REMOVING CONC (SIDEWALKS)
|
SY
|
33.000
|
$40.000
|
$18.080
|
$40.000
|
$50.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-12")
|
SY
|
500.000
|
$10.000
|
$25.540
|
$29.000
|
$25.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
137.000
|
$2.000
|
$12.870
|
$11.000
|
$13.000
|
|
|
BLOCK SODDING
|
SY
|
137.000
|
$10.000
|
$11.470
|
$13.400
|
$11.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
137.000
|
$2.000
|
$9.360
|
$3.750
|
$8.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
137.000
|
$2.000
|
$9.360
|
$3.750
|
$8.000
|
|
|
VEGETATIVE WATERING
|
MG
|
39.000
|
$40.000
|
$102.960
|
$10.000
|
$150.000
|
|
|
CEMENT
|
TON
|
3.000
|
$300.000
|
$639.990
|
$1,900.000
|
$750.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
264.000
|
$10.000
|
$188.880
|
$22.100
|
$90.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
47.000
|
$10.000
|
$40.950
|
$35.000
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
140.700
|
$250.000
|
$253.220
|
$120.000
|
$400.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
752.000
|
$240.000
|
$247.990
|
$166.000
|
$250.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
43.800
|
$1,400.000
|
$1,991.470
|
$1,200.000
|
$3,000.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
3,600.000
|
$30.000
|
$31.270
|
$28.000
|
$50.000
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
744.000
|
$15.000
|
$22.940
|
$16.000
|
$30.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
112.500
|
$750.000
|
$834.040
|
$656.000
|
$1,000.000
|
|
|
PRESTR CONC SLAB BEAM (4SB15)
|
LF
|
693.000
|
$270.000
|
$240.330
|
$299.500
|
$375.000
|
|
|
PRESTR CONC SLAB BEAM (5SB15)
|
LF
|
148.500
|
$270.000
|
$288.880
|
$299.500
|
$375.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
7.400
|
$800.000
|
$1,187.530
|
$881.000
|
$1,000.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
1,621.000
|
$20.000
|
$20.320
|
$10.000
|
$40.000
|
|
|
RAIL (TY C402)(HPC)
|
LF
|
124.000
|
$170.000
|
$325.760
|
$258.000
|
$350.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
136.000
|
$130.000
|
$122.690
|
$139.000
|
$150.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$45,000.000
|
$70,627.150
|
$260,000.000
|
$75,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$103,900.000
|
$283,684.060
|
$160,000.000
|
$173,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$10,000.000
|
$3,456.270
|
$20,000.000
|
$15,750.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
40.000
|
$50.000
|
$35.100
|
$46.000
|
$61.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$20.000
|
$17.550
|
$25.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$30.000
|
$33.350
|
$28.500
|
$12.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$15.000
|
$11.700
|
$10.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
366.000
|
$5.000
|
$4.040
|
$3.450
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
366.000
|
$1.000
|
$1.170
|
$1.000
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
48.000
|
$8.000
|
$5.790
|
$4.950
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
48.000
|
$2.000
|
$2.340
|
$2.000
|
$1.500
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
240.000
|
$95.000
|
$78.690
|
$200.000
|
$125.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
240.000
|
$25.000
|
$10.250
|
$5.000
|
$10.000
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
240.000
|
$20.000
|
$37.900
|
$19.000
|
$25.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
72.000
|
$50.000
|
$89.300
|
$48.000
|
$75.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
67.000
|
$85.000
|
$203.890
|
$122.000
|
$250.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
72.000
|
$200.000
|
$318.650
|
$82.000
|
$125.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 2(WC)GND
|
EA
|
4.000
|
$100.000
|
$263.250
|
$79.100
|
$275.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
4,510.000
|
$1.500
|
$1.050
|
$1.500
|
$1.650
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
108.000
|
$1.500
|
$1.050
|
$2.000
|
$2.200
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
7,617.000
|
$1.500
|
$1.050
|
$1.500
|
$1.650
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
716.000
|
$2.000
|
$1.400
|
$1.400
|
$1.540
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
88.000
|
$10.000
|
$11.700
|
$10.000
|
$11.000
|
|
REFL PAV MRK TY II (W) 6" (BRK)
|
LF
|
1,360.000
|
$1.000
|
$0.420
|
$0.500
|
$0.550
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
309.000
|
$1.000
|
$0.420
|
$0.500
|
$0.550
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
716.000
|
$1.000
|
$0.570
|
$0.700
|
$0.770
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
88.000
|
$5.000
|
$5.850
|
$2.000
|
$2.200
|
|
REFL PAV MRK TY II (Y) 6" (BRK)
|
LF
|
1,209.000
|
$1.250
|
$0.420
|
$0.500
|
$0.550
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
5,888.000
|
$1.250
|
$0.420
|
$1.000
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,360.000
|
$1.250
|
$1.030
|
$1.100
|
$1.210
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
309.000
|
$0.750
|
$1.030
|
$1.100
|
$1.210
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,209.000
|
$0.750
|
$1.030
|
$1.100
|
$1.210
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
5,888.000
|
$0.750
|
$1.030
|
$1.000
|
$1.100
|
|
REFL PAV MRKR TY I-C
|
EA
|
71.000
|
$6.000
|
$9.360
|
$4.000
|
$4.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
144.000
|
$6.000
|
$9.360
|
$4.000
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,333.000
|
$1.000
|
$5.850
|
$0.990
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
90.000
|
$1.000
|
$1.170
|
$0.750
|
$0.830
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
95.000
|
$150.000
|
$397.800
|
$340.000
|
$275.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22 (EXEMPT)
|
TON
|
28.000
|
$200.000
|
$421.200
|
$360.000
|
$753.000
|
|
|
TACK COAT
|
GAL
|
104.000
|
$10.000
|
$11.700
|
$10.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$11,700.000
|
$50,000.000
|
$12,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
210.000
|
$190.000
|
$52.650
|
$206.000
|
$155.000
|
|
Totals: |
$1,231,106.250
|
$1,513,118.102
|
$1,648,887.120
|
$1,808,198.690
|