PREPARING ROW
|
STA
|
2.000
|
$20,000.000
|
$50,000.000
|
$9,108.820
|
$20,000.000
|
$27,500.000
|
|
|
REMOVE CONC (WINGWALL)
|
CY
|
1.500
|
$2,000.000
|
$3,340.000
|
$2,919.920
|
$1,000.000
|
$2,750.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
103.000
|
$75.000
|
$125.000
|
$170.380
|
$100.000
|
$165.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
38.000
|
$10.000
|
$35.000
|
$42.000
|
$40.000
|
$72.370
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
38.000
|
$10.000
|
$8.300
|
$22.000
|
$20.000
|
$20.320
|
|
|
VEGETATIVE WATERING
|
MG
|
1.300
|
$250.000
|
$950.000
|
$1,859.280
|
$1,000.000
|
$3,850.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
13.000
|
$12.200
|
$30.000
|
$174.410
|
$40.000
|
$50.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
64.000
|
$96.000
|
$200.000
|
$591.450
|
$750.000
|
$330.000
|
|
|
STRUCT EXCAV (BRIDGE)
|
CY
|
206.000
|
$65.000
|
$60.000
|
$110.540
|
$75.000
|
$82.500
|
|
|
CEM STABIL BKFL
|
CY
|
206.000
|
$500.000
|
$190.000
|
$248.810
|
$400.000
|
$313.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
1.000
|
$1,000.000
|
$2,275.000
|
$5,292.380
|
$1,000.000
|
$1,500.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
375.000
|
$75.000
|
$150.000
|
$68.300
|
$100.000
|
$55.000
|
|
|
CL C CONC (ABUT)
|
CY
|
9.700
|
$2,000.000
|
$1,900.000
|
$7,315.630
|
$5,000.000
|
$8,800.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
9.700
|
$4,000.000
|
$6,500.000
|
$8,793.430
|
$5,000.000
|
$8,800.000
|
|
|
APPROACH SLAB
|
CY
|
54.000
|
$1,000.000
|
$815.000
|
$1,869.610
|
$1,500.000
|
$1,430.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
18.000
|
$500.000
|
$30.000
|
$88.350
|
$100.000
|
$100.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
35.000
|
$100.000
|
$32.000
|
$50.750
|
$40.000
|
$50.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
47.000
|
$250.000
|
$275.000
|
$207.220
|
$450.000
|
$675.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
5,551.000
|
$225.000
|
$120.000
|
$194.810
|
$325.000
|
$260.000
|
|
|
CONC STR REPAIR (STANDARD)
|
SF
|
14.000
|
$650.000
|
$225.000
|
$165.460
|
$1,000.000
|
$245.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
1,240.000
|
$250.000
|
$225.000
|
$229.520
|
$325.000
|
$158.400
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
6.600
|
$750.000
|
$1,150.000
|
$1,544.600
|
$1,000.000
|
$1,650.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
4,621.000
|
$55.000
|
$28.500
|
$42.840
|
$75.000
|
$55.000
|
|
|
RESIZING AND SEALING JOINTS
|
LF
|
650.000
|
$60.000
|
$85.000
|
$80.370
|
$85.000
|
$85.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
319.000
|
$30.000
|
$28.250
|
$95.990
|
$50.000
|
$68.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$2,386,000.000
|
$3,650,000.000
|
$3,122,873.760
|
$3,760,000.000
|
$3,735,840.000
|
|
|
CLEAN AND PAINT EXIST STR (REF NO. 5)
|
EA
|
1.000
|
$87,500.000
|
$92,500.000
|
$134,673.760
|
$150,000.000
|
$150,000.000
|
|
|
ANCHOR BOLTS
|
EA
|
8.000
|
$1,500.000
|
$1,450.000
|
$8,108.500
|
$750.000
|
$2,800.000
|
|
|
RETROFIT RAIL (TY 501)
|
LF
|
7.000
|
$900.000
|
$1,050.000
|
$1,220.600
|
$1,500.000
|
$1,650.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
25.600
|
$700.000
|
$514.000
|
$1,255.230
|
$650.000
|
$800.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$4,000.000
|
$4,830.000
|
$3,264.880
|
$3,000.000
|
$4,400.000
|
|
|
REMOV STR (BACKWALL)
|
EA
|
1.000
|
$6,000.000
|
