|
|
PREPARING ROW
|
STA
|
179.000
|
$500.000
|
$1,190.190
|
$150.000
|
$1,000.000
|
$160.000
|
$300.000
|
$1,676.000
|
$500.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
43.000
|
$54.000
|
$38.330
|
$65.000
|
$100.000
|
$63.000
|
$60.000
|
$100.000
|
$85.330
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
30.000
|
$25.000
|
$274.730
|
$105.000
|
$200.000
|
$20.000
|
$100.000
|
$50.000
|
$85.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
387.000
|
$40.000
|
$87.060
|
$95.000
|
$100.000
|
$73.000
|
$80.000
|
$50.000
|
$142.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
179.000
|
$240.000
|
$94.660
|
$275.000
|
$25.000
|
$190.000
|
$265.000
|
$450.000
|
$338.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
1,344.000
|
$2.000
|
$2.500
|
$2.600
|
$0.200
|
$10.000
|
$2.500
|
$2.000
|
$0.310
|
|
|
VEGETATIVE WATERING
|
MG
|
48.000
|
$85.000
|
$162.000
|
$85.000
|
$50.000
|
$150.000
|
$165.000
|
$50.000
|
$64.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (0 TO 2")
|
SY
|
66,953.000
|
$2.500
|
$1.700
|
$3.100
|
$0.500
|
$2.700
|
$4.000
|
$4.000
|
$3.200
|
|
|
FLEX PAVE STRUCTURE REPAIR (8"-10")
|
SY
|
3,348.000
|
$50.000
|
$88.070
|
$85.500
|
$100.000
|
$75.000
|
$89.000
|
$90.000
|
$119.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
278.000
|
$605.000
|
$582.010
|
$825.000
|
$550.000
|
$1,000.000
|
$850.000
|
$550.000
|
$1,136.000
|
|
|
RAIL (TY T631)
|
LF
|
402.000
|
$115.000
|
$100.880
|
$92.500
|
$110.000
|
$140.000
|
$85.000
|
$125.000
|
$163.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$254,594.400
|
$260,500.000
|
$260,000.000
|
$200,000.000
|
$300,000.000
|
$295,000.000
|
$300,000.000
|
$390,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$12,000.000
|
$20,310.000
|
$12,500.000
|
$35,000.000
|
$30,000.000
|
$21,000.000
|
$8,500.000
|
$34,269.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 3)
|
SY
|
233.000
|
$45.000
|
$75.700
|
$76.000
|
$1.000
|
$20.000
|
$75.700
|
$30.000
|
$57.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
233.000
|
$12.000
|
$45.000
|
$45.000
|
$0.100
|
$5.000
|
$45.000
|
$15.000
|
$26.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,000.000
|
$5.000
|
$2.970
|
$3.100
|
$1.000
|
$3.600
|
$2.970
|
$4.000
|
$2.700
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,000.000
|
$2.000
|
$1.350
|
$1.400
|
$0.100
|
$1.600
|
$1.350
|
$2.000
|
$1.400
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
100.000
|
$7.500
|
$13.250
|
$14.000
|
$5.000
|
$16.000
|
$13.250
|
$18.000
|
$5.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$3.500
|
$4.750
|
$5.000
|
$1.000
|
$5.700
|
$4.750
|
$9.000
|
$2.100
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
3,166.000
|
$28.000
|
$18.820
|
$22.000
|
$25.000
|
$30.250
|
$20.500
|
$26.000
|
$29.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$3,000.000
|
$3,122.850
|
$1,950.000
|
$1,800.000
|
$3,200.000
|
$1,775.000
|
$2,250.000
|
$2,940.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
8.000
|
$1,525.000
|
$989.000
|
$1,075.000
|
$1,200.000
|
$1,500.000
|
$987.500
|
$1,500.000
|
$1,400.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
4.000
|
$880.000
|
$657.000
|
$885.000
|
$850.000
|
$1,000.000
|
$825.000
|
$1,250.000
|
$1,175.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
3,522.000
|
$5.500
|
$3.000
|
$3.250
|
$2.750
|
$3.300
|
$3.000
|
$3.000
|
$4.250
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$330.000
|
$250.000
|
$136.000
|
$150.000
|
$180.000
|
$125.000
|
$500.000
|
$178.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
32.000
|
$3,250.000
|
$2,452.000
|
$2,985.000
|
$2,500.000
|
$3,400.000
|
$2,775.000
|
$3,250.000
|
$3,945.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
32.000
|
$400.000
|
$150.000
|
$275.000
|
$250.000
|
$300.000
|
$250.000
|
$500.000
|
$355.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
44.000
|
$800.000
|
$669.000
|
$805.000
|
$600.000
|
$680.000
|
$788.000
|
$1,000.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$925.000
|
$727.000
|
$850.000
|
$685.000
|
$830.000
|
$845.000
|
$1,000.000
|
$970.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,125.000
|
$761.000
|
$880.000
|
$995.000
|
$1,200.000
|
$1,195.000
|
$1,000.000
|
$1,400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$1,225.000
|
$873.000
|
$1,020.000
|
$1,195.000
|
$1,400.000
|
$1,398.000
|
$1,000.000
|
$1,700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
8.000
|
$1,275.000
|
$878.000
|
$1,025.000
|
$1,150.000
|
$1,400.000
|
$1,415.000
|
$1,000.000
|
$1,635.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
