REMOVING CONC (RIPRAP)
|
SY
|
37.000
|
$16.000
|
$20.000
|
$15.000
|
$30.000
|
$10.000
|
$31.000
|
$20.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
9.000
|
$15.000
|
$20.000
|
$31.000
|
$25.000
|
$25.000
|
$42.000
|
$20.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
SY
|
1.500
|
$1,000.000
|
$100.000
|
$14.410
|
$25.000
|
$100.000
|
$650.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
2,540.000
|
$14.240
|
$20.000
|
$10.160
|
$25.000
|
$20.000
|
$17.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
29.000
|
$5.000
|
$10.000
|
$8.680
|
$10.000
|
$10.000
|
$17.000
|
$20.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
2,201.000
|
$6.190
|
$10.000
|
$5.080
|
$9.000
|
$5.000
|
$17.000
|
$20.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
217.000
|
$25.000
|
$20.000
|
$14.650
|
$25.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
732.000
|
$15.000
|
$20.000
|
$2.500
|
$15.000
|
$15.000
|
$15.000
|
$20.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
660.000
|
$10.000
|
$20.000
|
$8.000
|
$1.000
|
$25.000
|
$38.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
55.000
|
$25.000
|
$30.000
|
$25.000
|
$1.000
|
$30.000
|
$41.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
350.000
|
$7.500
|
$30.000
|
$250.000
|
$1.000
|
$30.000
|
$33.000
|
$30.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
9,747.000
|
$7.300
|
$2.000
|
$1.000
|
$3.000
|
$5.000
|
$0.900
|
$6.000
|
|
|
BLOCK SODDING
|
SY
|
9,747.000
|
$4.100
|
$4.000
|
$3.500
|
$8.000
|
$5.000
|
$5.500
|
$6.000
|
|
|
VEGETATIVE WATERING
|
MG
|
341.150
|
$10.000
|
$40.000
|
$199.000
|
$1.000
|
$20.000
|
$59.500
|
$60.000
|
|
|
D-GR HMA(SQ) TY-C PG70-22
|
TON
|
179.700
|
$137.400
|
$300.000
|
$300.000
|
$225.000
|
$250.000
|
$732.000
|
$140.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
249.000
|
$16.000
|
$5.000
|
$140.000
|
$15.000
|
$15.000
|
$20.000
|
$20.000
|
|
|
CONC PAV (JOINT REINF) (10")
|
SY
|
250.000
|
$60.000
|
$150.000
|
$130.000
|
$150.000
|
$180.000
|
$75.000
|
$150.000
|
|
|
CL A CONC (MISC)
|
CY
|
20.000
|
$540.000
|
$800.000
|
$620.000
|
$1,050.000
|
$1,000.000
|
$419.000
|
$1,500.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
1.000
|
$750.000
|
$1,000.000
|
$850.000
|
$1,000.000
|
$1,500.000
|
$800.000
|
$1,500.000
|
|
|
CL C CONC (MISC)
|
CY
|
4.900
|
$750.000
|
$1,000.000
|
$720.000
|
$1,100.000
|
$1,000.000
|
$1,400.000
|
$1,500.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
76.000
|
$200.000
|
$30.000
|
$90.000
|
$55.000
|
$300.000
|
$150.000
|
$500.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
41.700
|
$550.000
|
$600.000
|
$509.000
|
$1,000.000
|
$400.000
|
$500.000
|
$650.000
|
|
|
RAIL (HANDRAIL)(TY C)
|
LF
|
240.000
|
$115.000
|
$100.000
|
$90.000
|
$115.000
|
$120.000
|
$100.000
|
$185.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
32.000
|
$88.880
|
$50.000
|
$53.000
|
$100.000
|
$45.000
|
$90.000
|
$65.000
|
|
|
CMP AR (GAL STL DES 2)
|
LF
|
20.000
|
$40.090
|
$100.000
|
$74.360
|
$100.000
|
$45.000
|
$100.000
|
$75.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 2)
|
LF
|
30.000
|
$110.000
|
$125.000
|
$183.000
|
$100.000
|
$70.000
|
$300.000
|
$150.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,055.320
|
$800.000
|
$2,500.000
|
$1,500.000
|
$1,000.000
|
$1,500.000
|
$1,850.000
|
|
|
SET (TY II) (27 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,830.000
|
$1,500.000
|
$3,000.000
|
$1,500.000
|
$1,000.000
|
$2,500.000
|
$3,000.000
|
|
|
GRATE & FRAME
|
EA
|
97.000
|
$2,500.000
|
$500.000
|
$1,500.000
|
$900.000
|
$5,000.000
|
$800.000
|
$2,500.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
12.000
|
$600.000
|
$500.000
|
$1,150.000
|
$550.000
|
$500.000
|
$1,275.000
|
$1,500.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
10.000
|
$250.000
|
