PREPARING ROW
|
STA
|
6.000
|
$3,500.000
|
$5,000.000
|
$16,700.000
|
$1,600.000
|
$15,600.000
|
$13,650.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
724.000
|
$15.000
|
$24.000
|
$8.000
|
$15.000
|
$30.000
|
$17.850
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
141.000
|
$20.000
|
$24.000
|
$8.000
|
$22.870
|
$50.000
|
$31.500
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
92.000
|
$15.000
|
$75.000
|
$8.000
|
$27.680
|
$18.000
|
$21.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
169.000
|
$25.000
|
$20.000
|
$60.000
|
$18.550
|
$20.000
|
$42.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
169.000
|
$25.000
|
$35.000
|
$60.000
|
$26.190
|
$30.000
|
$42.000
|
|
|
BLOCK SODDING
|
SY
|
780.000
|
$10.000
|
$4.120
|
$8.000
|
$5.000
|
$4.750
|
$4.400
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
390.000
|
$2.000
|
$1.550
|
$1.500
|
$1.650
|
$1.750
|
$1.650
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
390.000
|
$2.000
|
$1.550
|
$1.500
|
$1.650
|
$1.750
|
$1.650
|
|
|
VEGETATIVE WATERING
|
MG
|
27.000
|
$25.000
|
$77.250
|
$18.000
|
$175.000
|
$40.000
|
$26.400
|
|
|
LIME (HYD, COM, OR QK(SLURRY))
|
TON
|
15.000
|
$200.000
|
$216.300
|
$155.000
|
$162.800
|
$170.000
|
$168.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
898.000
|
$6.000
|
$8.760
|
$4.750
|
$9.500
|
$12.000
|
$7.350
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
180.000
|
$12.000
|
$9.270
|
$9.000
|
$10.000
|
$10.000
|
$15.790
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
200.000
|
$80.000
|
$131.840
|
$90.500
|
$180.200
|
$135.000
|
$105.600
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
364.000
|
$5.000
|
$15.970
|
$15.000
|
$10.430
|
$19.000
|
$24.200
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
727.000
|
$75.000
|
$112.270
|
$90.000
|
$110.000
|
$110.000
|
$84.000
|
|
|
CURB (TYPE II)
|
LF
|
469.000
|
$20.000
|
$5.150
|
$10.000
|
$10.000
|
$3.000
|
$5.250
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
131.000
|
$10.000
|
$9.270
|
$1.000
|
$5.500
|
$12.000
|
$10.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
410.000
|
$15.000
|
$1.000
|
$35.000
|
$25.000
|
$100.000
|
$44.000
|
|
|
CL C CONC (VEH DEFL WALL)(HPC)
|
CY
|
66.000
|
$1,200.000
|
$1,000.000
|
$480.000
|
$800.000
|
$405.000
|
$735.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
3,796.000
|
$25.000
|
$22.000
|
$35.000
|
$25.000
|
$40.000
|
$42.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
73.000
|
$500.000
|
$450.000
|
$450.000
|
$700.000
|
$475.000
|
$525.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
152.000
|
$25.000
|
$25.000
|
$5.000
|
$22.000
|
$22.000
|
$22.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
14.000
|
$450.000
|
$500.000
|
$580.000
|
$550.000
|
$700.000
|
$630.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
50.000
|
$550.000
|
$400.000
|
$460.000
|
$600.000
|
$520.000
|
$630.000
|
|
|
STR STEEL (SHEAR CONNECTOR)
|
LB
|
1,614.000
|
$10.000
|
$11.280
|
$6.000
|
$20.000
|
$7.000
|
$6.300
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$80,000.000
|
$203,500.000
|
$50,000.000
|
$210,000.000
|
$220,000.000
|
$177,500.000
|
|
|
RAIL (TY T401)(HPC)
|
LF
|
346.000
|
$180.000
|
$125.000
|
$130.000
|
$137.000
|
$135.000
|
$157.500
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
84.000
|
$100.000
|
$90.000
|
$85.000
|
$110.000
|
$90.000
|
$46.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
120.000
|
$75.000
|
$74.160
|
$65.000
|
$143.000
|
$130.000
|
$94.500
|
|
|
INLET (COMPL)(PCO)(4FT)(NONE)
|
EA
|
1.000
|
$5,500.000
|
$3,554.000
|
$3,700.000
|
$4,840.000
|
$7,000.000
|
$6,300.000
|
|
|
INLET (COMPL)(PCU)(4FT)(LEFT)
|
EA
|
1.000
|
$6,000.000
|
$4,378.000
|
$3,600.000
|
$4,950.000
|
$7,500.000
|
$6,300.000
|
|
|
INLET (COMPL)(PSL)(RH)(4FTX4FT)
|
EA
|
1.000
|
$4,200.000
|
$3,863.000
|
$3,600.000
|
$5,500.000
|
$6,000.000
|
$6,300.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$1,030.000
|
$600.000
|
$1,100.000
|
$2,000.000
|
$630.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$2,000.000
|
$1,545.000
|
$600.000
|
$1,100.000
|
$2,500.000
|
$945.000
|
|
|
REMOV STR (PIPE)
|
LF
|
16.000
|
$50.000
|
$25.750
|
$16.000
|
$44.000
|
$200.000
|
$21.000
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
1.000
|
$25,000.000
|
$25,000.000
|
$111,000.000
|
$80,000.000
|
$80,000.000
|
$31,500.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$7,500.000
|
$8,000.000
|
$1,000.000
|
$5,000.000
|
$4,000.000
|
$4,200.000
|
|
|
ADJUST STL SHOES
|
EA
|
8.000
|
$2,000.000
|
$1,000.000
|
$1,500.000
|
$3,200.000
|
$6,500.000
|
$1,575.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$84,761.000
|
$99,000.000
|
$100,000.000
|
$73,500.000
|
$135,000.000
|
$193,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$5,000.000
|
$5,000.000
|
$15,000.000
|
$21,000.000
|
