PREPARING ROW
|
STA
|
15.000
|
$947.920
|
$2,500.000
|
$3,500.000
|
$3,960.000
|
$17,000.000
|
$13,500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
131.000
|
$37.000
|
$50.000
|
$90.000
|
$95.000
|
$12.430
|
$100.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
643.000
|
$22.600
|
$75.000
|
$25.000
|
$300.000
|
$29.000
|
$50.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
52.000
|
$7.400
|
$50.000
|
$60.000
|
$324.500
|
$69.000
|
$100.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
737.000
|
$5.000
|
$15.000
|
$8.000
|
$11.000
|
$10.000
|
$10.000
|
|
|
AGGR(TY-B GR-3 SAC-B)
|
CY
|
29.000
|
$150.000
|
$400.000
|
$700.000
|
$616.000
|
$560.000
|
$400.000
|
|
|
PLAN & TEXT ASPH CONC PAV(2" TO 4")
|
SY
|
1,338.000
|
$6.000
|
$15.000
|
$7.000
|
$7.680
|
$8.910
|
$20.000
|
|
|
CL C CONC (CRASHWALL)
|
CY
|
118.000
|
$1,000.000
|
$1,000.000
|
$2,500.000
|
$1,900.000
|
$1,083.920
|
$2,500.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
166.000
|
$20.000
|
$23.000
|
$9.700
|
$10.000
|
$8.000
|
$20.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
210.000
|
$282.860
|
$200.000
|
$188.500
|
$140.000
|
$250.000
|
$500.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
421.500
|
$300.000
|
$275.000
|
$250.000
|
$200.000
|
$223.000
|
$500.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
6.000
|
$701.000
|
$700.000
|
$700.000
|
$2,150.000
|
$2,000.000
|
$650.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
1,768.000
|
$245.900
|
$225.000
|
$310.000
|
$166.100
|
$149.060
|
$300.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
214.000
|
$539.000
|
$450.000
|
$650.000
|
$770.000
|
$599.070
|
$550.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
680.000
|
$40.000
|
$50.000
|
$47.000
|
$54.000
|
$35.000
|
$100.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$30,000.000
|
$300,000.000
|
$345,000.000
|
$312,928.000
|
$350,000.000
|
$384,000.000
|
|
|
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
|
LS
|
1.000
|
$24,000.000
|
$15,000.000
|
$17,000.000
|
$15,400.000
|
$14,000.000
|
$30,000.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
234.000
|
$125.000
|
$200.000
|
$103.000
|
$137.500
|
$85.000
|
$250.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
245.000
|
$673.000
|
$550.000
|
$495.000
|
$800.000
|
$274.590
|
$1,000.000
|
|
|
JOINT SEALANT
|
LF
|
350.000
|
$38.000
|
$25.000
|
$39.000
|
$35.000
|
$29.000
|
$50.000
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$50,000.000
|
$50,000.000
|
$100,000.000
|
$31,000.000
|
$50,000.000
|
$100,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$162,449.310
|
$350,000.000
|
$200,000.000
|
$256,000.000
|
$260,000.000
|
$300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$8,547.880
|
$10,000.000
|
$3,550.000
|
$16,000.000
|
$35,000.000
|
$8,500.000
|
|
|
FURNISH ADDITIONAL ARROW BOARD
|
HR
|
168.000
|
$15.000
|
$6.000
|
$28.000
|
$10.000
|
$50.000
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
20.000
|
$32.000
|
$35.000
|
$75.000
|
$167.750
|
$33.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
20.000
|
$14.000
|
$15.000
|
$25.000
|
$55.000
|
$15.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
222.000
|
$24.500
|
$35.000
|
$100.000
|
$52.800
|
$27.500
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
222.000
|
$7.600
|
$15.000
|
$35.000
|
$38.500
|
$10.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
445.000
|
$2.800
|
$4.000
|
$11.000
|
$9.630
|
$3.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
445.000
|
$0.700
|
$1.500
|
$5.000
|
$2.590
|
$1.000
|
$2.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,500.000
|
$13.100
|
$15.000
|
$18.500
|
$12.000