$100.000
|
$574.000
|
$150.000
|
$500.000
|
$705.000
|
$750.000
|
|
|
ADJUSTING MANHOLES (WATER METER)
|
EA
|
35.000
|
$250.000
|
$100.000
|
$626.000
|
$150.000
|
$500.000
|
$605.000
|
$750.000
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$5,000.000
|
$600.000
|
$700.000
|
$250.000
|
$500.000
|
$660.000
|
$1,500.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$579.770
|
$1,000.000
|
$2,000.000
|
$150.000
|
$500.000
|
$1,920.000
|
$2,500.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
2.000
|
$120.000
|
$100.000
|
$254.000
|
$150.000
|
$200.000
|
$607.000
|
$150.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$207,298.200
|
$350,000.000
|
$220,000.000
|
$270,000.000
|
$350,000.000
|
$308,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$5,000.000
|
$10,000.000
|
$2,500.000
|
$5,000.000
|
$40,000.000
|
$8,500.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
2,000.000
|
$2.500
|
$1.000
|
$4.750
|
$0.100
|
$1.000
|
$4.750
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,000.000
|
$2.000
|
$3.000
|
$1.700
|
$0.100
|
$1.000
|
$1.600
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,000.000
|
$0.750
|
$0.010
|
$0.800
|
$0.100
|
$1.000
|
$0.500
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
2,000.000
|
$4.000
|
$5.000
|
$3.900
|
$0.100
|
$1.000
|
$3.850
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
2,000.000
|
$1.000
|
$0.010
|
$0.800
|
$0.100
|
$1.000
|
$0.750
|
$12.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
7.000
|
$50.000
|
$100.000
|
$700.000
|
$115.000
|
$150.000
|
$150.000
|
$200.000
|
|
|
CONC CURB (TY II)
|
LF
|
294.000
|
$20.000
|
$15.000
|
$20.000
|
$35.000
|
$20.000
|
$15.000
|
$25.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
158.000
|
$50.000
|
$25.000
|
$15.000
|
$40.000
|
$35.000
|
$30.000
|
$35.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,411.000
|
$30.000
|
$35.000
|
$30.000
|
$35.000
|
$30.000
|
$30.000
|
$35.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
3,163.000
|
$70.000
|
$75.000
|
$80.000
|
$85.000
|
$75.000
|
$75.000
|
$85.000
|
|
|
TURNOUTS (CONC)
|
SY
|
97.000
|
$105.000
|
$100.000
|
$150.000
|
$150.000
|
$75.000
|
$95.000
|
$85.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
8,626.000
|
$80.000
|
$50.000
|
$60.000
|
$95.000
|
$60.000
|
$75.000
|
$58.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
280.000
|
$54.000
|
$60.000
|
$56.000
|
$85.000
|
$65.000
|
$80.000
|
$68.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
12.000
|
$85.000
|
$100.000
|
$175.000
|
$85.000
|
$75.000
|
$85.000
|
$80.000
|
|
|
CURB RAMPS (TY 1)
|
SY
|
305.000
|
$100.000
|
$140.000
|
$108.000
|
$120.000
|
$110.000
|
$130.000
|
$160.000
|
|
|
CURB RAMPS (TY 2)
|
SY
|
560.000
|
$100.000
|
$140.000
|
$101.000
|
$120.000
|
$110.000
|
$134.000
|
$160.000
|
|
|
CURB RAMPS (TY 3)
|
SY
|
358.000
|
$100.000
|
$140.000
|
$99.000
|
$120.000
|
$110.000
|
$120.000
|
$160.000
|
|
|
CURB RAMPS (TY 5)
|
SY
|
185.000
|
$100.000
|
$140.000
|
$114.000
|
$120.000
|
$110.000
|
$150.000
|
$160.000
|
|
|
CURB RAMPS (TY 6)
|
SY
|
496.000
|
$100.000
|
$140.000
|
$100.000
|
$120.000
|
$110.000
|
$120.000
|
$160.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
1,276.000
|
$100.000
|
$140.000
|
$100.000
|
$120.000
|
$110.000
|
$177.000
|
$160.000
|
|
|
CURB RAMPS (TY 10)
|
SY
|
613.000
|
$100.000
|
$140.000
|
$100.000
|
$120.000
|
$110.000
|
$120.000
|
$160.000
|
|
|
CURB RAMPS (TY 11)
|
SY
|
14.000
|
$120.000
|
$140.000
|
$115.000
|
$120.000
|
$110.000
|
$150.000
|
$160.000
|
|
|
CURB RAMPS (TY 21)
|
SY
|
9.000
|
$120.000
|
$140.000
|
$155.000
|
$120.000
|
$110.000
|
$250.000
|
$160.000
|
|
|
CURB RAMPS (TY 22)
|
SY
|
42.000
|
$120.000
|
$140.000
|
$120.000
|
$120.000
|
$110.000
|
$250.000
|
$160.000
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
242.000
|
