PREPARING ROW
|
STA
|
1.000
|
$30,572.000
|
$4,833.300
|
$150,000.000
|
$10,000.000
|
$5,000.000
|
$150,000.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
227.600
|
$37.000
|
$58.500
|
$45.000
|
$137.500
|
$55.000
|
$100.000
|
|
|
EMBANK (FNL)(OC)(TY B)
|
CY
|
7.000
|
$123.000
|
$769.600
|
$700.000
|
$880.000
|
$75.000
|
$500.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
36.000
|
$5.000
|
$60.100
|
$60.000
|
$55.000
|
$75.000
|
$100.000
|
|
|
BROADCAST SEED (PERM_RURAL_CLAY)
|
SY
|
36.000
|
$4.000
|
$21.500
|
$10.000
|
$55.000
|
$75.000
|
$100.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
1.000
|
$1,250.000
|
$7,836.600
|
$10,000.000
|
$2,200.000
|
$5,000.000
|
$500.000
|
|
|
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
|
SY
|
18.000
|
$2.000
|
$37.700
|
$7.000
|
$55.000
|
$75.000
|
$150.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
8.000
|
$577.000
|
$3,074.000
|
$1,800.000
|
$500.000
|
$1,000.000
|
$500.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
664.000
|
$13.000
|
$22.100
|
$3.200
|
$5.000
|
$190.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,714.000
|
$61.000
|
$14.200
|
$38.500
|
$11.000
|
$225.000
|
$85.000
|
|
|
CL C CONC(PILE ENCASEMENT)
|
LF
|
42.000
|
$1,400.000
|
$874.000
|
$403.000
|
$660.000
|
$2,500.000
|
$6,500.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
22.400
|
$4,650.000
|
$2,237.700
|
$1,526.000
|
$4,400.000
|
$4,000.000
|
$5,500.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
180.000
|
$172.000
|
$125.700
|
$120.000
|
$148.500
|
$350.000
|
$1,000.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
46.000
|
$148.000
|
$223.300
|
$250.000
|
$150.000
|
$100.000
|
$1,000.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
4,219.000
|
$202.000
|
$147.100
|
$150.000
|
$187.000
|
$250.000
|
$250.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
5.800
|
$1,760.000
|
$1,339.300
|
$1,000.000
|
$3,300.000
|
$1,000.000
|
$650.000
|
|
|
RIPRAP (CONC)(CL A)
|
CY
|
1.000
|
$1,500.000
|
$2,788.000
|
$2,500.000
|
$3,300.000
|
$1,000.000
|
$850.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
132.000
|
$228.000
|
$220.000
|
$261.000
|
$209.000
|
$275.000
|
$165.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
1,353.000
|
$189.000
|
$206.200
|
$192.000
|
$209.000
|
$275.000
|
$250.000
|
|
|
RIPRAP (STONE PROTECTION)(30 IN)
|
CY
|
1,182.000
|
$150.000
|
$209.200
|
$204.000
|
$209.000
|
$275.000
|
$350.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL3)
|
LF
|
848.000
|
$44.000
|
$50.500
|
$15.000
|
$25.000
|
$80.000
|
$100.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
3,255.000
|
$56.000
|
$35.300
|
$28.100
|
$63.500
|
$80.000
|
$100.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
94.000
|
$25.000
|
$28.100
|
$75.000
|
$40.000
|
$80.000
|
$100.000
|
|
|
RESIZING AND SEALING JOINTS
|
LF
|
1,081.000
|
$82.000
|
$87.100
|
$65.000
|
$80.000
|
$100.000
|
$100.000
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
300.000
|
$81.000
|
$72.300
|
$100.000
|
$90.000
|
$100.000
|
$500.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
2,550.000
|
$90.000
|
$56.900
|
$41.000
|
$45.000
|
$55.000
|
$45.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (2")
|
SY
|
184.000
|
$390.000
|
$525.100
|
$300.000
|
$675.000
|
$750.000
|
$150.000
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
20.000
|
$28.000
|
$113.800
|
$57.000
|
$250.000
|
$100.000
|
$50.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM I)
|
LS
|
1.000
|
$340,500.000
|
$226,971.600
|
$550,000.000
|
$234,945.000
|
$325,000.000
|
$260,000.000
|
|
|
ANCHOR BOLTS
|
EA
|
10.000
|
$1,450.000
|
$1,992.400
|
$442.000
|
$2,800.000
|
$300.000
|
$1,650.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
226.000
