PREPARING ROW
|
STA
|
25.900
|
$3,700.000
|
$2,000.000
|
$8,536.000
|
$9,450.000
|
$12,000.000
|
$4,000.000
|
$7,869.570
|
$2,500.000
|
$3,250.000
|
$5,550.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
7,319.000
|
$9.000
|
$5.000
|
$6.000
|
$7.000
|
$10.000
|
$10.000
|
$6.000
|
$7.000
|
$10.500
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,611.000
|
$8.300
|
$8.000
|
$8.000
|
$30.000
|
$11.000
|
$15.000
|
$24.890
|
$10.000
|
$15.000
|
$15.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
6,098.000
|
$18.000
|
$11.000
|
$8.000
|
$15.500
|
$11.000
|
$15.000
|
$16.590
|
$15.000
|
$13.000
|
$27.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
10,000.000
|
$15.000
|
$12.000
|
$5.000
|
$11.000
|
$11.000
|
$20.000
|
$25.640
|
$60.000
|
$10.000
|
$12.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
14,722.000
|
$1.500
|
$2.250
|
$1.750
|
$0.750
|
$1.000
|
$1.000
|
$0.900
|
$1.000
|
$2.350
|
$2.870
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
8,307.000
|
$0.500
|
$0.200
|
$0.270
|
$0.180
|
$0.110
|
$0.500
|
$0.220
|
$0.180
|
$0.230
|
$0.210
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
8,307.000
|
$0.500
|
$0.200
|
$0.290
|
$0.180
|
$0.110
|
$0.500
|
$0.220
|
$0.180
|
$0.250
|
$0.210
|
|
|
VEGETATIVE WATERING
|
MG
|
510.000
|
$20.000
|
$25.000
|
$25.000
|
$10.000
|
$25.000
|
$1.000
|
$23.570
|
$10.000
|
$25.000
|
$38.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
1,892.000
|
$2.500
|
$2.000
|
$1.400
|
$1.850
|
$2.000
|
$2.000
|
$2.220
|
$2.000
|
$1.180
|
$2.230
|
|
|
FL BS (CMP IN PLC)(TY E GR 4)(FNAL POS)
|
CY
|
134.000
|
$70.000
|
$104.000
|
$58.000
|
$100.000
|
$80.000
|
$60.000
|
$90.480
|
$100.000
|
$50.000
|
$89.000
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
16.000
|
$200.000
|
$185.000
|
$160.000
|
$155.000
|
$150.000
|
$220.000
|
$258.000
|
$250.000
|
$388.000
|
$200.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
904.000
|
$6.500
|
$10.000
|
$8.000
|
$8.000
|
$1.000
|
$16.000
|
$14.700
|
$15.000
|
$21.500
|
$10.000
|
|
|
CEMENT
|
TON
|
114.000
|
$200.000
|
$200.000
|
$190.000
|
$190.000
|
$150.000
|
$250.000
|
$158.400
|
$210.000
|
$265.000
|
$245.500
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
7,948.000
|
$4.000
|
$4.400
|
$3.000
|
$4.000
|
$1.000
|
$16.000
|
$2.400
|
$3.000
|
$9.500
|
$2.960
|
|
|
CEMENT TREAT (NEW BASE)(36")
|
SY
|
143.000
|
$75.000
|
$40.000
|
$29.000
|
$35.000
|
$100.000
|
$20.000
|
$29.380
|
$15.000
|
$100.000
|
$53.250
|
|
|
PRIME COAT (EC-30)
|
GAL
|
867.000
|
$5.750
|
$9.500
|
$9.000
|
$7.400
|
$1.000
|
$8.000
|
$10.860
|
$10.000
|
$5.000
|
$4.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
867.000
|
$3.750
|
$9.800
|
$10.000
|
$12.500
|
$1.000
|
$12.000
|
$12.000
|
$10.000
|
$6.000
|
$6.750
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
3,979.000
|
$75.000
|
$75.000
|
$78.000
|
$79.500
|
$70.000
|
$90.000
|
$87.240
|
$75.000
|
$105.000
|
$77.000
|
|
|
D-GR HMA(SQ) TY-D PG64-28
|
TON
|
1,543.000
|
$85.000
|
$87.000
|
$90.000
|
$98.800
|
$80.000
|
$105.000
|
$101.160
|
$85.000
|
$110.000
|
$83.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,117.000
|
$20.000
|
$30.000
|
$32.000
|
$30.000
|
$35.000
|
$20.000
|
$26.920
|
$35.000
|
$24.380
|
$30.750
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
318.000
|
$160.000
|
$257.000
|
$250.000
|
$243.000
|
$530.000
|
$220.000
|
$261.860
|
$200.000
|
$250.000
|
$324.500
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
43.000
|
$830.000
|
$980.000
|
$850.000
|
$1,100.000
|
$900.000
|
$900.000
|
$970.830
|
$1,000.000
|
$2,000.000
|
$1,122.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
30.800
|
$1,200.000
|
$1,000.000
|
$1,050.000
|
$1,300.000
|
$1,000.000
|
$1,000.000
|
$1,143.940
|
$1,100.000
|
$2,100.000
|
$1,380.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
22.000
|
$800.000
|
$1,000.000
|
$900.000
|
$1,100.000
|
$900.000
|
$1,000.000
|
$1,118.220
|
$700.000
|
$1,500.000
|