$95.000
|
$100.000
|
$150.000
|
$120.000
|
$150.000
|
$250.000
|
$95.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
2.000
|
$350.000
|
$300.000
|
$140.000
|
$250.000
|
$400.000
|
$200.000
|
$650.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
148.000
|
$23.000
|
$20.000
|
$15.420
|
$26.000
|
$30.000
|
$14.200
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
148.000
|
$25.000
|
$50.000
|
$30.000
|
$25.000
|
$80.000
|
$28.000
|
$40.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
158.000
|
$2.000
|
$10.000
|
$2.400
|
$15.000
|
$10.000
|
$2.300
|
$3.000
|
|
|
GROUND BOX TY C (162911)
|
EA
|
45.000
|
$870.390
|
$500.000
|
$930.000
|
$800.000
|
$700.000
|
$840.400
|
$1,000.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
16.000
|
$1,100.000
|
$800.000
|
$1,084.300
|
$850.000
|
$1,000.000
|
$904.300
|
$1,000.000
|
|
|
REMOVE GROUND BOX
|
EA
|
61.000
|
$410.000
|
$100.000
|
$280.340
|
$250.000
|
$500.000
|
$471.800
|
$300.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
68.000
|
$351.130
|
$20.000
|
$481.000
|
$250.000
|
$350.000
|
$335.440
|
$650.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
6,729.000
|
$7.820
|
$10.000
|
$5.100
|
$10.000
|
$5.000
|
$6.000
|
$10.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
6,729.000
|
$2.300
|
$3.000
|
$1.700
|
$3.000
|
$3.000
|
$2.000
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
315.000
|
$1.000
|
$2.000
|
$0.550
|
$2.000
|
$1.000
|
$1.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
97.000
|
$1.000
|
$3.000
|
$0.770
|
$3.000
|
$5.000
|
$1.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
5,480.000
|
$3.000
|
$2.000
|
$1.500
|
$3.000
|
$2.000
|
$1.250
|
$8.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,481.000
|
$3.150
|
$4.000
|
$1.000
|
$5.000
|
$5.000
|
$3.000
|
$12.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
6,729.000
|
$1.030
|
$2.000
|
$0.700
|
$2.000
|
$3.000
|
$1.500
|
$12.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
3.000
|
$700.000
|
$1,000.000
|
$570.000
|
$1,500.000
|
$10,000.000
|
$568.100
|
$5,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
4.000
|
$1,974.000
|
$2,000.000
|
$2,400.000
|
$2,500.000
|
$5,000.000
|
$2,312.000
|
$3,000.000
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
49.000
|
$394.850
|
$300.000
|
$700.000
|
$350.000
|
$450.000
|
$638.900
|
$1,250.000
|
|
|
INSTALL OF VEHICLE DETECTORS
|
LF
|
10,000.000
|
$3.800
|
$0.010
|
$1.550
|
$0.100
|
$2.000
|
$4.000
|
$10.000
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
2.000
|
$500.000
|
$500.000
|
$800.000
|
$150.000
|
$1,000.000
|
$520.900
|
$2,500.000
|
|
|
REMOVAL OF PEDESTRIAN PUSH BUTTONS
|
EA
|
49.000
|
$137.080
|
$100.000
|
$120.000
|
$50.000
|
$200.000
|
$103.200
|
$500.000
|
|
|
REMOV PED SIG LED TRAF SIG LAMP UNIT
|
EA
|
5.000
|
$122.340
|
$600.000
|
$130.000
|
$1,500.000
|
$5,000.000
|
$117.900
|
$500.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
4.000
|
$650.000
|
$500.000
|
$200.000
|
$1,500.000
|
$500.000
|
$1,000.000
|
$1,000.000
|
|
|
STUMP REMOVAL
|
EA
|
1.000
|
$500.000
|
$500.000
|
$500.000
|
$1,500.000
|
$500.000
|
$1,100.000
|
$1,000.000
|
|
|
TREE AND BRUSH REMOVAL
|
AC
|
0.250
|
$5,000.000
|
$10,000.000
|
$3,664.000
|
$11,000.000
|
$10,000.000
|
$6,500.000
|
$3,000.000
|
|
|
RETROFIT DET WARN SURF(SURF APP OR CIP)
|
EA
|
10.000
|
$500.000
|
$400.000
|
$800.000
|
$500.000
|
$350.000
|
$180.000
|
$1,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$5,000.000
|
$3,000.000
|
$9,748.000
|
$5,000.000
|
$10,000.000
|
$2,000.000
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$7,500.000
|
$2,000.000
|
$10,000.000
|
$4,000.000
|
$25,000.000
|
$10,000.000
|
$25,000.000
|
|
Totals: |
$2,624,564.370
|
$2,419,003.000
|
$2,590,994.055
|
$2,822,851.150
|
$3,081,822.000
|
$3,102,578.145
|
$3,515,170.000
|