2.000
|
$350.000
|
$800.000
|
$945.000
|
$850.000
|
$1,000.000
|
$185.000
|
$850.000
|
$1,200.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
50.000
|
$150.000
|
$100.000
|
$115.000
|
$100.000
|
$120.000
|
$158.000
|
$50.000
|
$140.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
75.000
|
$25.000
|
$7.000
|
$21.500
|
$15.000
|
$33.750
|
$20.000
|
$100.000
|
$39.000
|
|
|
INSTL OM ASSM (OM-3L)(TWT)GND
|
EA
|
16.000
|
$350.000
|
$350.000
|
$410.000
|
$450.000
|
$540.000
|
$525.000
|
$100.000
|
$500.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
4.000
|
$33.000
|
$50.000
|
$56.000
|
$50.000
|
$60.000
|
$50.000
|
$50.000
|
$42.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
|
LF
|
56.000
|
$0.650
|
$2.000
|
$2.000
|
$2.000
|
$0.600
|
$0.500
|
$3.000
|
$2.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(DOT)
|
LF
|
113.000
|
$0.650
|
$2.000
|
$2.000
|
$2.000
|
$2.400
|
$2.000
|
$3.000
|
$2.800
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
35,650.000
|
$0.500
|
$0.330
|
$0.350
|
$0.330
|
$0.450
|
$0.380
|
$0.500
|
$0.450
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,136.000
|
$0.700
|
$0.590
|
$0.600
|
$0.600
|
$0.800
|
$0.660
|
$0.750
|
$0.830
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
243.000
|
$7.000
|
$4.000
|
$4.000
|
$4.000
|
$4.400
|
$3.650
|
$5.000
|
$5.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
15.000
|
$85.000
|
$60.000
|
$60.000
|
$60.000
|
$100.000
|
$85.000
|
$150.000
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
6.000
|
$75.000
|
$60.000
|
$60.000
|
$60.000
|
$140.000
|
$115.000
|
$150.000
|
$85.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
1,750.000
|
$0.450
|
$0.300
|
$0.300
|
$0.300
|
$0.600
|
$0.500
|
$0.500
|
$0.400
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
27,801.000
|
$0.400
|
$0.330
|
$0.350
|
$0.330
|
$0.450
|
$0.380
|
$0.500
|
$0.450
|
|
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
|
LF
|
113.000
|
$2.000
|
$2.000
|
$2.100
|
$2.000
|
$3.600
|
$3.000
|
$2.000
|
$2.800
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,136.000
|
$1.500
|
$1.000
|
$1.050
|
$1.000
|
$1.200
|
$0.970
|
$3.000
|
$1.400
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
243.000
|
$10.000
|
$7.000
|
$7.500
|
$7.000
|
$7.700
|
$6.330
|
$8.000
|
$9.850
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,000.000
|
$1.500
|
$0.210
|
$0.220
|
$0.200
|
$0.300
|
$0.230
|
$0.350
|
$0.300
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
15.000
|
$55.000
|
$19.000
|
$20.100
|
$19.000
|
$42.250
|
$35.000
|
$50.000
|
$27.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
6.000
|
$62.000
|
$19.000
|
$20.100
|
$19.000
|
$67.000
|
$55.000
|
$50.000
|
$27.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
56.000
|
$0.850
|
$2.000
|
$2.100
|
$2.000
|
$1.200
|
$1.000
|
$3.000
|
$2.800
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
1,750.000
|
$0.800
|
$0.700
|
$0.750
|
$0.700
|
$1.200
|
$1.000
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
27,801.000
|
$0.800
|
$0.650
|
$0.700
|
$0.650
|
$0.950
|
$0.770
|
$1.000
|
$0.900
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
35,650.000
|
$1.250
|
$0.710
|
$0.750
|
$0.700
|
$1.200
|
$0.970
|
$1.000
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
15.000
|
$250.000
|
$202.000
|
$220.000
|
$202.000
|
$280.000
|
$230.000
|
$300.000
|
$285.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$300.000
|
$290.000
|
$310.000
|
$290.000
|
$350.000
|
$290.000
|
$300.000
|
$400.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
57.000
|
$6.250
|
$3.550
|
$4.000
|
$3.550
|
$6.100
|
$5.000
|
$6.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
442.000
|
$7.000
|
$3.550
|
$4.000
|
$3.550
|
$5.700
|
$4.750
|
$6.000
|
$5.000
|
|
|
SP MIXES SP-C SAC-A PG70-28
|
TON
|
7,698.000
|
$150.000
|
$150.000
|
$160.000
|
$172.000
|
$152.000
|
$171.000
|
$155.000
|
$190.000
|
|
|
TACK COAT
|
GAL
|
1,204.000
|
$8.000
|
$5.000
|
$2.500
|
$10.000
|
$1.500
|
$3.750
|
$6.000
|
$5.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$9,742.500
|
$10,500.000
|
$20,000.000
|
$15,000.000
|
$10,000.000
|
$12,500.000
|
$9,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
80.000
|
$350.000
|
$394.700
|
$150.000
|
$300.000
|
$250.000
|
$350.000
|
$250.000
|
$550.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
640.000
|
$105.000
|
$3.000
|
$35.000
|
$1.000
|
$50.000
|
$95.000
|
$55.000
|
$135.000
|
|
Totals: |
$2,804,613.000
|
$2,852,725.750
|
$2,918,260.150
|
$2,951,869.630
|
$3,088,413.300
|
$3,245,898.070
|
$3,288,220.500
|
$3,920,755.810
|