$1,404.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
7,140.000
|
$18.000
|
$16.000
|
$17.000
|
$22.000
|
$20.000
|
$20.000
|
$22.480
|
$19.000
|
$29.250
|
$27.500
|
|
|
APPROACH SLAB (HPC)
|
CY
|
51.400
|
$450.000
|
$510.000
|
$425.000
|
$550.000
|
$400.000
|
$550.000
|
$636.940
|
$500.000
|
$715.000
|
$858.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
834.000
|
$130.000
|
$137.000
|
$175.000
|
$160.000
|
$150.000
|
$185.000
|
$157.580
|
$147.000
|
$200.000
|
$214.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
356.000
|
$90.000
|
$120.000
|
$100.000
|
$130.000
|
$135.000
|
$200.000
|
$113.620
|
$120.000
|
$156.000
|
$143.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
12.000
|
$425.000
|
$450.000
|
$450.000
|
$500.000
|
$735.000
|
$500.000
|
$746.020
|
$400.000
|
$550.000
|
$588.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
468.000
|
$115.000
|
$110.000
|
$90.000
|
$82.000
|
$111.000
|
$100.000
|
$118.800
|
$100.000
|
$170.000
|
$127.500
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
60.000
|
$90.000
|
$90.000
|
$60.000
|
$70.000
|
$55.000
|
$75.000
|
$92.810
|
$110.000
|
$200.000
|
$89.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
72.000
|
$100.000
|
$60.000
|
$64.000
|
$65.000
|
$50.000
|
$80.000
|
$53.860
|
$35.000
|
$70.000
|
$57.250
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
46.000
|
$170.000
|
$155.000
|
$100.000
|
$160.000
|
$155.000
|
$250.000
|
$120.000
|
$110.000
|
$210.000
|
$146.750
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
208.000
|
$70.000
|
$75.000
|
$70.000
|
$85.000
|
$75.000
|
$80.000
|
$67.200
|
$75.000
|
$90.000
|
$96.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
184.000
|
$230.000
|
$100.000
|
$85.000
|
$180.000
|
$85.000
|
$120.000
|
$85.200
|
$175.000
|
$90.000
|
$115.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$1,012.000
|
$1,265.000
|
$650.000
|
$1,250.000
|
$630.000
|
$800.000
|
$1,320.000
|
$700.000
|
$1,500.000
|
$1,535.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,200.000
|
$1,490.000
|
$750.000
|
$2,000.000
|
$840.000
|
$1,200.000
|
$1,440.000
|
$1,200.000
|
$1,500.000
|
$1,720.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$4,000.000
|
$5,010.000
|
$1,100.000
|
$7,000.000
|
$4,250.000
|
$5,000.000
|
$3,978.600
|
$4,500.000
|
$4,000.000
|
$6,371.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$80,000.000
|
$47,500.000
|
$116,210.000
|
$35,000.000
|
$50,000.000
|
$60,000.000
|
$55,382.400
|
$30,000.000
|
$50,000.000
|
$72,105.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
6.000
|
$300.000
|
$525.000
|
$500.000
|
$600.000
|
$525.000
|
$500.000
|
$1,000.010
|
$300.000
|
$1,500.000
|
$348.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$214,968.890
|
$235,000.000
|
$252,000.000
|
$270,000.000
|
$269,926.740
|
$255,000.000
|
$281,760.000
|
$250,000.000
|
$295,000.000
|
$305,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$8,000.000
|
$2,500.000
|
$3,200.000
|
$7,000.000
|
$10,000.000
|
$6,000.000
|
$4,326.760
|
$5,000.000
|
$1,500.000
|
$4,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,756.000
|
$2.600
|
$1.950
|
$1.950
|
$1.850
|
$2.000
|
$2.000
|
$2.220
|
$1.850
|
$1.780
|
$2.230
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,756.000
|
$1.000
|
$0.650
|
$0.450
|
$0.600
|
$0.750
|
$1.000
|
$0.720
|
$0.600
|
$0.370
|
$0.720
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
64.000
|
$5.000
|
$7.000
|
$7.000
|
$5.760
|
$18.000
|
$10.000
|
$6.920
|
$10.000
|
$6.140
|
$6.900
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
64.000
|
$1.000
|
$4.100
|
$0.450
|
$3.000
|
$2.000
|
$5.000
|
$3.600
|
$5.000
|
$0.370
|
$3.600
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
|
LF
|
1,160.000
|
$10.000
|
$11.000
|
$13.500
|
$8.000
|
$10.000
|
$20.000
|
$20.000
|
$25.000
|
$15.000
|
$20.500
|
|
|
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$11.000
|
$14.500
|
$10.000
|
$10.000
|
$20.000
|
$20.000
|
$40.000
|
$15.000
|