|
$558.000
|
$317.400
|
$200.000
|
$730.000
|
$450.000
|
$850.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$6,440.000
|
$8,784.900
|
$10,000.000
|
$13,200.000
|
$5,000.000
|
$5,000.000
|
|
|
RAISING EXIST STRUCT
|
EA
|
2.000
|
$17,517.500
|
$87,108.200
|
$434,000.000
|
$65,000.000
|
$15,000.000
|
$50,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$2,590.000
|
$3,274.700
|
$1,800.000
|
$9,900.000
|
$3,000.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$499,247.170
|
$515,787.000
|
$575,000.000
|
$746,000.000
|
$350,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$16,750.000
|
$27,776.700
|
$25,000.000
|
$49,700.000
|
$2,500.000
|
$8,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
1,034.000
|
$111.000
|
$94.400
|
$55.000
|
$90.000
|
$10.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
531.000
|
$225.000
|
$346.200
|
$306.000
|
$320.000
|
$300.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
24.000
|
$392.000
|
$1,013.100
|
$763.000
|
$500.000
|
$300.000
|
$550.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
152.000
|
$85.000
|
$109.100
|
$100.000
|
$110.000
|
$130.000
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
152.000
|
$17.000
|
$26.300
|
$50.000
|
$55.000
|
$60.000
|
$15.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$30.000
|
$75.700
|
$50.000
|
$55.000
|
$60.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$12.000
|
$32.000
|
$20.000
|
$22.000
|
$30.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,386.000
|
$4.000
|
$4.400
|
$8.900
|
$5.500
|
$6.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,386.000
|
$1.000
|
$2.100
|
$3.010
|
$1.100
|
$3.000
|
$2.000
|
|
|
PCTB (FUR&INST)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
2,495.000
|
$85.000
|
$110.800
|
$34.000
|
$33.000
|
$120.000
|
$100.000
|
|
|
PCTB (MOVE)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
1,485.000
|
$25.000
|
$23.700
|
$9.000
|
$23.100
|
$20.000
|
$20.000
|
|
|
PCTB (REMOVE)(F-SHAPE OR SNGL SLP)TY1
|
LF
|
2,495.000
|
$24.000
|
$29.700
|
$9.000
|
$27.500
|
$25.000
|
$20.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
5.000
|
$2,108.000
|
$1,726.800
|
$755.000
|
$2,200.000
|
$3,750.000
|
$6,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,506.000
|
$1,083.400
|
$863.000
|
$1,650.000
|
$1,000.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,555.000
|
$10,417.000
|
$7,100.000
|
$11,000.000
|
$11,000.000
|
$21,000.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
1,086.000
|
$1.150
|
$1.800
|
$2.000
|
$1.380
|
$2.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
6,915.000
|
$1.150
|
$1.400
|
$1.400
|
$1.380
|
$2.000
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
5,133.000
|
$1.150
|
$1.400
|
$1.400
|
$1.380
|
$2.000
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
88.000
|
$12.000
|
$16.500
|
$20.000
|
$11.000
|
$12.000
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$196.000
|
$483.400
|
$225.000
|
$220.000
|
$225.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$221.000
|
$518.400
|
$320.000
|
$258.500
|
$250.000
|
$250.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
1,520.000
|
$3.000
|
$1.300
|
$3.000
|
$0.990
|
$1.500
|
$3.000
|
|
RE PM TY II (W) 6" (BRK)
|
LF
|
1,520.000
|
$1.600
|
$0.800
|
$1.000
|
$0.440
|
$0.750
|
$3.000
|
|
RE PM TY II (W) 6" (SLD)
|
LF
|
3,284.000
|
$1.600
|
$0.600
|
$1.000
|
$0.440
|
$0.750
|
$3.000
|
|
RE PM TY II (Y) 6" (SLD)
|
LF
|
3,222.000
|
$1.600
|
$0.600
|
$1.000
|
$0.440
|
$0.750
|
$3.000
|
|
RE PM TY II (BLK)(6")(SHADOW)
|
LF
|
1,520.000
|
$1.600
|
$0.800
|
$2.000
|
$0.440
|
$0.750
|
$3.000
|
|
TY I HIGH PERF PM (W)4"(BRK)(100MIL)
|
LF
|
430.000
|
$1.500
|
$2.100
|
$4.000
|
$0.830
|
$1.000
|
$10.000
|
|
TY I HIGH PERF PM (W)4"(SLD)(100MIL)
