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,059.000
|
$0.500
|
$1.000
|
$1.000
|
$1.000
|
$12.000
|
$3.760
|
$1.770
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
10,000.000
|
$2.000
|
$0.500
|
$12.000
|
$0.100
|
$1.000
|
$13.180
|
$16.780
|
|
|
REMOVAL OF SIGNAL HEAD ASSM
|
EA
|
4.000
|
$200.000
|
$500.000
|
$500.000
|
$550.000
|
$500.000
|
$201.700
|
$697.520
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
84.000
|
$75.000
|
$100.000
|
$100.000
|
$50.000
|
$500.000
|
$101.180
|
$176.590
|
|
|
INSTALL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
77.000
|
$400.000
|
$200.000
|
$300.000
|
$400.000
|
$1,500.000
|
$527.040
|
$512.100
|
|
|
REMOVE PED POLE ASSM
|
EA
|
1.000
|
$200.000
|
$1,000.000
|
$1,800.000
|
$1,500.000
|
$500.000
|
$733.300
|
$874.110
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
20.000
|
$200.000
|
$500.000
|
$1,000.000
|
$450.000
|
$1,000.000
|
$133.480
|
$1,575.000
|
|
|
RETROFIT DET WARN SURF(SURF APP OR CIP)
|
EA
|
3.000
|
$350.000
|
$500.000
|
$350.000
|
$450.000
|
$5,000.000
|
$1,035.260
|
$315.000
|
|
|
CURB INLET SEDIMENT PROTECTION
|
LF
|
2,000.000
|
$4.000
|
$5.000
|
$5.000
|
$0.100
|
$5.000
|
$8.830
|
$15.750
|
|
Totals: |
$1,600,996.700
|
$1,617,402.200
|
$1,756,825.000
|
$1,898,619.400
|
$2,204,711.100
|
$2,216,838.545
|
$2,890,246.190
|