$27.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
2,260.000
|
$7.000
|
$5.000
|
$5.600
|
$6.000
|
$5.000
|
$20.000
|
$5.550
|
$25.000
|
$5.000
|
$8.250
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$15.000
|
$5.000
|
$10.500
|
$6.000
|
$5.000
|
$20.000
|
$5.550
|
$15.000
|
$5.000
|
$21.250
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
1,960.000
|
$6.500
|
$10.000
|
$7.500
|
$8.000
|
$10.000
|
$20.000
|
$20.000
|
$25.000
|
$8.000
|
$12.450
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
120.000
|
$7.500
|
$10.000
|
$8.750
|
$10.000
|
$10.000
|
$20.000
|
$34.830
|
$25.000
|
$8.000
|
$24.500
|
|
|
DRIVEWAYS (BASE)
|
SY
|
918.000
|
$25.000
|
$58.250
|
$12.000
|
$25.000
|
$15.000
|
$40.000
|
$43.820
|
$25.000
|
$18.000
|
$16.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$19.500
|
$19.250
|
$22.000
|
$20.000
|
$19.500
|
$22.000
|
$24.110
|
$25.000
|
$20.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
4.000
|
$2,500.000
|
$1,299.990
|
$1,200.000
|
$1,100.000
|
$1,319.540
|
$1,200.000
|
$1,071.600
|
$1,500.000
|
$1,100.000
|
$1,323.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
512.000
|
$5.000
|
$4.280
|
$2.750
|
$2.500
|
$4.260
|
$4.000
|
$3.640
|
$4.000
|
$2.500
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,354.000
|
$2,500.000
|
$2,300.000
|
$2,396.250
|
$2,400.000
|
$2,970.000
|
$2,500.000
|
$2,300.000
|
$2,766.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
5.000
|
$500.000
|
$390.000
|
$320.000
|
$350.000
|
$559.130
|
$500.000
|
$802.800
|
$350.000
|
$350.000
|
$421.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
7.000
|
$100.000
|
$250.000
|
$95.000
|
$65.000
|
$79.880
|
$200.000
|
$120.000
|
$100.000
|
$65.000
|
$78.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
8,840.000
|
$0.500
|
$1.050
|
$2.150
|
$1.000
|
$1.070
|
$1.200
|
$1.200
|
$1.000
|
$1.000
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
54.000
|
$8.000
|
$7.400
|
$15.000
|
$6.000
|
$6.390
|
$10.000
|
$7.200
|
$6.000
|
$6.000
|
$7.220
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,622.000
|
$0.500
|
$1.050
|
$2.200
|
$1.000
|
$1.070
|
$1.200
|
$1.200
|
$1.000
|
$1.000
|
$1.200
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
11.000
|
$20.000
|
$9.850
|
$60.000
|
$4.000
|
$4.260
|
$5.000
|
$4.800
|
$4.000
|
$4.000
|
$4.810
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,423.000
|
$1.000
|
$0.690
|
$1.100
|
$0.650
|
$0.690
|
$1.000
|
$0.780
|
$0.650
|
$0.650
|
$0.780
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,038.000
|
$1.000
|
$0.690
|
$1.100
|
$0.650
|
$0.690
|
$1.000
|
$0.780
|
$0.650
|
$0.650
|
$0.780
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
3,350.000
|
$0.450
|
$1.060
|
$1.350
|
$1.000
|
$1.070
|
$1.000
|
$1.200
|
$1.000
|
$1.000
|
$1.200
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
10,461.000
|
$0.260
|
$0.110
|
$0.500
|
$0.100
|
$0.110
|
$0.100
|
$0.120
|
$0.100
|
$0.100
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
11.000
|
$0.380
|
$5.680
|
$11.000
|
$2.000
|
$2.130
|
$2.000
|
$2.400
|
$2.000
|
$2.000
|
$2.410
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$54,000.000
|
$27,200.000
|
$19,000.000
|
$20,000.000
|
$14,197.820
|
$25,000.000
|
$1.200
|
$32,000.000
|
$16,500.000
|
$35,626.000
|
|
|
INTRLCK ART CONC BLKS W/CABLE (6" MIN)
|
SF
|
8,107.000
|
$10.000
|
$18.750
|
$16.500
|
$15.000
|
$15.000
|
$16.000
|
$19.040
|
$14.000
|
$24.000
|
$21.550
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$9,500.000
|
$6,000.000
|
$17,000.000
|
$3,000.000
|
$10,000.000
|
$16,000.000
|
$14,400.000
|
$10,000.000
|
$20,500.000
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$12,000.000
|
$15,000.000
|
$12,500.000
|
$2,500.000
|
$2,500.000
|
$30,000.000
|
$36,000.000
|
$25,000.000
|
$15,000.000
|
$42,000.000
|
|
Totals: |
$2,492,657.830
|
$2,379,000.000
|
$2,528,226.820
|
$2,757,961.010
|
$2,772,000.000
|
$2,954,841.500
|
$2,975,782.091
|
$3,010,907.470
|
$3,022,863.370
|
$3,059,636.920
|