$15,700.000
|
$11,124.750
|
$7,500.000
|
$8,250.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
1.000
|
$8,000.000
|
$11,400.000
|
$16,756.750
|
$7,500.000
|
$13,750.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$592,248.000
|
$820,000.000
|
$799,200.250
|
$775,000.000
|
$740,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$15,000.000
|
$40,000.000
|
$26,909.170
|
$2,000.000
|
$56,900.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
50.000
|
$45.000
|
$26.000
|
$26.000
|
$50.000
|
$72.600
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
120.000
|
$55.000
|
$66.000
|
$66.000
|
$75.000
|
$50.600
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
170.000
|
$24.000
|
$16.000
|
$16.000
|
$25.000
|
$28.530
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
930.000
|
$10.000
|
$3.550
|
$3.560
|
$5.000
|
$3.710
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
930.000
|
$4.000
|
$1.000
|
$1.000
|
$2.000
|
$1.100
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
180.000
|
$100.000
|
$90.000
|
$118.970
|
$110.000
|
$88.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$120.000
|
$90.000
|
$213.920
|
$110.000
|
$88.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
180.000
|
$20.000
|
$50.000
|
$23.270
|
$25.000
|
$66.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$30.000
|
$50.000
|
$25.800
|
$25.000
|
$66.000
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$750.000
|
$3,795.000
|
$4,762.380
|
$5,500.000
|
$5,280.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
2.000
|
$1,500.000
|
$1,869.000
|
$2,352.690
|
$5,500.000
|
$5,115.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
138.000
|
$50.000
|
$6.000
|
$13.010
|
$7.000
|
$33.000
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
0.100
|
$4,000.000
|
$5,000.000
|
$22,273.760
|
$5,000.000
|
$2,500.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
26.000
|
$250.000
|
$225.000
|
$195.500
|
$150.000
|
$150.000
|
|
|
REP STL BRIDGE MEMBER (WELD REPAIR)
|
LF
|
21.000
|
$2,000.000
|
$850.000
|
$315.110
|
$1,500.000
|
$700.000
|
|
|
REP STL BRDG MEMB (DRAIN HOLE RETROFIT)
|
EA
|
3.000
|
$3,300.000
|
$1,500.000
|
$527.900
|
$1,500.000
|
$1,300.000
|
|
|
BRIDGE JOINT REPAIR (SEJ)
|
LF
|
362.000
|
$750.000
|
$120.000
|
$212.110
|
$350.000
|
$150.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
47.000
|
$600.000
|
$460.000
|
$333.130
|
$400.000
|
$440.000
|
|
|
CONCRETE BEAM REPAIR (CFRP)
|
EA
|
2.000
|
$30,000.000
|
$10,400.000
|
$30,959.140
|
$30,000.000
|
$16,250.000
|
|
|
CONCRETE BEAM REP(STRAND SPLICE & CFRP)
|
EA
|
2.000
|
$50,000.000
|
$7,500.000
|
$37,056.640
|
$30,000.000
|
$27,000.000
|
|
|
SP MIXES SP-B SAC-B PG64-22
|
TON
|
15.000
|
$143.770
|
$300.000
|
$1,244.150
|
$350.000
|
$500.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
16.000
|
$12,000.000
|
$6,200.000
|
$12,477.900
|
$6,000.000
|
$8,000.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (2")
|
SY
|
153.000
|
$325.000
|
$650.000
|
$806.030
|
$1,000.000
|
$700.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #1
|
EA
|
6.000
|
$23,916.670
|
$58,500.000
|
$71,029.000
|
$80,000.000
|
$83,400.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
310.000
|
$150.000
|
$200.000
|
$112.390
|
$50.000
|
$105.000
|
|
|
TMA (STATIONARY)
|
DAY
|
394.000
|
$400.000
|
$750.000
|
$400.980
|
$250.000
|
$300.000
|
|
Totals: |
$6,739,727.170
|
$7,867,581.550
|
$7,992,057.530
|
$9,086,266.000
|
$9,199,225.620
|