PREPARING ROW
|
STA
|
5.200
|
$7,500.000
|
$31,309.420
|
$30,000.000
|
$12,600.000
|
$15,000.000
|
|
|
PREPARING ROW(TREE)(5" TO 12" DIA)
|
EA
|
5.000
|
$400.000
|
$750.000
|
$1,000.000
|
$1,260.000
|
$1,100.000
|
|
|
EXCAVATION (ROADWAY AND CHANNEL)
|
CY
|
578.000
|
$50.000
|
$10.000
|
$60.000
|
$50.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
1,131.000
|
$35.000
|
$22.000
|
$48.000
|
$40.000
|
$45.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
1,027.000
|
$10.000
|
$9.500
|
$4.700
|
$10.100
|
$9.250
|
|
|
BROADCAST SEED (PERM) (URBAN) (CLAY)
|
SY
|
1,027.000
|
$2.000
|
$1.800
|
$2.250
|
$6.710
|
$1.750
|
|
|
VEGETATIVE WATERING
|
MG
|
36.000
|
$50.000
|
$15.000
|
$150.000
|
$90.000
|
$70.500
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
1,918.000
|
$22.000
|
$12.000
|
$16.000
|
$35.000
|
$25.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
575.000
|
$10.000
|
$8.000
|
$8.000
|
$9.000
|
$5.750
|
|
|
PLANE ASPH CONC PAV(0" TO 8")
|
SY
|
1,290.000
|
$10.000
|
$7.500
|
$11.500
|
$10.000
|
$14.000
|
|
|
CEM STABIL BKFL
|
CY
|
188.000
|
$250.000
|
$165.000
|
$135.000
|
$300.000
|
$335.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
261.000
|
$48.000
|
$100.000
|
$28.000
|
$210.000
|
$15.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
210.000
|
$250.000
|
$380.000
|
$351.000
|
$350.000
|
$540.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
53.200
|
$1,500.000
|
$1,500.000
|
$952.000
|
$4,000.000
|
$1,850.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
2,990.000
|
$25.000
|
$28.000
|
$39.000
|
$55.000
|
$95.000
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$750.000
|
$700.000
|
$677.000
|
$1,000.000
|
$1,000.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
387.060
|
$250.000
|
$240.000
|
$257.000
|
$450.000
|
$450.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
265.000
|
$150.000
|
$136.000
|
$174.000
|
$196.150
|
$490.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
11.000
|
$550.000
|
$750.000
|
$681.000
|
$945.000
|
$1,903.000
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
178.000
|
$185.000
|
$175.000
|
$129.000
|
$178.000
|
$292.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
84.000
|
$160.000
|
$165.000
|
$135.000
|
$150.000
|
$290.250
|
|
|
GABIONS (GALV)
|
CY
|
52.000
|
$450.000
|
$260.000
|
$413.000
|
$427.350
|
$1,189.250
|
|
|
GABION MATTRESSES (GALV)(6 IN)
|
SY
|
60.000
|
$225.000
|
$140.000
|
$133.000
|
$126.540
|
$323.000
|
|
|
GABION MATTRESSES (GALV)(12 IN)
|
SY
|
146.000
|
$250.000
|
$160.000
|
$156.000
|
$161.070
|
$364.750
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$40,000.000
|
$140,000.000
|
$150,000.000
|
$50,000.000
|
$60,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
120.000
|
$15.000
|
$5.000
|
$10.000
|
$29.080
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$122,236.370
|
$164,491.510
|
$165,000.000
|
$197,500.000
|
$75,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$9,000.000
|
$12,500.000
|
$16,500.000
|
$21,500.000
|
$1,650.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$21.000
|
$50.000
|
$42.300
|
$10.000
|
$17.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$7.250
|
$18.000
|
$30.000
|
$5.000
|
$17.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,043.000
|
$5.000
|
$6.000
|
$4.750
|
$5.250
|
$3.750
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,043.000
|
$1.250
|
$1.900
|
$1.350
|
$2.650
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
622.000
|
$80.000
|
$160.000
|
$74.000
|
$90.000
|
$110.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
48.000
|
$135.000
|
$250.000
|
$95.000
|
$55.780
|
$147.500
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
6.000
|
$4,550.000
|
$5,600.000
|
$5,000.000
|
$6,000.000
|
$5,650.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
90.000
|
$100.000
|
$48.000
|
$50.000
|
$25.000
|
$176.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
480.000