$14,800.000
|
$31,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
725.000
|
$5.000
|
$1.800
|
$1.750
|
$1.930
|
$2.250
|
$1.930
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
725.000
|
$2.000
|
$0.520
|
$0.500
|
$0.550
|
$0.600
|
$0.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
45.000
|
$10.000
|
$6.440
|
$6.250
|
$6.880
|
$7.500
|
$6.880
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
45.000
|
$2.000
|
$15.450
|
$15.000
|
$16.500
|
$1.750
|
$16.500
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
510.000
|
$15.000
|
$25.000
|
$13.390
|
$22.240
|
$15.000
|
$21.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
150.000
|
$7.500
|
$10.000
|
$9.850
|
$18.920
|
$17.000
|
$10.500
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
510.000
|
$11.000
|
$12.000
|
$13.190
|
$19.940
|
$9.000
|
$21.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
475.000
|
$30.000
|
$20.100
|
$19.500
|
$21.450
|
$21.000
|
$21.450
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,000.000
|
$1,495.000
|
$1,450.000
|
$1,595.000
|
$1,900.000
|
$2,006.890
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,800.000
|
$953.000
|
$925.000
|
$1,017.500
|
$940.000
|
$1,017.500
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
1.000
|
$1,500.000
|
$515.000
|
$500.000
|
$550.000
|
$470.000
|
$550.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
700.000
|
$5.000
|
$4.120
|
$4.000
|
$4.400
|
$7.000
|
$4.400
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$350.000
|
$155.000
|
$150.000
|
$165.000
|
$260.000
|
$165.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,000.000
|
$2,215.000
|
$2,150.000
|
$2,365.000
|
$2,300.000
|
$2,365.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$500.000
|
$309.000
|
$300.000
|
$330.000
|
$260.000
|
$330.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$3,000.000
|
$618.000
|
$1,475.000
|
$1,622.500
|
$2,200.000
|
$1,013.640
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,800.000
|
$824.000
|
$775.000
|
$852.500
|
$1,600.000
|
$1,013.650
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$12,500.000
|
$1,133.000
|
$8,087.500
|
$8,896.250
|
$10,000.000
|
$9,450.000
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$500.000
|
$773.000
|
$400.000
|
$500.000
|
$600.000
|
$275.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$1,000.000
|
$773.000
|
$800.000
|
$550.000
|
$600.000
|
$790.760
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$500.000
|
$515.000
|
$300.000
|
$300.000
|
$400.000
|
$104.380
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
|
EA
|
4.000
|
$45.000
|
$34.000
|
$33.000
|
$36.300
|
$29.000
|
$36.300
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2(BR)
|
EA
|
3.000
|
$40.000
|
$34.000
|
$33.000
|
$36.300
|
$29.000
|
$36.300
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
|
EA
|
2.000
|
$40.000
|
$21.650
|
$21.000
|
$23.100
|
$29.000
|
$23.100
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BR)
|
EA
|
2.000
|
$40.000
|
$21.650
|
$21.000
|
$23.100
|
$29.000
|
$23.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
825.000
|
$3.000
|
$2.600
|
$0.650
|
$2.970
|
$3.150
|
$2.970
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
923.000
|
$3.000
|
$2.600
|
$0.800
|
$2.970
|
$3.150
|
$2.970
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
318.000
|
$10.000
|
$3.350
|
$6.500
|
$4.510
|
$4.850
|
$4.510
|
|
|
PAVEMENT SEALER 4"
|
LF
|
925.000
|
$0.500
|
$1.030
|
$0.450
|
$0.550
|
$0.600
|
$0.550
|
|
|
PAVEMENT SEALER 12"
|
LF
|
210.000
|
$1.500
|
$1.550
|
$1.500
|
$1.100
|
$1.200
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
783.000
|
$2.000
|
$2.600
|
$0.400
|
$1.380
|
$1.350
|
$1.380
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
962.000
|
$2.000
|
$2.600
|
$0.750
|
$1.380
|
$1.350
|
$1.380
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
16.000
|
$10.000
|
$6.200
|
$6.000
|
$11.000
|
$11.750
|
$11.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
893.000
|
$1.500
|
$1.050
|
$0.600
|
$1.870
|
$1.950
|
$1.870
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
925.000
|
$0.200
|
$0.550
|
$0.250
|
$1.100
|
$1.200
|
$1.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
210.000
|
$1.000
|
$1.050
|
$1.500
|
$2.200
|
$2.300
|
$2.200
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
16.000
|
$10.000
|
$1.050
|
$1.000
|
$1.710
|
$1.800
|
$1.710
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
16.000
|
$100.000
|
$41.200
|
$150.000
|
$150.000
|
$68.000
|
$220.820
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$7,985.000
|
$6,000.000
|
$14,000.000
|
$2,500.000
|
$9,450.000
|
|
|
CURB INLET SEDIMENT PROTECTION
|
LF
|
100.000
|
$15.000
|
$7.750
|
$7.500
|
$10.000
|
$24.000
|
$15.000
|
|
Totals: |
$932,365.000
|
$997,337.740
|
$1,029,208.450
|
$1,235,043.320
|
$1,362,260.900
|
$1,385,693.140
|