|
$9.540
|
$30.000
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
1,500.000
|
$8.000
|
$30.000
|
$18.500
|
$12.000
|
$13.040
|
$30.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,600.000
|
$30.000
|
$20.000
|
$29.500
|
$28.600
|
$24.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,000.000
|
$1,500.000
|
$2,187.000
|
$2,310.000
|
$1,800.000
|
$1,850.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,381.800
|
$1,500.000
|
$1,650.000
|
$1,650.000
|
$1,350.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,700.000
|
$10.000
|
$6.000
|
$3.050
|
$2.200
|
$2.500
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$250.000
|
$750.000
|
$305.000
|
$220.000
|
$250.000
|
$500.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
1.000
|
$216.100
|
$750.000
|
$305.000
|
$220.000
|
$250.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,200.000
|
$3,000.000
|
$3,400.000
|
$3,960.000
|
$2,800.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$272.600
|
$500.000
|
$305.000
|
$220.000
|
$250.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$1,400.000
|
$1,500.000
|
$1,825.000
|
$2,500.000
|
$1,500.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
1.000
|
$25,000.000
|
$15,000.000
|
$35,250.000
|
$25,000.000
|
$27,500.000
|
$25,000.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
420.000
|
$2.000
|
$6.000
|
$7.500
|
$4.400
|
$3.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
1,680.000
|
$2.000
|
$5.000
|
$6.100
|
$4.400
|
$2.000
|
$1.000
|
|
|
JT / CRCK SEAL (HOT - POURED RUBBER)
|
LF
|
16.000
|
$89.000
|
$35.000
|
$91.500
|
$50.000
|
$75.000
|
$100.000
|
|
|
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
|
LF
|
69.000
|
$90.200
|
$300.000
|
$100.000
|
$600.000
|
$175.860
|
$250.000
|
|
|
CONCRETE RAIL REPLACEMENT (IN-KIND)
|
LF
|
3.000
|
$700.000
|
$1,200.000
|
$1,197.000
|
$1,000.000
|
$1,358.280
|
$1,000.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
32.000
|
$100.000
|
$125.000
|
$128.000
|
$86.000
|
$190.000
|
$1,000.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(SURF SEAL)
|
LF
|
42.000
|
$94.260
|
$105.000
|
$110.000
|
$76.000
|
$144.000
|
$1,000.000
|
|
|
REP STL BRIDGE MEMBER (BEARINGS)
|
EA
|
2.000
|
$4,000.000
|
$10,000.000
|
$4,500.000
|
$4,800.000
|
$2,153.190
|
$15,000.000
|
|
|
REP STL BRDG MEMB (ANCHOR BOLT NUT)
|
EA
|
1.000
|
$2,500.000
|
$2,500.000
|
$5,000.000
|
$1,000.000
|
$742.860
|
$6,500.000
|
|
|
REP STL BRIDGE MEMBER (WELD REPAIR)
|
LF
|
3.000
|
$500.000
|
$1,000.000
|
$5,000.000
|
$1,000.000
|
$1,705.200
|
$10,000.000
|
|
|
REPAIR STEEL (CORROSION MITIGATION)
|
EA
|
2.000
|
$4,500.000
|
$1,000.000
|
$5,000.000
|
$2,500.000
|
$250.000
|
$50,000.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
3.000
|
$24,000.000
|
$14,000.000
|
$14,000.000
|
$16,000.000
|
$9,874.090
|
$25,000.000
|
|
|
D-GR HMA TY-B PG64-22 (LEVEL-UP)
|
TON
|
10.000
|
$250.000
|
$350.000
|
$300.000
|
$1,045.000
|
$950.000
|
$500.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
154.000
|
$190.000
|
$350.000
|
$150.000
|
$290.400
|
$265.000
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
140.000
|
$67.000
|
$75.000
|
$60.000
|
$110.000
|
$59.530
|
$150.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
5.000
|
$13,000.000
|
$8,500.000
|
$2,000.000
|
$1,000.000
|
$10,825.000
|
$16,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
107.000
|
$250.000
|
$300.000
|
$250.000
|
$300.000
|
$205.680
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
1.000
|
$350.000
|
$300.000
|
$790.000
|
$750.000
|
$668.810
|
$850.000
|
|
Totals: |
$1,933,862.630
|
$2,414,176.000
|
$2,545,649.200
|
$2,654,030.740
|
$2,658,571.140
|
$3,625,230.000
|