|
LF
|
300.000
|
$1.500
|
$2.700
|
$3.000
|
$0.830
|
$1.000
|
$10.000
|
|
TY I HIGH PERF PM (Y)4"(SLD)(100MIL)
|
LF
|
443.000
|
$1.500
|
$2.100
|
$3.000
|
$0.830
|
$1.000
|
$10.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
1,520.000
|
$1.200
|
$1.400
|
$2.000
|
$1.060
|
$1.000
|
$3.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
3,284.000
|
$1.200
|
$1.100
|
$1.400
|
$0.990
|
$1.000
|
$3.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
3,222.000
|
$1.200
|
$1.100
|
$1.400
|
$0.990
|
$1.000
|
$3.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
6,687.000
|
$1.100
|
$0.900
|
$1.000
|
$0.830
|
$1.000
|
$3.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
9,546.000
|
$0.400
|
$0.200
|
$0.300
|
$0.110
|
$0.250
|
$3.000
|
|
|
JT CLEANING AND SEALING(LNGT CNSTR JTS)
|
LF
|
34.000
|
$50.000
|
$37.300
|
$26.000
|
$50.000
|
$25.000
|
$100.000
|
|
|
DRIFTWOOD REMOVAL
|
CY
|
93.000
|
$480.000
|
$434.600
|
$260.000
|
$165.000
|
$75.000
|
$120.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
2.000
|
$75.000
|
$750.600
|
$1,057.000
|
$1,320.000
|
$1,000.000
|
$2,500.000
|
|
|
DRAIN INLET CLEANING
|
EA
|
1.000
|
$690.000
|
$2,142.100
|
$1,500.000
|
$2,750.000
|
$1,000.000
|
$1,500.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
10.000
|
$1,220.000
|
$925.300
|
$1,040.000
|
$1,400.000
|
$300.000
|
$1,000.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
114.000
|
$110.000
|
$126.800
|
$54.000
|
$82.500
|
$80.000
|
$100.000
|
|
|
REP STL BRIDGE MEMBER (BEARINGS)
|
EA
|
52.000
|
$7,500.000
|
$154.300
|
$684.000
|
$2,200.000
|
$4,000.000
|
$3,500.000
|
|
|
REP STL BRIDGE MBR (BRNG MASONRY PLATE)
|
EA
|
1.000
|
$3,500.000
|
$2,500.800
|
$2,100.000
|
$1,500.000
|
$4,000.000
|
$6,500.000
|
|
|
REP STL BRIDGE MBR (STRAIGHTEN MEMB)
|
EA
|
1.000
|
$20,000.000
|
$13,700.400
|
$7,625.000
|
$21,000.000
|
$25,000.000
|
$12,500.000
|
|
|
REP STL BRIDGE MBR (ANCHOR BOLT NUTS)
|
EA
|
19.000
|
$535.000
|
$369.400
|
$616.000
|
$250.000
|
$1,000.000
|
$2,500.000
|
|
|
REP STL BRIDGE MBR (WELD REPAIR)
|
EA
|
9.000
|
$960.000
|
$1,070.400
|
$1,024.000
|
$600.000
|
$1,500.000
|
$6,500.000
|
|
|
REP STL BRIDGE MBR (COTTER PIN OR BOLT)
|
EA
|
3.000
|
$500.000
|
$210.000
|
$991.000
|
$250.000
|
$1,000.000
|
$4,000.000
|
|
|
BRIDGE JOINT REPAIR (SEJ)
|
LF
|
178.000
|
$502.000
|
$68.000
|
$67.000
|
$165.000
|
$250.000
|
$2,500.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
308.000
|
$558.000
|
$298.300
|
$293.000
|
$820.000
|
$350.000
|
$1,000.000
|
|
|
REPLACING ELASTOMERIC BEARING PADS
|
EA
|
53.000
|
$9,325.000
|
$6,517.800
|
$3,600.000
|
$3,450.000
|
$4,500.000
|
$5,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #1
|
EA
|
1.000
|
$175,000.000
|
$220,202.200
|
$300,000.000
|
$241,500.000
|
$325,000.000
|
$260,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #2
|
EA
|
1.000
|
$4,500.000
|
$34,834.000
|
$40,000.000
|
$36,800.000
|
$60,000.000
|
$55,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #3
|
EA
|
1.000
|
$3,300.000
|
$34,834.000
|
$40,000.000
|
$36,800.000
|
$60,000.000
|
$55,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #4
|
EA
|
1.000
|
$1,250.000
|
$22,834.000
|
$30,000.000
|
$23,000.000
|
$40,000.000
|
$35,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #5
|
EA
|
1.000
|
$54,250.000
|
$71,901.500
|
$75,000.000
|
$74,865.000
|
$90,000.000
|
$100,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #6
|
EA
|
1.000
|
$100.000
|
$5,566.800
|
$10,000.000
|
$5,750.000
|
$20,000.000
|
$25,000.000
|
|
|
STEEL BRIDGE ZONE PAINTING REF STR #7
|
EA
|
1.000
|
$1,325.000
|
$54,667.900
|
$60,000.000
|
$56,350.000
|
$75,000.000
|
$65,000.000
|
|
Totals: |
$5,761,253.870
|
$5,157,489.520
|
$5,749,766.360
|
$5,952,823.060
|
$6,291,258.000
|