|
$60.000
|
$51.000
|
$50.000
|
$25.000
|
$173.500
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$60.000
|
$62.000
|
$50.000
|
$50.000
|
$226.750
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
590.000
|
$10.000
|
$5.000
|
$2.000
|
$12.500
|
$19.750
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$15.000
|
$6.500
|
$2.000
|
$25.000
|
$36.500
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
90.000
|
$10.000
|
$17.000
|
$10.000
|
$25.000
|
$50.750
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
480.000
|
$10.000
|
$16.500
|
$10.000
|
$25.000
|
$30.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$10.000
|
$19.000
|
$22.000
|
$50.000
|
$32.000
|
|
|
PCTB(FUR & INST)(F-SHP TO LOW PROF)TY T
|
LF
|
20.000
|
$250.000
|
$175.000
|
$160.000
|
$525.000
|
$650.000
|
|
|
PORT CTB(REMOVE)(F-SHAPE)(TY T)
|
LF
|
20.000
|
$75.000
|
$22.000
|
$37.000
|
$50.000
|
$45.250
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
112.500
|
$25.000
|
$24.000
|
$20.500
|
$22.040
|
$34.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,100.000
|
$2,000.000
|
$3,700.620
|
$3,236.640
|
$2,471.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,250.000
|
$1,100.000
|
$1,000.000
|
$1,075.000
|
$2,014.000
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
3.000
|
$1,000.000
|
$700.000
|
$650.000
|
$698.750
|
$1,503.750
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,200.000
|
$3,000.000
|
$2,775.000
|
$2,983.130
|
$3,839.750
|
|
|
WIRE FENCE (TY C)
|
LF
|
120.000
|
$30.000
|
$10.000
|
$20.000
|
$53.490
|
$25.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$660.000
|
$720.000
|
$612.000
|
$657.900
|
$1,437.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$990.000
|
$950.000
|
$884.000
|
$950.300
|
$1,777.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$26.000
|
$23.000
|
$20.500
|
$22.040
|
$58.250
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
12.000
|
$32.000
|
$23.000
|
$20.000
|
$21.500
|
$56.750
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
2.000
|
$342.000
|
$300.000
|
$265.000
|
$284.880
|
$755.500
|
|
|
INSTL OM ASSM (OM-3R)(TWT)GND
|
EA
|
2.000
|
$342.000
|
$300.000
|
$265.000
|
$284.880
|
$755.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
4,336.000
|
$1.000
|
$1.600
|
$0.970
|
$1.040
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$7.000
|
$15.000
|
$15.000
|
$16.130
|
$24.500
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,112.000
|
$1.150
|
$1.600
|
$0.970
|
$1.040
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
60.000
|
$1.500
|
$9.500
|
$5.000
|
$5.910
|
$1.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
420.000
|
$0.500
|
$0.400
|
$0.450
|
$0.480
|
$0.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,628.000
|
$1.000
|
$1.500
|
$1.090
|
$1.170
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,628.000
|
$1.000
|
$1.500
|
$1.090
|
$1.170
|
$1.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
32.000
|
$6.000
|
$9.500
|
$5.000
|
$5.380
|
$18.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,816.000
|
$0.850
|
$0.850
|
$0.950
|
$1.020
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
5,321.000
|
$0.670
|
$0.050
|
$0.150
|
$0.160
|
$0.750
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
573.000
|
$125.000
|
$136.000
|
$124.800
|
$138.000
|
$230.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
208.000
|
$200.000
|
$182.000
|
$173.500
|
$191.000
|
$325.000
|
|
|
TACK COAT
|
GAL
|
363.000
|
$5.000
|
$8.000
|
$8.000
|
$8.000
|
$5.750
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$14,000.000
|
$35,000.000
|
$10,000.000
|
$1,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
2.000
|
$165.000
|
$330.000
|
$400.000
|
$210.000
|
$395.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
16.000
|
$75.000
|
$100.000
|
$80.000
|
$126.000
|
$85.000
|
|
Totals: |
$1,344,600.090
|
$1,644,915.144
|
$1,698,572.990
|
$2,008,519.260
|
$2,089,136.500
|